IMACS:
Inamori-Magellan Areal Camera and
Spectrograph
Magellan SAC Status Report
17/18 May 2003
Univ. of Michigan, Ann Arbor
17/18 May 2003
IMACS SAC meeting update
1
17/18 May 2003
IMACS SAC meeting update
3
17/18 May 2003
IMACS SAC meeting update
4
Optics Status:
Field lens and Collimator optics :
done, installed
f/4 camera optics:
done, installed
f/2 camera optics*:
done, installed
Grisms:
200 l/mm*
done, installed
300 l/mm
ready to mount in cell
600 l/mm
ready to mount in cell
2 sets, CTIO B,V,I,
done, installed
2 sets of CTIO R
done, installed
CTIO U (LCAM)
awaits ADC coating
Filters:
*new since last report
17/18 May 2003
IMACS SAC meeting update
5
Optics Status cont.
Imaging Mirrors:
Ag mirror installed
Al mirror ready to mount
Echellette Optics
Grating
done
Prism (Zygo)
due end of May
Durham IFU:
17/18 May 2003
due end of May
IMACS SAC meeting update
6
Mechanical Engineering Status:
Guide camera stages (Hare)
done, mounted
Calibration lamp system (Hare)
done, mounting IP
Mask server (Bigelow)
done, mounted
Field Lens (Hare)
done, mounted
Shutters (Hare)
done, mounted
Filter servers (All hands...)
done, mounted
Disperser server (Hare)
done, mounted
17/18 May 2003
- 6 Grating cells (Bigelow)
done, mounted
- 3 Grism cells (Bigelow)
1 done, 2 IP
- 2 Mirror cells (Bigelow)
1 done, 1 IP
IMACS SAC meeting update
8
IFU mass dummy and old center field guider
17/18 May 2003
IMACS SAC meeting update
9
New center-field guide camera stage
17/18 May 2003
IMACS SAC meeting update
10
4 of 6 grating cells
17/18 May 2003
IMACS SAC meeting update
11
Grating cell mounted in tilt mechanism, on DSS wheel
17/18 May 2003
IMACS SAC meeting update
12
Mechanical Engineering cont.
Collimator mech. (Bigelow)
done
f/4 camera opto-mech. (Bigelow)
done
f/2 camera opto-mech. (Bigelow)
done
Dewar (Luppino)
done
Instrument Structure (Gunnels)
done
Instrument Carriage (Gunnels)
done
Instrument Enclosures (Gunnels)
done
Instrument Utility wrap (Gunnels)
done
17/18 May 2003
IMACS SAC meeting update
13
“Changing the oil” in the short camera quartet
17/18 May 2003
IMACS SAC meeting update
14
Short camera with quartet installed
17/18 May 2003
IMACS SAC meeting update
15
Installing the f/2 camera
17/18 May 2003
IMACS SAC meeting update
16
200 l/mm grism in cell, on DSS wheel
17/18 May 2003
IMACS SAC meeting update
17
Science array CCDs installed in dewar
17/18 May 2003
IMACS SAC meeting update
18
Dewar integrated with SA controller
17/18 May 2003
IMACS SAC meeting update
19
Grism spectra with “Gus’ mask”
17/18 May 2003
IMACS SAC meeting update
20
Flexure map, f/2 camera, imaging mode
17/18 May 2003
IMACS SAC meeting update
21
Flexure map, f/4 camera, imaging mode
17/18 May 2003
IMACS SAC meeting update
22
Electronic Engineering (Baggish):
Schematics design (all motion stages)
done
(4) Motion control (MC) chassis,
done
(1) Power supply chassis,
done
(1) Shutter control chassis
done
(2) Electronics racks for chassis
done
(2) SA + FC power supply chassis
done
(2) Guider power supply chassis
done
Instr. wiring harnesses
done
Temperature, pressure, voltage sensors
17/18 May 2003
IMACS SAC meeting update
IP
23
Detector systems:
Flexure sensor detectors
- First light on first sensor 5/15/03!
Science array CCD/controller performance:
- SITe RN spec: 4.5e- min < 5.2e- typ < 6.5e- max, 20us/px
- Measured single chip RN 3.5e- at 10us/px
- Full array 4.8e- at 10us/px (estimate, not optimized)
- No measurable crosstalk
- CCD operating temperature: -110C
- Column-wise image bleeding - in CCDs?
- Additional cold room testing in May
17/18 May 2003
IMACS SAC meeting update
24
First light image from one of two flexure
control detectors in the IMACS focal plane.
17/18 May 2003
IMACS SAC meeting update
25
Software:
Instrument Control (Birk)
Individual module testing:
Module
Pr. Guider
SH guider
CF guider
Slit Mask Server
Disperser Server
Long Camera Focus
Filter Servers (2)
Flexure Control (LUT)
Detector Focus
HP Sensor System
17/18 May 2003
GUI status
done
done
done
done
done
done
done
done
done
done
IMACS SAC meeting update
SW/HW Int.
done
done
IP
done
done
done
done
done
done
IP
26
Software:
Instrument Control cont.
Test and integration instrument control:
- One GUI at this level, showing all
critical aspects of each module:
ready to ship
User Level Software:
- Two GUIs at this level:
- Instrument control interface:
ready to ship
- Graphical Instr. Status Display:
ready to ship
17/18 May 2003
IMACS SAC meeting update
27
Software:
Science Array Control (Birk)
Shutter control:
- micro-controller for linear motors
done
CCD readout / camera control:
- “ccdserver” for array readout
ready to ship
- “camgui” for user interface
ready to ship
Quick-Look Tool:
17/18 May 2003
ready to ship
IMACS SAC meeting update
28
Coming up:
- Function and performance testing (in progress)
- Cold testing of mechanisms (in progress)
- Cold testing of optical systems
- Thermal focus look-up table for f/4 camera
- Flexure maps and control loops (open and closed)
- Plumbing of liquid cooling system (in progress)
- Installation of air over-pressure and circulation systems
- Mounting of last two grisms and Al imaging mirror
- Design of echellette opto-mechanics
- Final test and integration of FC detectors (“wing chips”)
17/18 May 2003
IMACS SAC meeting update
29
Shipping and installation:
- Pre-shipment review 5/28/03
- External reviewers:
- Harland Epps, UCSC
- Jerry Nelson, UCSC
- Dan Fabricant, Harvard/SAO
- Bob Fata, Harvard/SAO
- Disassembly starts week of 6/16/03
- Shipment to Long Beach on 7/1/03
- Columbus voyage #357 departs 7/5/03, arrives 7/23/03
- Container arrives at LCO on or around 8/1/03
17/18 May 2003
IMACS SAC meeting update
30
Shipping and installation:
Continued:
- Installation preparation starts 8/1/03
- Installation time runs 8/6 - 8/18
Local Preparations:
- Installation schedule (Bigelow)
90%
- Commissioning schedule (Dressler, Oemler)
IP
- Shipping plan (Bigelow)
IP
- LCO Support agreement (Bigelow, Dressler)
IP
- Shipping crates and containers (OCIW)
90%
17/18 May 2003
IMACS SAC meeting update
31
Shipping and installation:
- Instrument document suite (all web-based):
17/18 May 2003
- Engineering manual + drawings
IP
- Electronics manual + schematics
IP
- Software manual
IP
- Detector systems manual
IP
- User’s manual
IP
IMACS SAC meeting update
32