Transcript Slide 1
IRSE Seminar - Fibre Acoustic Monitoring
Andy Rowland Head of Propositions
BT Global Services
January 2010
Business Applications
TOA for Level Crossings
Copper Cable Theft
Damage to networks
Flat Wheel Detection
Train Tracking
Bridge Collision Warning
Points Monitoring
Integrity Monitoring
Proof of Attendance
Distributed Acoustic Sensing using Fibre
Stress Force Caused by Acoustic Wave
Strain
Coherent Light
Coherent Phase-Modulated Light
How the Fibre Sensor Works
The fibre is the sensor
Measurements all along a 10km fibre = 10,000 sensors!!
Standard multi- or single-mode optical fibre
T1
T2
T3
T4 ……….
Backscattered light provides
measurement point every 1m
1m pulse of light
T9,995
T9,996
T9,997
T9,998
T9,999
Classification of Sounds
Detect event exceeds threshold
Use Geo-Fence to exclude legitimate
activity
Use algorithms to classify sounds –
based on self organizing neural
networks, also known as Kohonen
Maps.
Examples of classification:
Trains
Cable handling
Lifting of lids
Walking on track ballast
Evolution of Fibre Sensing
BT Engineers Tracing Fibre Underground
Lid On
Lid Off
Van Horn
Tap
Initial Tests with UK Water Company
Resilience Test with Jet Engine
Initial Testing with Rail
1.5m over 50km
If train speed is ≈144km/hr or 40m/sec then the following distances apply
182m
20m
Train length is 8 carriages + engine
12m
Commuter train leaving on welded
rail approaching viaduct crossing the
viaduct, then crossing points.
1.6m
Sound file of express train
possibly crossing a point
or rail gap.
Initial Implementation for Rail – Copper Cable Theft
Major Operational delays as a result of stolen Infrastructure
Increased delay minutes
Millions of Pounds lost by replacement of stolen Copper Cable
Punitive penalties relating to operational delays
Substantive resource tied up in preventative operations
Safety implications both passengers and trackside
CCT Deployment for Major European Rail Operator
BT
intranet
Control Room
Staff
CCT Portal View
BT detected and logged
CCT activity on 5th Sep
21.46. Alarm raised.
Theft preparation activity
detected 6-Sept at 21.57.
Alarm raised.
Theft preparation activity
detected 7-Sept at 21.57.
Alarm raised.
Theft activity events
detected 8-Sept 04:30.
Large number of events
logged between 4:30 and
6:30.
Cable cut event 6:34. Client
detected signal and power
failure at 6:40
BT detected cable being
removed from site till 7:04
direction of travel away from
level crossing Last theft
activity detected at 7.21.
Client onsite activity
detected commencing at
08:40. Client called BTP at
8:55 to report theft.
Client & BTP activity logged
until 10:40.onsite
Collaborative Innovation – Level Crossing Monitoring
Visibility of trains actual positions, speed and direction to signal box staff independently of
signalling system infrastructure
Countdown predictions in real-time of
The ‘Time Of Arrival’ (TOA) at User Worker Crossing (UWC)
Timing gaps between trains arriving User Worker Crossing (UWC)
Categorize train movement predictions by train type
Express, local, freight
Detection of stopped trains location
Categorize train arrivals based on route
Categorize train arrivals based service identity and timetable information
Track Tracking and Level Crossing Monitoring
Level Crossing
ToA 2
T3
T5
T1
Cable reel
12.75-13.00
Time
ToA 5
Seconds
T2
Sensor
ToA 3
ToA 4
Speed
Meters
T4
Distance
Key Differentiators
Technology
We use two world class sensing technologies
Competitors can provide specific elements only BT can provide an end to end
solution
BT can provide 11 different sensor technologies, to help eliminate false positives
World class GIS mapping to provide accurate location of problem
Highly developed classification software to identify accurately incidents
Protected by multiple Patents
Credibility & Experience
BT has one of the biggest fibre network in the world as part of it’s 21CN
programme
We have the only deployment working in a hostile trackside environment, covering
24 sensors and 504km.
Our current rail customer is sufficiently pleased with the solution that we are now
being pressed to add additional applications.
Thank you
Offices worldwide
Telecommunications services described are subject to availability and may be modified from time to time.
Services and equipment are provided subject to British Telecommunications plc's respective standard
conditions of contract. Nothing in this publication forms any part of any contract.
© British Telecommunications plc 2010