Collaboration and Competition
Glenn Ballard
AOM 2010
Montreal, Canada
How maintain productive tension between
collaboration and competition?
• Externally imposed demands
• Self-imposed goals
“Lower the river to reveal the rocks.” (Taiichi
Ohno, Chief Engineer, Toyota)
2005
CURRENT
Proposed Building Area:
1,298,500 BGSF
914,757 BGSF
Number of Stories (incl.
below grade Parking and
CUP):
21
18
Total No. of Beds:
620
555
Total No. of LDRs:
24
24
Total No. of ORs:
19
19
Total No. of ER Treatment
Rms:
34
34
Loading Dock Location:
Access off Post St.
Access off Franklin St.
Ambulance Location:
Access off Franklin
St.
Access off Post St.
Total No. of Parking
Spaces:
620
555
90% of the program in 70% of the space.
Initial target cost for construction=$911 million, 14% below market
Innovation – Making Creativity and Learning Safe
The “Patient Boom” – Combined Patient Lift and Medical Boom