Rapport d`activité 2007
Download
Report
Transcript Rapport d`activité 2007
From the first
to the second management cycle
Ministry of ecology, sustainable development and
energy (MEDDE)
Water and Biodiversity Directorate
Cécile Gözler
Ankara, 2013 Novembre 28-29th
1
Ministère de l’écologie, du développement durable et de l’énergie
WWW.developpement-durable.gouv.fr
European report from assessment of
the 1st RBMP
Less than 50 % of WB in good ecological status in
2009 due to
Diffuse pollution for agriculture
Hydromorphology
Bad treatment for waste waters
Issue of water scarcity (mainly in South countries)
with an increasing demand and conflicts for the use
Increase of floods and droughts events due to
anthropogenic pressures and climate change
2
Ecological status –2009
FR
12
10
8
35%
1 colonne
2 colonne
3 colonne
6
+24%
4
2
41%
0
1 ligne
2 ligne
3 ligne
4 ligne
3
Main objectives for the future
Achieve the good status in 2015, 2021 or 2027 at
latest according to the WFD
Reduce hydric stress and ensure ecological flows
Reduce vulnerability to extreme events and climate
change
4
Actions for the 2nd cycle
New CIS with new WG on new topics
Emerging topics : e.g. ecological flows
Economics issues : water pays for water, water accounts,
…
First inventory of discharges, emissions and losses for
dangerous priority substances
Strengthening DPSIR approach
List of pressures reviewed for article 5
Identify clearly driving forces causing failure
Set up a direct link from measure to pressure
Links WFD with other directives
5
Some issues for the 2nd RBMP in FR
Issues of European intercalibration not ended
New rules for quality assessment
new parameters / QEs and improved knowledge thanks
to the strengthening of monitoring downgrade more WBs
than in the 1st RBMP
One Out All Out principle : 1 parameter in bad
status => Entire Water body in bad status
does not enable to show progress made for many
parameters
need to communicate on progress made compared to
the financial investments
6
Some issues for the 2nd RBMP in FR
Objectives of Protected areas aimed by the WFD
Coordination between WFD, FD and MSFD
a strong common schedule
5b_Calendrier Révision des SDAGE-PdM et
articulation avec DI et DCSMM_21-10-2013.pdf
7
8
Conclusions
Directives are constraining but are real
opportunities not to be missed
Benefiting from the previous experience of 1st
RBMP
Cycles are overlapping (implementation and
planning for the future)
Communicating on the results and progress made
during first cycle.
9
Teşekkür ederim
10
10