Community-based Adaptation Project
Inception Workshop
CBA Database Additions
© 2007 UNDP. All Rights Reserved Worldwide.
Proprietary and Confidential. Not For Distribution Without Prior Written Permission.
CBA Inception Workshop
CBA Projects have a few additional data entry requirements
CBA projects will have similar database reporting requirements
to SGP projects, with some additions:
–Different funding source
–Additional indicator system
1 1
CBA Inception Workshop
CBA projects are entered in the same way as SGP projects
2 2
CBA Inception Workshop
The funding source should be
set to “Strategic Priority on
Adaptation”
3 3
CBA Inception Workshop
Projects must choose “Climate Change Adaptation” as a focal
area, as well as the other focal area(s).
“Climate change adaptation” should be set as 100% of the
funding source. The other focal area(s) should be set to 0%.
4 4
CBA Inception Workshop
CBA projects will use the focal area indicator system, as well as
the Climate Change Adaptation indicator system.
5 5
CBA Inception Workshop
The input screen for the VRA
indicator system.
•The target value will always be
“10”
•The achievement is the score
that the community arrives at for
each question
•Date of measurement
•Input the contents of the H-form
into the boxes
6 6
CBA Inception Workshop
All seven VRA questions and corresponding H-form data must
be entered.
7 7
CBA Inception Workshop
The indicator screen, with focal area indicators, and adaptation
indicators.
8 8
CBA Inception Workshop
All other fields (GPS location, project impact, etc) should be
filled out as in SGP projects.
9 9