Transcript Slide 1

Upgrading Line 500 to ERP 1000
By
Jason Davis
Renishaw PLC
7/17/2015
Slide 1
Introduction
• Not here to sell ERP 1000 or to explain all the functionality.
• Why? Sage have announced end of support for Line 500, therefore
some, it not all of you may be thinking about migrating.
• Agenda
– Why we upgraded, the business case
– Upgrade steps
– Benefits
– Potential pitfalls
– Conclusion
– Questions
7/17/2015
Slide 2
Background - Renishaw Diagnostics Ltd
•
•
•
•
•
Renishaw Diagnostics Ltd- based in Glasgow, Scotland
Around 40 Employees
Developing system for multiplex screening of infectious disease
Using Line 500 since 2005 (12 users).
Want to sell in Regulated markets therefore required a “validated
computer system”
7/17/2015
Slide 3
Why was Diagnostics a good Candidate?
•
•
•
•
Small user base
Standalone implementation
No FCE usage (unlike the rest of the group)
No initial requirement for the ERP 1000 additional components
(Actionable Lists and Sage Report Designer)
• Migration could be treated as a ‘re-implementation’ for validation
purposes.
7/17/2015
Slide 4
Migration Project Steps
• Initially evaluated ERP 1000 in 2010 including new features
(Actionable lists and Sage Report Designer). Sage assisted with
language issues.
• Several trial runs of the migration process
• User demonstrations / training
• GO LIVE – March 2012
Line 500 v7.0
Line 500 v7.1
ERP 1000 v3 + SP1
Forms Migration
7/17/2015
Slide 5
ERP 1000 Benefits
•
•
•
•
•
•
•
•
•
Windows Logon
Modern look and feel of the User Interface
Much improved browse functionality
Full descriptions of coded fields e.g. Shipping Note Required (N/Y/H)
Date pickers
Actionable Lists?
Sage Report Designer?
Database structure / server side components almost identical to L500
Performance of web browser user interface.
• FUTURE BENEFITS
– Continued development from Sage
– Sage CRM integration
7/17/2015
Slide 6
Things to look out for
• Forms – Migration Wizard needs careful configuration else a daunting
amount of errors appear by default.
• Forms Designer (now Layout Manager) very different.
• Redundant processes that may lock records (scheduled restart Sage
ERP 1000 services every night which clears them)
• Sensitive to version of Java VM
• Not all VB6 FCEs work without modification.
• Actionable Lists and Sage Report Designer can be temperamental
7/17/2015
Slide 7
Plans for the Future
• Project underway to determine group migration plan
• ERP 1000 v4 due for release end of the year (Sage CRM Integration)
• New things to consider
– FCEs
– Switching on new features, Actionable Lists, Sage Report Designer
7/17/2015
Slide 8
Conclusion
•
•
•
•
•
•
Reasonably straight forward migration process
Provides improved front end appearance and usability
Minimal user retraining
Positive user feedback
Possible benefits from Actionable Lists and Sage Report Designer
Current product!
7/17/2015
Slide 9
Questions
Any Further Questions?
7/17/2015