Endcap Module Status
• Agreed Responsibilities
• Overall Production
• UK Situation
• Global Schedule Issues
• General Production Issues
Agreed Module Distribution
Inner
Outer
Total
160
208
528
UK
80
104
184
VLC
GVA
520
520
Melb
104
104
400
UK
160
VLC
MPI
NIKHEF
Middle
400
80
80
Freib.
160
160
Total
400
1976
640
936
Inner
Outer
Total
192
250
634
96
125
221
GVA
624
624
Contingency
Melb
125
125
× 1.2
MPI
NIKHEF
192
Middle
480
480
96
96
Freib.
192
192
Total
480
768
1123
2371
Overall Production
http://ific.uv.es/~lacasta/ECproduction/
• Proceeds smoothly
– ~816 module starts
(35% of total)
• 70% tested of which
– Yield: 88% (good), 92%(good+pass)
Still OK but seems to be dropping slightly
• Components:
– No stocks building up for spines or hybrids
• Very vulnerable to component delays
Summary
Built
Good
Pass
Hold
Failed
Not tested
Yield (G)
Yield (G+P)
All
816
361
17
24
9
405
87.8%
92.0%
Clusters
Built
Good
Pass
Hold
Failed
Not tested
Yield (G)
Yield (G+P)
UK-V
410
215
14
21
8
152
83.3%
88.8%
CS
222
133
2
1
0
86
97.8%
99.3%
CE
184
13
1
2
1
167
76.5%
82.4%
Types
Built
Good
Pass
Hold
Failed
Not tested
Yield (G)
Yield (G+P)
Outer
453
242
10
13
5
183
89.6%
93.3%
Inner
101
0
0
0
1
100
0.0%
0.0%
MidL
179
106
6
9
3
55
85.5%
90.3%
MidS
83
13
1
2
0
67
81.2%
87.5%
Sites
Built
Good
Pass
Hold
Failed
Not tested
Yield (G)
Yield (G+P)
Freiburg
29
0
0
0
0
29
NaN
NaN
Geneva
221
133
2
1
0
85
97.8%
99.3%
Manchester
306
135
9
13
6
143
82.8%
88.3%
Manchester-Inn
0
0
0
0
0
0
NaN
NaN
Manchester-Mid
83
26
1
1
1
54
89.7%
93.1%
Manchester-Out
223
109
8
12
5
89
81.3%
87.3%
Melbourne
1
0
0
0
0
1
NaN
NaN
MPI
83
13
1
2
0
67
81.2%
87.5%
Nikhef
72
0
0
0
1
71
0.0%
0.0%
Valencia
104
80
5
8
2
9
84.2%
89.5%
Valencia-Mid
96
80
5
8
2
1
84.2%
89.5%
Valencia-Out
8
0
0
0
0
8
NaN
NaN
Site
Starts Bonded Unbonded Good
Tested Total
Failing Tested
Incomplete
OK Fail Total
UK Outers in Database as of 31/8/04
Glasgow
64
44
20
12 75%
4
16
39
9
48
Liverpool
141
124
17
100 92%
9
109
27
5
32
Manchester
25
0
25
0 0
0
0
23
2
25
In Transit
7
0
7
0 0
0
0
6
1
7
Other
0
0
0
0 0
0
0
0
0
0
Totals
237
168
69
112 90%
13
125
95
17
112
UK Middles in Database as of 31/8/04
Glasgow
0
0
0
0 0
0
0
0
0
0
Liverpool
82
60
22
49 94%
3
52
29
1
30
Manchester
1
0
1
0 0
0
0
0
1
1
In Transit
0
0
0
0 0
0
0
0
0
0
Other
0
0
0
0 0
0
0
0
0
0
Totals
83
60
23
49 94%
0
52
29
2
31
Thanks to Joe Foster for summary
Overall Schedule
• Still some delay
– Foreseen to finish last module by
end June 2005
– GVA and MPI have increased
their production rates
– Could be earlier (during May) if
sites soon approaching their
agreed number of modules, keep
their production lines running.
• VLC helps MPI with middles
• NIKHEF helps Freiburg with
Inners
– Melbourne has to start very soon.
• Already pre-qualified.
UK Modules
Production Issues
•
Disk measurements showed redundancy link operation increases noise:
–
–
Trials have led to new (screened) links and requirement to change module 5.1kΩ
resistor on redundancy line
All UK modules at Liverpool now have shorted out resistor with 0Ω resistor following
procedure proposed by Freiburg
•
–
–
•
20% sample test show identical normal electrical performance after change
All new hybrids have 0Ω resistor
Disk results with these changes greatly improved, disc9C mounting to begin
Repeat of contamination/erosion of tracks on fan-in after thermal cycling.
•
•
•
Seen in one early Liverpool Module
Now seen on two MPI modules in the
same place as at Liverpool
Chemical analysis soon at CERN
•
Spine QA and delivery still critical
•
Prague CTU and Melbourne still to qualify
•
Most other sites producing at or above original
envisaged rates and UK is nearing half-way