Lutalo Webb
Materials Update
• Resistors
– .25 watt power rating
– Tolerance: 5%
– Have been collected from EECE Labs (as have transistors)
• Diodes (investigation with A.B. Bonds)
– IN4148/1N914: Same diode
– 1N5232 Zener diode
• Digikey A2096 DB-9 Connector
– Out of Stock on DigiKey.com
• Meeting with Lewis on 2/10/09 to discuss options with
local vendors
– Axial electrolytic capacitor
– 1N5232 Zener Diode
Meeting with Lewis
• iButton on CIP Module
– Used once or twice yearly
• Obtained tracking information for banana
plugs
– Ground shipping (5-7 business days)
– Should arrive on Thursday
Next Steps
• Final checking and ordering of PCB
• Hands on familiarization of crimping
techniques
• Research and acquisition of heat shrink tubing
cables
• Materials meeting with Lewis tomorrow