Description - Huawei.com

Download Report

Transcript Description - Huawei.com

Wireless OSS Documentation Improvements Roadmap
OSS10.0 (2010)
Description:
• Network Impact Report (M2000/CME)
Installation and Commissioning:
• Optimized Operation Guide with NE
Integration (M2000)
• Matrix of Communication Ports on OM
Networks
Operation and Maintenance:
• Technical Specifications (M2000)
• Data Configuration Principles (CME)
• E2E NE Commissioning Process (M2000)
Release Documentation:
• GUI Changes in the Release Notes
(M2000)
Documentation Presentation:
• JavaHelp to HedEx
• BTS Creation Tutorial Demo (CME)
• Context-Specific Online Help for NE
MO/Performance Counter (M2000/CME)
Released
Planned
OSS11.0 (2011)
OSS12.0 (2012)
OSS13.0 (2013)
Description:
• Network Impact Report (PRS)
• Hardware Description (M2000)
Installation and Commissioning:
• Security Hardening Documents (M2000)
• Antivirus Operation Guides
Operation and Maintenance:
• Security Administrator Guide
• Operation Rights Reference (M2000)
• Examples of User Management Scenarios
(M2000)
• Optimized M2000 Alarm Reference (M2000)
• Troubleshooting Guide (M2000)
NBI Documentation:
• NBI Interconnection Process Cases (M2000)
Documentation Presentation:
• Easy Search in the Hardware Installation
Guide (M2000)
• Hot Spot Navigation (M2000)
Description:
• Fault Management Function Description
(M2000)
• Performance Management Function
Description (M2000)
Installation and Commissioning:
• Optimized Data Collection Operation Guide
(PRS)
• Security Hardening Documents (PRS)
Operation and Maintenance:
• LTE Trace/Monitoring Parameter
Reference (M2000)
• Overview of Fault Operations (M2000)
• Map of CME Functions (CME)
• Optimization of MBTS Initial Configuration
(CME)
• Correlation with NE Feature Parameter
Description (CME)
Release Documentation:
• Version Changes Classified by Network
Type (M2000)
Documentation Presentation:
• Optimized Navigation of Online Help
(M2000/PRS)
Description:
• Software Management Function Description
(M2000)
• SingleOM Solution Feature Description
(M2000/CME)
• Efficient Trouble Ticket Dispatching Feature
Description (M2000)
• Cell Outage Detection and Recovery - LTE
Feature Description (M2000)
• Automatic Micro NodeB Planning - WRAN
Feature Description (M2000)
Installation and Commissioning:
• Software Installation Guide and Upgrade
Guide Combined (CME)
Operation and Maintenance:
• Supplemented Descriptions of Transport
Layer and Radio Layer Services in SRAN8.0
Base Station Initial Configuration (CME)
• Supplemented GSM/UMTS Reconfiguration
Scenarios on the CME (CME)
• Map of PRS Functions (PRS)
Release Documentation:
• License Changes (M2000)
• Operation Rights Changes (M2000)
• Version Changes Classified by Application
Field (PRS)
Documentation Presentation:
• Hot Spot Navigation (PRS)
M2000 V200R011
CME V200R011
PRS V100R007
M2000 V200R012
CME V200R012
PRS V100R008
M2000 V200R013
CME V200R013
PRS V100R009
M2000 V200R010
CME V200R010
PRS V100R006
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 1
Network Impact Report
M2000 V200R010
CME V200R010
Description:
By reading this document, you can learn about the
mapping between the new release and NEs, requirements
for hardware expansion, version upgrade mode, and
changes of alarms, events, and ports.
Benefits:
This document helps customers to prepare for version
upgrades or plan new products.
Helps to learn differences between versions, plan version upgrades, and plan new products.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 2
Matrix of Communication Ports on OM Networks
M2000 V200R010
CME V200R010
PRS V100R006
Description:
This document describes the O&M ports that need to be
opened for communication between the OSS and NEs
when a firewall is deployed, and the procedure for
designing O&M communication ports.
Benefits:
This document helps users to set the firewall and
increase the commissioning efficiency during onsite
deployment.
Provides guidance for setting the firewall and increases the commissioning efficiency during onsite deployment.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 3
Operation Rights Reference
M2000 V200R011
Network Management Application
Network Device
Description:
Benefits:
This document describes the operation rights on the
M2000 clients, including rights to operate network
devices and OSS applications.
This document provides a reference for granting
operation rights, facilitating user management, and
increasing the efficiency of granting operation rights.
Facilitates user management and increases efficiency in granting operation rights.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 4
Troubleshooting Guide
M2000 V200R011
Description:
This document describes the procedures and methods
for troubleshooting M2000 faults. At present, only the
troubleshooting guide for the M2000 system based on
the Solaris 10 OS and Sybase 15 database is available.
Benefits:
This document helps customers to maintain networks
and perform troubleshooting, increasing O&M
efficiency.
Helps customers to perform troubleshooting and increases network O&M efficiency.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 5
Performance Management Function Description
M2000 V200R012
Description:
This document describes the basic principles,
procedures, feature interactions, and specifications of
the M2000 performance management function.
Benefits:
To continuously improve the network Quality of Service
(QoS), this document helps customers to get familiar
with the M2000 performance management function,
better understand the network operating status, and
effectively prevent faults from affecting network
services.
Helps customers to get familiar with the performance management function and continuously improves network QoS.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 6
Overview of Fault Operations
M2000 V200R012
Description:
This document provides all fault
management operations in one
figure. You can click any hot spot in
this figure to obtain detailed
operation information.
Benefits:
This document helps customers
to comprehensively understand
fault settings, monitoring alarms,
and routine maintenance methods,
guides customers through fault
management operations, and
improves network O&M efficiency.
Helps customers to get proficient in fault management operations and increases network O&M efficiency.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 7
Version Changes Classified by Network Type
M2000 V200R012
Description:
The M2000 Release Notes
document classifies new features
and resolved issues by network
type.
Benefits:
This document helps customers
to quickly and easily obtain
version changes related to
specific customer networks.
Helps customers to quickly obtain required version changes.
HUAWEI
TECHNOLOGIES
CO., LTD.
HISILICON
SEMICONDUCTOR
Page 8