2
Solar Sailing:
3
Project Overview
– Motivation
– Scope
– Organization (tasks [%complete], groups,
[who?])
– Present the scope of your design work. What are
you setting out to do?
– Explain how you have organized the work. What
are the major tasks? What groups have you
organized your team into, and who is in each
group?
4
Team Members
Orbit: Eric Blake, Daniel Kaseforth, Lucas
Veverka
Structure: Jon Braam, Kory Jenkins
ADC: Brian Miller, Alex Ordway
Power, Thermal and Communication:
Raymond Haremza, Michael Hiti, Casey
Shockman
System Integration: Megan Williams
5
Design Strategy
Not yet complete. Needs:
– Describe all of the trade studies you are considering in this project
– Describe the trade study conclusions and any other design decisions
that you have already made
– Discuss the unfinished trade studies and what effect they will have
on your design
– Summarize the key properties of the mission (orbit, anticipated
lifetime, candidate launch vehicles)
– Summarize the key properties of the spacecraft (mass, dimensions,
peak and average power requirements, ADCS configuration, type of
propulsion system, list of any moving parts, other important info as
you see fit)
– Show a 3D diagram of the spacecraft (use a CAD package, ie Solid
Works or Pro-E)
6
Trade Study Results
7
Cost Estimate
Delta II Launch:
$42,000,000.00
Navigation System:
Carbon fiber booms:
$
250,000.00
Aluminum Bus:
$
1,200.00
2 stepper motors (sail deployment):
$
80,000.00
Heater:
Helium Tank:
Star Tracker:
$ 1,000,000.00
4 Step Motors (sliding masses):
$
160,000.00
Reaction Wheels:
$
600.00
Thrusters:
Antenna Horn:
Thermal Coating:
Sail material:
Solar Panels:
Total:
$43,491,800.00
Before Launch
$ 1,491,800.00
Orbit
Eric Blake
Daniel Kaseforth
Lucas Veverka
Eric Blake
Optimal Trajectory of a Solar Sail:
Derivation of Feedback Control Laws
10
Recall Orbital Mechanics
• The state of a spacecraft can be described
by a vector of 6 orbital elements.
– Semi-major axis, a
– Eccentricity, e
– Inclination, i
– Right ascension of the ascending node, Ω
– Argument of perihelion, ω
– True anomaly, f
• Equivalent to 6 Cartesian position and
velocity components.
11
Orbital Elements
12
Equations of Motion
v
rv
^
^
r 2 r n n
2
^
r
r2
^
^
^
n cos r sin cos p sin sin p r
= Sail Lightness Number
= Gravitational Parameter
^
p
n
sun line
sail
^
^
p r
^
r
13
Problem: Minimize Transfer
Time
^
H ( x, , u ) r v 2 v r 2 r n v n 1
r
2
^
r
^
^
r 3 v 3 5 (r r )r 2 3 (r n)(v n) n 2(r n) r
r
r
r
^
v r
^
p
By Inspection:
^
^
max{ n v } n v
Transversality:
^ 2
^ 2
(
r
n
)
p
n
(
r
n
)
p
n
v
v
r2
2
t t 0 r
t t f
n
sun line
sail
^
^
p r
^
r
14
Solution
• Iterative methods are needed to calculate costate boundary conditions.
• Initial guess of the co-states must be close to
the true value, otherwise the solution will not
converge.
• Difficult
• Alternative: Parameter Optimization.
– For given state boundary conditions, maximize
each element of the orbital state by an
appropriate feedback law.
15
Orbital Equations of Motion
x g ( x, , )
d
r3
sin( f )W
df
p sin i
da
2 pr
p
Se
sin
f
T
df (1 e 2 ) 2
r
2
r
de r
r
S sin f T 1 cos f T e
df
p
p
d
d
r2
r
cos i S cos f T 1 sin
df
df
e
p
di r 3
cos( f )W
df p
p
df
2
dt
r
2
S
r
r2
cos 3
p
1 e cos f
T
r2
cos 2 sin sin
p a(1 e 2 )
f
r
r2
1
S cos f T 1 sin f
p
e
W
r
2
1
cos 2 sin cos
= Sail Lightness Number
= Gravitational Parameter
16
Maximizing solar force in an arbitrary direction
^
^
^
^
n cos r sin cos p sin sin p r
^
Maximize: aq r n n q
2
~ ^
~
~ ^
~
~ ^
^
q cos r sin cos p sin sin p r
2
r
Sail pointing for maximum
acceleration in the q direction:
^
p
sun line
sail
~
n
^
^
p r
^
r
tan
~
3 9 8 tan
2
~
4 tan
17
Locally Optimal Trajectories
• Example: Use parameter optimization method to
derive feedback controller for semi-major axis
reduction.
• Equations of motion for a:
da
2 pr 2
df
(1 e 2 ) 2
p
Se
sin
f
T
r
p
r
1 e cos f
p a(1 e )
2
Feedback Law:
~
e sin f
tan
1 e cos f
2
tan
S
T
r2
r2
cos 3
cos 2 sin sin
~
3 9 8 tan
2
~
4 tan
Use this procedure for all orbital elements
18
Method of patched local steering laws (LSL’s)
• Initial Conditions: Earth Orbit
a
1
e
0
i
0
0
0
t t0 0
• Final Conditions: semi-major axis: 0.48 AU
inclination of 60 degrees
a
0.48 AU
e
~0
i
60
free
free
t tf free
19
Trajectory of SPI using LSL’s
Time (years)
20
21
Global Optimal Solution
– Although the method of patched LSL’s is not ideal, it is a solution that is
close to the optimal solution.
– Example: SPI Comparison of LSL’s and Optimal control.
22
Conclusion
• Continuous thrust problems are common in
spacecraft trajectory planning.
• True global optimal solutions are difficult to
calculate.
• Local steering laws can be used effectively to
provide a transfer time near that of the global
solution.
Lucas Veverka
•Temperature
•Orbit Implementation
Optimal Trajectory of a Solar
Sail: Orbit determination and
Material properties.
Lucas Veverka
25
Reflectivity Approximation
• Reflectivity constant, r, negatively affects the
solar radiation pressure force.
f 2PArui n n
2
–
–
–
–
P is the solar pressure as a function of distance.
A is the sail area being struck by the solar radiation.
ui is the incident vector.
n is the vector normal to the sail.
• Emissivity and specular reflection neglected.
• Assumed a Lambertian surface.
26
Sail Surface Temperature
Fsolar
Tsurface
2
4d sun
1
4
• Fsolar is the solar flux.
•
•
•
•
α is the absorptance.
ε is the emittance.
σ is the Stefan-Boltzman constant.
dsun is the distance from the sun.
27
Transfer Orbits
• Objective:
-Reach an orbit with semi-major axis of 0.48 AU
and inclination of 60 degrees as quickly as possible.
• Investigated four possible orbits
-Cold transfer orbit
-Hot transfer orbit
-Inclination first transfer orbit
-Simultaneous orbit
28
Cold Transfer Orbit
• Advantages:
– Very simple two-stage transfer.
– Goes no closer to sun than necessary to avoid
radiation damage.
• Disadvantages:
– Is not the quickest orbit available.
• Order of operations:
– Changes semi-major axis to 0.48 AU.
– Cranks inclination to 60 degrees.
• Time taken:
– 10.1 years.
29
Cold Transfer Orbit
30
Hot Transfer Orbit
• Advantages:
– Still simple with three-stages.
– Is a much quicker transfer.
• Disadvantages:
– Radiation is very intense at 0.3 AU.
• Order of operations:
– Changes semi-major axis to 0.3 AU.
– Cranks inclination to 60 degrees.
– Changes semi-major axis to 0.48 AU.
• Time taken:
– 7.45 years.
31
Hot Transfer Orbit
32
Inclination First Transfer Orbit
• Advantages:
– Very simple two-stage transfer.
– Avoids as much radiation damage as possible.
• Disadvantages:
– Takes an extremely long time.
• Order of operations:
– Cranks inclination to 60 degrees.
– Changes semi-major axis to 0.48 AU.
• Time taken:
– 20.15 years.
33
Inclination First Transfer Orbit
34
Conclusion
• Simultaneous transfer is too complicated with
little or no real benefit.
• Inclination first transfer takes too long.
• Hot transfer orbit is much quicker but submits
materials to too much radiation.
• Cold transfer orbit is slower than the hot but
gets the equipment to the desired location
safely.
• Choice: Cold transfer orbit!
Daniel Kaseforth
Control Law Inputs and Navigation
System
36
Structure
Jon T Braam
Kory Jenkins
Jon T. Braam
Structures Group:
• Primary Structural Materials
• Design Layout
•3-D Model
• Graphics
39
Primary Structural Material
Weight and Volume Constraints
• Delta II : 7400 Series
• Launch into GEO
– 3.0 m Ferring
» Maximum payload mass: 1073 kg
» Maximum payload volume: 22.65 m3
– 2.9 m Ferring
» Maximum payload mass: 1110 kg
» Maximum payload volume: 16.14 m3
40
Primary Structural Material
Aluminum Alloy Unistrut
– 7075 T6 Aluminum Alloy
• Density
– 2700 kg/m3
– 168.55 lb/ft^3
• Melting Point
– ? Kelvin
Picture of
Unistrut
41
Primary Structural Material
• Density
• Mechanical Properties
– Allowing unistrut design
• Decreased volume
• Thermal Properties
– Capible of taking thermal loads
42
Design Layout
• Constraints
– Volume
– Service task
– Thermal consideration
– Magnetic consideration
– Vibration
– G loading
43
Design Layout
• Unistrut Design
– Allowing all inside surfaces to be bonded to
• Titanium hardware
– Organization
• Allowing all the pointing requirements to be met with
minimal attitude adjustment
44
Design Layout
• Large Picture of expanded module
45
3-D Model
• Large picture
46
3-D Model
47
Graphics
48
Graphics
49
• The blanks will be filled in soon
50
Trade Studies
Kory Jenkins
• Sail Support Structure
• Anticipated Loading
•Stress Analysis
• Materials
•Sail Deployment
52
Sail Sizing
• Characteristic acceleration is a measure of
sail performance.
2P
ao
s mp / A
s ms / A
• Characteristic acceleration increased with
sail size.
• Higher acceleration results in shorter
transfer time.
• Sail size is limited by launch vehicle size
and deployment power requirements.
53
Sail Support Structure
• Challenge: Design a robust, easy to deploy structure that
will maintain sail shape.
• A 150 x 150 meter sail covers the same area as 5 football
fields. (22,500 square meters)
• Solution: An inflatable boom structure based on the L’Garde
design supports 4 triangular sail quadrants.
• Booms are deployed in pairs to minimize power
consumption.
54
Step 5
Step 1
Deployment cables retract
to pull the sail quadrants
out of their storage
compartments.
Heater: Raises boom
temperature above glass
transition temperature to
75 C.
To sail quadrant
Step 4
Once deployed, booms cool
below glass transition
temperature and rigidize.
Step 2
Inflation gas inlet:
booms are inflated to 120
KPa for deployment.
Step 3
Cables attached to stepper
motors maintain deployment
rate of ~ 3 cm/s.
To deployment motor
55
Estimate Worst Case Loading
Solar Pressure
P = 2/3 P_quadrant
Assumptions:
• Solar Pressure at 0.48 AU
= 19.8 µN/m^2.
• Thin wall tube.
• Sail quadrant loading is
evenly distributed between
3 attachment points.
• Isotropic material
properties.
• Safety factor of 3.
56
Analysis of a Tapered Beam
My
Bending
I
2
EI
Buckling
Pcr
4L2
Shear
VQ
max
Iy
Hoop stress
(inflation pressure)
Section
Modulus
Pmax
t
hoopt
r
x
S ( x) dA (dB dA)
4
L
2
57
•
•
•
Expected deployment loads of 20 N in compression dictate boom sizing.
Booms sized to meet this requirement easily meet other criteria.
Verified using laminate code that accounts for anisotropy of composite materials.
58
Boom Specifications
•
•
•
•
•
Cross-ply carbon fiber laminate.
IM7 carbon fiber
TP407 polyurethane matrix, Tg = 55 deg C
Major Radius = 18 cm, minor radius = 10 cm.
Length = 106 meters.
Analysis of a Composite Laminate:
EL V f E f Vm Em
V f Vm
ET
E
f Em
1
[Q]K [ o z T ]
K
59
Conclusions and Future Work
• Sail support structure can be reliably deployed and
is adequately designed for all anticipated loading
conditions.
• Future Work
– Reduce deployment power requirement.
– Reduce weight of support structure.
– Determine optimal sail tension.
Attitude Determination and
Control
Brian Miller
Alex Ordway
Alex Ordway
60 hours worked
Attitude Control Subsystem
Component Selection and
Analysis
62
Design Drivers
•
•
•
•
•
Meeting mission pointing requirements
Meet power requirements
Meet mass requirements
Cost
Miscellaneous Factors
63
Trade Study
• Sliding Mass vs. Tip Thruster Configuration
– Idea behind sliding mass
64
Trade Study
• Sliding mass ACS offers
– Low power consumption (24 W)
– Reasonable mass (40 kg)
– Low complexity
– Limitations
• Unknown torque provided until calculations are made
• No roll capability
• Initially decided to use combination of sliding
mass and tip thrusters
65
ADCS System Overview
• ADS
– Goodrich HD1003 Star Tracker primary
– Bradford Aerospace Sun Sensor secondary
• ACS
– Four 10 kg sliding masses primary
• Driven by four Empire Magnetics CYVX-U21 motors
– Three Honeywell HR14 reaction wheels
secondary
– Six Bradford Aero micro thrusters secondary
• Dissipate residual momentum after sail release
66
ADS
• Primary
– Decision to use star tracker
• Accuracy
• Do not need slew rate afforded by other systems
– Goodrich HD1003 star tracker
•
•
•
•
•
2 arc-sec pitch/yaw accuracy
3.85 kg
10 W power draw
-30°C - + 65 °C operational temp. range
$1M
– Not Chosen: Terma Space HE-5AS star tracker
67
ADS
• Secondary
– Two Bradford Aerospace sun sensors
•
•
•
•
•
Backup system; performance not as crucial
Sensor located on opposite sides of craft
0.365 kg each
0.2 W each
-80°C - +90°C
68
ACS
• Sliding mass system
– Why four masses?
– Four Empire Magnetics CYVX-U21 Step Motors
•
•
•
•
•
•
Cryo/space rated
1.5 kg each
28 W power draw each
200 °C
$55 K each
42.4 N-cm torque
69
ACS
• Gear matching- load inertia decreases by the
gear ratio squared. Show that this system
does not need to be geared.
1
2
70m a (600sec)
2
a 0.00389 sm2
F ma (10kg )(0.00389 sm2 )
F 0.0389 N
70
ACS
• Three Honeywell HR14 reaction wheels
– Mission application
– Specifications
•
•
•
•
•
•
7.5 kg each
66 W power draw each (at full speed)
-30ºC - +70ºC
0.2 N-m torque
$200K each
Not selected
– Honeywell HR04
– Bradford Aerospace W18
71
ACS
• Six Bradford micro thrusters
– 0.4 kg each
– 4.5 W power draw each
– -30ºC - + 60ºC
– 2000 N thrust
– Supplied through N2 tank
72
Attitude Control
• Conclusion
– Robust ADCS
• Meets and exceeds mission requirements
• Marriage of simplicity and effectiveness
• Redundancies against the unexpected
Brian Miller
•Tip Thrusters vs. Slidnig Mass
•Attitude Control Simulation
74
Attitude Control
• Conducted trade between tip thrusters and
sliding mass as primary ACS
• Considerations
– Power required
– Torque produced
– Weight
– Misc. Factors
75
Attitude Control
• Tip Thrusters (spt-50)
– Pros
• High Torque Produced ~ 1.83 N-m
• Low weight ~ 0.8 kg/thruster
– Cons
• Large Power Requirement ~ 310 Watts
• Lifetime of 2000 hrs
• Requires a fuel, either a solid or gas
76
Attitude Control
• Attitude Control System Characteristics
– Rotational Rate
– Transfer Time
– Required Torque
– Accuracy
– Disturbance compensation
77
Attitude Control
• Requirements
– Orbit
• Make rotation rate as fast as possible
• Roll spacecraft as inclination changes
– Communications
– Within Maximum Torque
• Pitch and Yaw Axis
~ 0.34 N-m
• Roll Axis
~ 0.2 N-m
U
mFz m – sliding mass
M F – solar force
z – distance from cg
M – spacecraft mass
78
Attitude Control
• Pitch and Yaw Axis
•
Rotation Rate = 0.144 rad/hr
~ 8.25 deg.
•
Transfer Time = 5300s ~ 1.47 hrs
•
Required Torque = 0.32 N-m
~ 98.8% of maximum produced
•
Converges to desired angle
Torque Req.
Transfer Time
Slope = 0.00004 rad/s
79
Attitude Control
• Roll Axis
Torque Req.
•
Rotation Rate = 0.072 rad/hr
~ 4.12 deg
•
Transfer Time = 7000s ~ 1.94 hrs
•
Required Torque = 0.15 N-m
~ 75% of maximum produced
•
Converges to desired angle
Transfer Time
Slope = 0.00002 rad/s
Power, Thermal and
Communications
Raymond Haremza
Michael Hiti
Casey Shockman
Raymond Haremza
Thermal Analysis
•Solar Intensity and Thermal
Environment
•Film material
•Thermal Properties of Spacecraft Parts
•Analysis of Payload Module
•Future Work
Thermal Analysis and Design
-Raymond Haremza
83
Design Approach Strategy
84
Decision to take “cold” orbit
By taking longer to get to 0.48 AU, we in
turn reduce the amount of design, analysis,
production time and weight.
Solar Sail Material and Thermal
Analysis
85
86
Payload Panel Analysis
The Carbon-Carbon Radiator has aluminum
honeycomb sandwiched between it, and
has thermal characteristics, Ky=
Kx=230W/mK, and through the thickness
Kz = 30W/mK which allows the craft to
spread its heat to the cold side of the
spacecraft, but also keeping the heat flux to
the electric parts to a minimum.
Material Properties
0.06
0.78
E 1.2e7 psi
G 6.11e6 psi
v 0.32
87
Spacecraft Heat Transfer Analysis
4 10 26 W
flux
2
2
4 d
m
7.00E+03
6.00E+03
5.00E+03
4.00E+03
3.00E+03
2.00E+03
1.00E+03
0.00E+00
9.80E-01 8.80E-01 7.80E-01 6.80E-01 5.80E-01 4.80E-01
Qsun flux A Watts
Distance from Sun (AU)
Qsun
Tsurface
Atotal
1
4
Kelvin
Solar Intensity (flux) (W/m^2)
Solar Intensity vs Distance
88
Heat Transfer Analysis
Qsun flux A
4
Qrad Atot Tsurf
Tsurf
Qsun
Qrad
1
4
Setting the heat fluxes together yields the
surface temperature of the object based on
emmissivity, absorbitivity, size and geometry of
the object.
Atot
A
Thermal Analysis of Payload
Module
89
Thermal Analysis of Payload
Module
90
91
Temperature vs Distance (Side of Payload
Module)
300
280
Temperature (K)
260
85 deg
80 deg
75 deg
70 deg
65 deg
60 deg
55 deg
240
220
200
180
160
140
120
100
4.80E-01
5.80E-01
6.80E-01
7.80E-01
8.80E-01
Distance from Sun (AU)
9.80E-01
92
Temperature vs Distance (Top of Payload Module)
450
400
Temperature (K)
350
0 incidence
5 deg
10 deg
15 deg
20 deg
25 deg
30 deg
35 deg
300
250
200
150
4.80E-01
5.80E-01
6.80E-01
7.80E-01
Distance from Sun (AU)
8.80E-01
9.80E-01
Spacecraft Component Thermal
Management
Notes: By using thermodynamics the amount of heat needed to be
dissipated from the component taking into account its heat generation,
shape, size, etcetera. If the component is found to be within its operating
range, the analysis is done, if not a new thermal control must be added or
changed.
93
94
Thermal Analysis of Antenna
95
Antennae Operating Temp (-373 to 373K) vs
Distance With White Paint Reflector
390
Temperature (K)
370
350
330
310
290
270
250
4.80E-01
5.80E-01
6.80E-01
7.80E-01
Distance From Sun (AU)
8.80E-01
9.80E-01
96
Star Tracker Thermal Analysis
Using the heat generated (10W), and using common coating
material ( ); the required to maintain the star tracker’s temperature
to 30 K can be found by.
Qdiss Qtot T Atotal
4
s
Knowing the heat needed to dissipate, a radiator size can
be calculated, or other thermal control methods (MLI) can
be used to maintain temperature.
Arad
Qsun Qgenerated
T
4
s
Atotal
97
Heat Needed to Radiate Away From Star Tracker to Keep Temp
303K
1.60E+03
1.40E+03
1.20E+03
Heat (W)
1.00E+03
8.00E+02
6.00E+02
4.00E+02
2.00E+02
0.00E+00
4.80E-01
-2.00E+02
5.80E-01
6.80E-01
7.80E-01
Distance (AU)
8.80E-01
9.80E-01
98
Using the amount of heat needed to be radiated from star tracker, the
additional area required to dissipate heat can be calculated and
chosen.
Area of Radiator Needed to Keep Star Tracker Surface Temp at
303K
Area of Radiator (m^2)
2.50E+00
2.00E+00
1.50E+00
1.00E+00
5.00E-01
0.00E+00
4.50E-01
5.00E-01
5.50E-01
6.00E-01
Distance (AU)
6.50E-01
7.00E-01
99
Thermal Analysis of Microthruster
Notes: Since Microthrusters need to be within
247 to 333 K, will have to add MLI to stay
within thermal constraints.
Analysis of Multilayer insulation…
100
Microthruster and Sun Senser
Temperature vs Distance
Temperature (K)
700
650
600
550
500
Microthruster Side
Microthruster Top
Sun Sensor
450
400
350
300
250
200
4.80E01
5.80E01
6.80E01
7.80E01
8.80E01
Distance (AU)
9.80E01
101
Thermal Analysis of Solar Panels
Need to radiate heat away from solar sail, any
ideas, stephanie, group?
102
Tempurature (K)
Solar Panel Temp (Operating temp 123
to 400K) vs Distance from Sun
580
560
540
520
500
480
460
440
420
400
380
360
340
320
300
4.80E-01
5.80E-01
6.80E-01
7.80E-01
8.80E-01
Distance from sun (AU)
9.80E-01
103
Casey Shockman
• Communications
104
Major Tasks
• Trade Studies
– Frequency
– Antenna types
– Power
– Data transfer rates
• Sizing the Antennas
• Determine placement of antennas
105
Antenna Selection and Sizing
• Initial Conditions
– Payload stores data at a rate of 15.6 kbps.
– Need to transmit data 1 or 2 times per week.
• 1 week of storage is equal to around 9,500,000 kb.
• We choose two 12,000,000 kb hard drives to store
information. One hard drive will be used as backup.
– Satellite needs to transmit data anywhere from .5 to
1.5 AU
– All aspects of the DSN (size, SNR, noise temp.etc.)
106
Frequency
• S-Band: 2 GHz
– Used primarily for short distance.
• X-Band: 8.4-8.5 GHz
– This is the typical frequency used, so DSN is
becoming overloaded at this frequency.
• Ka-Band: 31.8-32.3 GHz
– Due to overloaded X-Band frequency, the DSN is
migrating to Ka-Band frequency.
– Can transfer data much more quickly than X-Band.
Solar Sail will use Ka-Band transmit with X-Band
receive/transmit capabilities.
107
Process
• This equation was then used with the
following BER vs. SNR to solve for
variables.
108
Bit Error Rate vs SNR
109
Process
• A SNR is chosen to correspond to a BER of 10-6.
• T is noise temperature which is based on the
angle with the sun and earth, elevation angle of
the earth antenna, weather conditions, distance
between satellites.
• From this, the gain and power transmitted was
optimized for each frequency, antenna, distance
and data transfer rate
• The following chart was created for each
antenna, frequency, and distance from the sun.
Variables included power, noise temperature,
and antenna size.
110
111
Antenna Types
• Directional
–
–
–
–
Parabolic Reflector
Horn
Array
Helix
• Omni-directional
– Dipole
– Conical
112
High Gain Directional Antennas
113
Directional Antennas
• Parabolic Reflector
– High data transfer rate with low power required.
– Works with either X-Band receive/transit or KaBand receive/transit, not both.
– Conventionally heavier than horn, but recent
unused membrane dish antennas may be lighter
in the future.
– Can achieve high gain and a range of
beamwidths.
114
Directional Antennas
• Arrays
– Gain is low for small areas.
– Heavier than horn or parabolic reflector due to
the large area needed to achieve desired level of
gain.
– Can attain any beamwidth.
115
Directional Antennas
• Helix
– Can attain any beamwidth necessary.
– Antenna will have a low diameter but needs to
be long to achieve high gain.
– Length of antenna makes pointing and storage
very difficult.
– Length of antenna also adds resistance, so
efficiency drops with length.
116
Directional Antennas
• Horn
– High data transfer rate with low power required.
– Works directly with recently developed Small Deep Space
Transponder.
– New design works with X-Band and Ka-Band transmit as
well as X-Band receive.
– Smaller than conventional parabolic reflector and array.
– High gain.
– Ability to track using Delta Differenced One-Way Range
(DDOR) because two tones can be sent at once (DSN
stats.pdf 9).
– Small beamwidth, suitable for long-range
communications.
– The Solar Sail will have two horn antennas.
117
118
119
Conclusions
• The horn antenna was chosen because of its
small size compared to the other choices.
• The antenna cannot transmit at a Sun-EarthProbe angle smaller than .3 degrees or on a
very stormy day at the ground station.
• Different antennas would be used on the sun
side and shade side of the antenna.
• The sun side antenna would be .2 meters in
diameter. The shade side antenna would be
.075 meters.
120
More conclusions
• The minimum transfer time for this setup is 1
hour using Ka-band transmission.
• If the required signal to noise ratio is not met
due to SEP angle or weather on earth, the
transfer rate can be slowed to allow for more
accurate data.
• Power used for transfer is 30 watts.
121
Directivity
• Horn directivity is estimated by the following
equation:
225
HPBW
*d
122
Beamwidths
• Using this equation:
– Sun-side antenna
• X-Band HPBW=13.42
• Ka-Band HPBW=3.35.
– Shade side antenna
• X-Band HPBW=35.79
• Ka-Band HPBW=8.95
• These beamwidths are all much larger
than the pointing accuracy so there
will be very little pointing error.
123
Low Gain Omni-Directional Antennas
124
Low-Gain Antenna Selection
• Omni-Directional Antenna
– The goal is have a low data rate
communications when not pointing at earth
– There are many choices for low gain
antennas. The solar sail will have two conical
equiangular spiral antennas.
– These two antenna will ensure the satellite
will always be within contact with the DSN.
Omni-directional Transfer
Dsn stats 5
125
126
2-Arm Conical Equiangular Spiral Antenna
Gain will be 0 dBi (isotropic)
from -70 to +70 degrees.
Gain will be -25 dBi from -90 to
-70 and 70 to 90 degrees for
each antenna.
Using this configuration, at the
worst case scenario, the low
gain antenna can transmit 1
bps with an accuracy of 10-3.
127
Costs
128
DSN Cost
Dsnstats.pdf
This gives a cost of about $1100 per hour of
transmission within the DSN network.
129
Antenna Costs
• .2 m diameter horn antenna:
• .075 m diameter antenna:
• conical equiangular antenna:
• hard drive:
• Total cost:
130
Masses
• .2 m diameter horn antenna:
– 2.75 kg
• .075 m diameter antenna:
– .40 kg
• conical equiangular antenna:
– 2 x .25 kg
• hard drive:
– 2 x .79 kg
• Miscellaneous
– 1 kg
• Total mass = 6.23 kg
Michael Hiti
Power
132
Objectives
• Determine the amount of power required to support the
payload instruments, and all other components of the
spacecraft
• Perform a trade study to determine whether to use a
normal-pointing or conformal solar array
• Determine appropriate solar array materials
• Determine appropriate solar array size
133
Objectives (continued)
• Determine appropriate battery type to be used in mission
• Determine appropriate battery size
134
Power Requirements
Peak Power (W)
Remote Sensing Instruments
Coronograph
4
All Sky Camera
3
EUV Imager
5
Magnetograph - Helioseismograph
5
Magnetometer
2
IN-SITU Instrument Package
Solar Wind Ion Composition and
Electron Spectrometer
Energetic Particle (20keV - 2MeV)
3.5
2
Attitude Control
Small Reaction Wheels
70
Large Reaction Wheel
70
Sliding Mass
40
Structure
Heat Curing Elements
335
Communications
Antenna Gimbal
8
Antenna
36
Thermal Management
50
Misc/Thermal
TOTAL
633.5
• All power
requirements for
solar sail
135
Power Requirements (continued)
Peak Power
(W)
Structure
Heat Curing Elements
335
Communications
Antenna
36
Large Reaction Wheel
70
Thermal Management
50
TOTAL
491
Attitude Control
Misc/Thermal
• Anticipated beginningof-life (BOL) power
load
136
Power Requirements (continued)
Remote Sensing Instruments
Coronograph
4
All Sky Camera
3
EUV Imager
5
Magnetograph - Helioseismograph
5
Magnetometer
2
IN-SITU Instrument Package
Solar Wind Ion Composition and
Electron Spectrometer
Energetic Particle (20keV - 2MeV)
3.5
2
Attitude Control
Small Reaction Wheels
70
Communications
Antenna Gimbal
8
Antenna
36
Thermal Management
50
Misc/Thermal
TOTAL
188.5
• Anticipated endof-life (EOL)
power load
137
Array Sizing
• Key Equations
Vchg = (1.2) * Vbus= 34.2 V
Cchg = (PL* td ) / (Vbus* DOD) = 52.9 Ah
Pchg = (Vchg* Cchg)/15h = 120.6 W
PEOL = (PL + Pchg) = 310 W
•
•
•
•
•
•
Vchg is the array voltage
Cchg is the total charge capacity of the battery
PL is the required power load at EOL
td is the anticipated max load duration (2h)
Pchg is the power required to charge the batteries
DOD is the depth of discharge (0.25)
138
Array Sizing (continued)
• The BOL power requirement is found by assessing the
various efficiency factors that lead to the conditions at EOL
Temperature efficiency = ηtemp = 1 - (0.005/K)*(Tmax – Tnom)
Radiation efficiency = ηrad = 1- R
Cosine loss = ηangle = cos(α)
PEOL = ηtemp * ηrad * ηangle * PBOL
•
•
•
•
Tmax is the maximum solar cell operating temperature
Tnom is the nominal solar cell operating temperature
R is the percent loss due to radiaiation damage
α is the maximum angle off-normal to the sun
139
Array Sizing (continued)
• Using a conformal solar array
Assuming:
ηtemp ≈ 0.51
ηrad ≈ 0.3
ηangle ≈ 0.81
PBOL = 1395 W
140
Array Sizing (continued)
• Array area equations
Acell = PBOL / ( ηGaAr* Is )
Aarray = Acell / ηpack
•
•
•
•
•
Acell is the area of the solar cells
Aarray is the area of the array
ηGaAr is the efficiancy of the solar cells
Ηpack is the packing efficiency
Is is the solar intensity
141
Array Sizing (continued)
Acell = 0.8718 m^2
With a packing efficiency of 90%
Aarray = 0.969 m^2
• These values reflect the sizes required to meet EOL power requirements
at 0.48AU
• We must check to make sure this array area will generate enough power
to support the BOL requirements at 1AU
142
Array Sizing (continued)
• Assuming that there is no radiation and cosine loss
• Assuming a ηtemp ≈ 0.90
• Is = 1355W/m^2 at 1AUl
The BOL load ≈ 546W
This would require an Acell ≈ 1.413 m^2 and an Aarray ≈ 1.57 m^2
This means that the array sizing based on the EOL requirements will not
support the BOL load requirments.
• The BOL load requirements are the driving force behind the array
sizing
143
Array Mass
• Gallium Arsenide cells weigh 84mg/cm
• Solar panels and coverslides weigh 2.06 kg/m^2
• Aluminum honeycomb panel backing weighs 0.9 kg/m^2
The total mass of a conformal array will be 5.963 kg
144
Solar Array
• Solar cells and panels
made by Spectrolab
– Ultra Triple Junction GaAs
cells
– 28.5% efficiency
– 84 mg/cm^2 (cells)
– 2.06 kg/m^2 (panel)
145
Trade Study
• Advantages to using of a normal-point solar array
– Able to collect maximum possible solar energy
– Requires smaller solar array
– Array could be positioned to minimize thermal and radiation damage
• Disadvantages to using of a normal-point solar array
– Added mass of gimbal used for positional array
– Added complexity to design
– Creates problems regarding stowage in capsule
146
Trade Study (continued)
• The BOL power requirements have caused our solar array to be nearly
twice area required to meet the EOL power requirements
• The reduction of mass is our highest priority
• The smallest gimbal used for array positioning alone weighs
approximately 5kg
– This is nearly equal to the entire mass of our array
• Since our array is already oversized for EOL requirements, an array
with normal pointing capabilities will not be beneficial
147
Battery Sizing
• Key Equations
Cchg = (PL* td ) / (Vbus* DOD) = 52.9 Ah
Ebat = (Vbus* Cchg) = 1508 W h
mbat = Ebat / ebat
• Ebat is the battery energy capacity
• ebat is the energy density of the battery
• mbat is the mass of the battery
mbat = 8.6 kg
148
Battery
• Batteries made by BST
Systems
– Silver-Zinc Battery
– 1.5 V/cell
– 175(W h) / kg
149
Demonstration of Success
150
Failure Modes and Effects Analysis
•
Boom fails to fully inflate due to problem with tank, heater, etc.
–
–
Sail may still function, would apply different torques, difficult to control
One or more of the booms could fail to extend fully. i.e. the heaters don't
work, or the inflation gas tank ruptures or it gets caught on something.
If that were to happen, it might be possible to run up the sail part way,
although there would be a lot of slack in it, and therefore a loss of
propulsion efficiency. And the attitude control system might not be able to
compensate for the asymmetric torque...assuming the sliding mass on the
malfunctioning boom worked at all...I mean, um...yeah, it'll work
perfectly...
•
•
Failure of navigation system... sail fails to know it's location and can no longer implement control laws; will not reach desired orbit.
Failure Modes and Efffects:
1. Module structure fails at 7.5 g's and breaks it shit off on exit.
Effect: It will spread debris throughout LEO. Something like
the Chinese did about 9 months ago. Oops. My Bad.
2. The Sail gets kinked inside the Bus module and is unable to deploy
or rips on deployment.
Effect: Huge embarrassing failure for the UofM design team.
3. The solar array is not able to pivot downward from its
storage/capsule setup to its working format.
Effect: Same as #2.
•
FMEA
Thermal can screw everything up. I don’t think I can narrow it down to one thing. If I have to I guess I will. Anyways, heres my FDR slides thus far,
not done yet, but pretty much done calculating stuff. Now I have to explain things, add equations and graphics and explain what I would do if I had
more time. I think stephanie will have plenty to say about what I have already. Thanks
151
Future Work
152
Acknowledgements
•
•
•
•
•
•
Stephanie Thomas
Professor Joseph Mueller
Professor Jeff Hammer
Dr. Williams Garrard
Kit Ru….
?? Who else??