Gross Domestic Product Increasing
Population growth increasing
Annual VMT increasing
Construction Cost increasing
The cost of right of way increasing
Funding constraints increasing
Need to continue the economic viability of the
corridor increasing
How is Big Data
Changing the
thought Pattern?
PROBE DATA PROVIDED BY UNIVERSITY OF MARYLAND
CHARTS CREATED BY SCDOT
Other Interstate Routes
• Not enough funding to build out of congestion
• Development impacts limits capacity improvements
• Economic development not following the 20 year
design life of projects
• Some Capital improvements providing only 2-5 years of
relief
• Silver bullet solutions are becoming challenging
• Best hope of maintaining a status quo on congestion
• Travel Demand Management and Modal Options are
going to become the new normal with higher
expectations
• Data is available to support and direct investment on a
system wide level (Corridors, Access Management etc.)
• Partnerships and stakeholder buy-in becoming
essential
CORRIDOR MANAGEMENT PLANS
TDM STRATEGIES
 Existing programs & case studies
 TDM modeling to determine impacts
Data Collection
&
Field Reviews
&
Existing
Conditions
Analysis
MODAL STRATEGIES
 Transit enhancement evaluations
 Freight strategies
TRAFFIC OPERATIONS STRATEGIES
 Safety reviews
 VISSIM modeling
CAPACITY IMPROVEMENT STRATEGIES
 VISSIM modeling
Recommended
Improvement
&
Strategies
•
•
•
•
•
•
•
•
•
Partnership
Develop a sense of ownership through collaboration
30 to 40 year plan
Financially unconstrained plan
Staged strategies which should build on each other
Micro simulation on strategies identified as a recommendation
Draft IMR or IJRS should be possible from the evaluations
Benefit Cost Analysis and Consideration of life cycle cost
Public hearings and information meeting
• Environmental Considerations
• For all Projects recommended identify :
o
o
o
o
o
o
o
o
o
o
Purpose and Need
Justification for Logical Termini
Independent Utility
Cultural review
Noise review
Relocations
Community impacts
Environmental justice
Wetlands mitigation and other water of US impacts
Hazardous materials review
PROJECT
RANK COUNTY
Interstate Upgrade
I-85
IU-05
(US 25 to SC 129)
Public Outreach/Ed, Freight Plan, Transit Oriented
Development, Integrated Corridor Management
Group, Ride Share Program
Park & Ride Lot Purchase & Construction
Truck Parking Areas
Mainline and Crossing Route Sign Improvements
US 29 and SC 146/296 Signal Impr & Cameras
ITS Variable Message Signs (5 Locations)
ITS - Traffic Cam, SHEP & Active Traffic
Management Center
Relocate SHEP HQ to Brockman-McClimon
Construct Off-Site Crash Investigation Area
Increase SC 101 Accel Lanes - Striping
SC 290 I/C Improvements (Diverging Diamond
Interchange, 2-Lane Exits)
US 29 and SC 129 NB exit ramp and
SB accel lane
Widen NB/SB from Pelham to SC 14/
Aviation Blvd and SC 14 I/C - CD Accel/Decel
Improvements
Convert Laurens Road I/C to Parclo A
Widen NB from CD entrance to Laurens Road Exit
Widening SB from Woodruff Rd to CD Exit Ramp
COG /
MPO
Greenville GPATS
Spartanburg SPATS
Funding
Source
FY 2014
Planned
FY 2015
Planned
FY 2016
Planned
FY 2017
Planned
FY 2018
Planned
FY 2019
Planned
Interstate
STIP
COST
(2014-2019)
REMAINING
COST
(2020+)
$152,530
70 PL
250 P
200 P
200 P
250 P
1,000 PC
75 P
1,000 P
200 PC
30 PC
1,000 P
4,400 C
1,200 C
2,100 C
3,000 C
675 C
4,000 C
1,000 R
400 P
6,000 C
6,000 C
4,200 C
3,300 P
500 R
38,200 C
2,000 P
500 R
22,000 C
4,000 P
3,500 C
39,280 C
($2.72M identified in FY 2015 for Salters Road Bridge)
Widening SB from CD Exit to White Horse Road
Widen NB/SB from SC 14 to SC 101
2,000 P
19,000
70,700
PROJECT
RANK COUNTY
Interstate Upgrade
I-526
IU-06,08 Berkeley
(SC 7 to US 17)
Charleston
Carpool/Rideshare/Vanpool Program
Telecommuting/Compressed WW/Flex/Stag Time
Education,Promotion,Marketing
US 17 Access Management Plan
Improve I/C Signage fr Rivers Ave to US 17 S
ITS Improvements - Additional Cameras (5)
Off-site Crash Investigation Areas
Bike/Walk Improvements
Improve Signal Timing @ 6 Interchanges
Improve Decel Lanes at Paul Cantrell Blvd
Improve Leeds Ave and Paramount Dr I/C's
Interchange Improvements/Mainline Widening - PE
I-26/I-526 Interchange Improvements
Widen from International to Paul Cantrell &
Paul Cantrell Interchange Improvements (DB)
International Blvd Improvements - Diverging
Diamond Interchange
COG /
MPO
CHATS
Funding
Source
FY 2014
Planned
FY 2015
Planned
FY 2016
Planned
FY 2017
Planned
FY 2018
Planned
FY 2019
Planned
Interstate
STIP
COST
(2014-2019)
REMAINING
COST
(2020+)
$81,119
150 PL
150 PL
75 PL
700 P
225 P
325 PC
45 PL
45 PL
45 PL
45 PL
840
2,900 C
150 P
1,500 C
150 PC
700 P
100 P
5,339 P
5,339 P
1,000 C
175 P
5,339 P
2,250 C
1,000 C
5,339 P
Interstate
AC
AC
Conversion
Interstate
Interstate
AC
AC
Conversion
10,000 C
169,799 C
169,799
159,426
10,000 C
84,100 C
28,033 C
56,067
Project Overview
February 2016
Jenny Humphreys, AICP
February 24, 2016
Scope of Work
Travel
Demand
Management
Traffic
Operations/
ITS
Modal
Options
Capacity
Improvements
Public Engagement
• Three tiered approach to public engagement
• Alignment with on-going studies and projects
in study area
• Goals
– Alignment in data collection, technical analysis
– Alignment in messaging
– Alignment in regional goals and performance
measures
• In-Person meetings with all three tiers (OnGoing)
• Project Workshop (Spring 2016)
• Data collection (On-Going)
– On-line surveys
– Web based project information
– Data sharing across projects and agencies
– Interviews with steering committee, stakeholders
Traffic Forecasting and Analysis
• SCDOT Statewide Travel Demand Model
(TransCAD)
• Simulation Model under development
(TransModeler)
• Base Year of 2015
– Weekday A.M. and P.M. peak hour periods
– Model was developed using traffic data collected
in 2015
• Forecast Year of 2040
Performance measures will be developed to
compare alternatives in all four buckets
• Regional Performance
– Model will be used to test future scenarios
– Mode shift and travel demand strategies will be
evaluated system wide
– Model will be used to evaluate freight movements
and obtain truck performance measures
• Corridor and Interchange Level Performance
– Reduction in travel demand evaluated for operations
– Mainline and Interchange design modifications
• Travel Demand and Simulations Models
• Technical Memoranda
• Existing Conditions Report (Spring 2016)
• Travel Demand Management Strategies (Winter
2016)
• Modal Strategies (Winter 2016)
• Operational Strategies (Winter 2016)
• Capacity Improvement Strategies (Summer 2017)
• Final Report (Summer-Fall 2017)
• Public Participation Summary
• Environmental Screening
• Financial Planning
TDM Strategies
Underway
48
Study Scope Developed in coordination with:
• Greenville-Pickens Area Transportation Study (GPATS)
• Spartanburg Area Transportation Study (SPATS)
• Scope to include:
o Project Management Plan
o Identify Priority Transit Service
o Develop a technical memo with service area map with associated
data and identify location priority regional transit corridors
• Deliverables:
 Stakeholder outreach and coordination
 An overview map
 Evaluation matrix
 Identify feasible and practical stop and service pattern
locations by corridor
 Show potential access of proposed transit services and
proposed station locations
 Aerials of preferred park and ride lot locations
 Cash flow analysis
 Final Report