DBIA MID-ATLANTIC MEETING
October 16, 2015
Shailendra Patel, PE, DBIA
Director, Alternate Project Delivery Office
Zion Crossroads Interchange Improvements
Corman Construction Co./Parsons Transportation
2
VDOT DESIGN-BUILD PROGRAM
Status as of October 1, 2015
Number of
Contracts
Total Value in
Millions
Completed Contracts
34
$570.1
Active Contracts
37
$1247.3
Active Proposals
5
$350.8
Candidate Projects
3
$211.0
3
Rte 277/244 Interchange
Shirley Contracting / Dewberry
4
Summary of D-B Contracts Advertised
$700,000,000
70
*
60
$500,000,000
50
$400,000,000
40
$300,000,000
30
$200,000,000
20
$100,000,000
10
$0
0
2004
2005
2006
2007
2008
2009
2010
Year
Total DB Estimated Value
* I-564 Intermodal Connector advertised by EFLHD
5
2011
2012
# of DB Contracts Advertised
2013
2014
2015
No. of Contracts Advertised
Total Estimated Contract Value
$600,000,000
Rte 60 Bridge Replacement in the Town of Clifton Forge
Orders Construction/Clark-Nexsen
6
DB vs. DBB Contracts Advertised
$2,000,000,000
$1,800,000,000
Total Estimated Contract Value
$1,600,000,000
$1,400,000,000
$1,200,000,000
$1,000,000,000
$800,000,000
$600,000,000
$400,000,000
$200,000,000
$0
2004
2005
2006
2007
2008
Total DBB Estimated Value
7
2009
2010
Year
2011
Total DB Estimated Value
2012
2013
2014
2015
Route 460 Connector (Phase I)
Bizzack Construction/AMT / ENTRAN / Janssen & Spaans
8
RECENT INITIATIVES
Use of incentives
Use of options for additional work
Responsible Charge Engineer for complex DB
projects
Use of ATCs
9
I-581 & Elm Avenue Interchange
American Infrastructure/RDA
10
DESIGN-BUILD LESSONS LEARNED
Environmental
Wetland Delineation
Threaten & Endangered Spices – Long-Eared Bats
HAZMAT studies – Phase I & II
Survey – Type of survey and accuracy
SUE Survey – Level B designation for all underground utilities
Geotechnical Data Report – appropriate investigation of ground water
elevation to determine feasibility of preliminary type and location of
storm water facilities
Utilities – Advance communication with the Owners, expecting owner
to provide prior rights determination, and advance relocations
where appropriate
Right-of-Way – Advance acquisitions for total takes where appropriate
11
DESIGN-BUILD CONCERNS
Design submittal quality
Post-award interpretation of standards and specifications
Construction quality
DBB mindset
Partnering
12
DESIGN-BUILD PROJECTS - ADVERTISED CY 2015
Three (3) DB projects Advertised Valued at - $236M
I – 64 Peninsula Widening (Segment II) - $185M
GRTC Pulse: Bus Rapid Transit (BRT) - $38M
I-81 over Rte. 808 (Halls Bottom Rd) and Sinking
Creek - $13M
13
DESIGN-BUILD PROJECTS TO BE ADVERTISED
Three (3) DB projects to be Advertised Valued at $211M
Route 630 (Courthouse Road) and Interstate 95
Interchange Reconstruction - Fredericksburg District,
UPC 13558 (RFQ release late 2015) - $102.5M
Route 606 Bridge Replacement over I-95 with 606
Improvements - Fredericksburg District, UPC 105463
and 100829 (RFQ Release Late 2015) - $23.5M
Route 220 Corridor Safety Improvements, Salem District UPCs 105543 and 105544 (RFQ release Summer 2016) $85M
14
POTENTIAL DESIGN-BUILD PROJECTS*
I-64 Peninsula Widening Segment III, Hampton
Roads District, UPC 106689
Bridge Replacement: I-81 over Reed Creek and Rte.
697 (Formato Lane), Bristol District, UPC 104936
Bridge Replacement: I-81 over Rte. 686 (Mulberry
Lane), Bristol District, UPC 107117
I-64 Widening from I-295 to Exit 205, Richmond
District, UPC 107458
*It is anticipated that the projects listed above will be advertised using the Design-Build project
delivery method. The list is subject to change.