Transcript datasheet

Novel load forecasting technique for three timehorizons in electric power system
Swasti R. Khuntia
Challenge the future
1
Thesis Factsheet
• Title of thesis: Novel load forecasting technique for three
time-horizons in electric power system
• Name of student: Swasti R. Khuntia
• Start Date / End Date: 10/04/2014 – 09/04/2018 (Expected)
• Departments involved: Electrical Sustainable Energy (formal)
and Applied Probability (informal)
• Supervisor(s): Dr. –Ing. Jose L. Rueda
• Promotor(s): Prof. Mart A. M. M. van der Meijden
• Companies and funding agencies involved: EU FP7 Project
comprising of 20 partners (8 industries and 12 universities)
• Associated Project Title: GARPUR (Generally Accepted
Reliability Principle with Uncertainty modelling and through
probabilistic Risk assessment) [www.garpur-project.eu]
Challenge the future
2
Thesis content
• Motivation
• European power system reliability management surviving on ‘N1’ criterion
• Time to upgrade the reliability criterion
• Demand-side uncertainty
• Intermittent energy sources
• Part of the project involved, it aims at socio-economic benefits
• Research question
• “Designing, developing, assessing, and evaluating new reliability
criteria”
• My contribution: Load forecast model for three time-horizons
using novel data mining technique
Challenge the future
3
Thesis content
• Leader: T5.2 and T6.2
• Contributor:
• T2.3, T2.4
• T4.2, T4.3
• T5.1, T5.3, T5.4
• T6.3, T6.4
• T7.2, T7.3
• T9.1
Challenge the future
4
Thesis challenge
•
•
•
•
Difficulty in modeling for three time-horizons
Data uncertainty
Upgrading the existing reliability criterion
Driving factor: Project implementation in pan-European level
in next decade
Challenge the future
5
Methodology
• Literature study on “Understanding the three time-horizons”
in electrical transmission system
• Literature study on “Asset management in electrical
transmission system”
• Literature study on “Existing methodology used in
participating TSOs” [continuing]
• Power flow study on Bayesian Network
• One of the most efficient probabilistic graphical models to represent
uncertainty and inferences thereof
• Nothing much done in load forecast area for three time-horizons
• Trying to assess the usability and planning to design a “hybrid” model
Challenge the future
6
Project Plan
Literature
Test-case study
WP5, 6
Implementation/Validation
Writing Thesis
04/2014
2015
2016
2017
04/2018
Challenge the future
7
Challenge the future
8