Registration Market Call

Download Report

Transcript Registration Market Call

Registration
Market Call
Apr 24, 2009
http://nodal.ercot.com
1
Lead from
the front
Texas Nodal
Antitrust Admonition
ANTITRUST ADMONITION
ERCOT strictly prohibits Market Participants and their employees who are
participating in ERCOT activities from using their participation in ERCOT activities
as a forum for engaging in practices or communications that violate the antitrust
laws. The ERCOT Board has approved guidelines for members of ERCOT
Committees, Subcommittees and Working Groups to be reviewed and followed by
each Market Participant attending ERCOT meetings. If you have not received a
copy of these Guidelines, copies are available at the Client Relations desk. Please
remember your ongoing obligation to comply with all applicable laws, including the
antitrust laws.
DISCLAIMER
All presentations and materials submitted by Market Participants or any other Entity
to ERCOT staff for this meeting are received and posted with the acknowledgement
that the information will be considered public in accordance with the ERCOT
Websites Content Management Operating Procedure.
http://nodal.ercot.com
2
Lead from
the front
Texas Nodal
Agenda
•
Antitrust Admonition
•
Updates and Progress
•
Special Topics
•
Reminders
•
Q&A / Open Forum
ERCOT asks that you log into the WebEx using your company name then
your name. This will allow us to take roll call offline. If you have not
logged in with your company name, please use the WebEx chat to tell the
host your company is represented
http://nodal.ercot.com
3
Lead from
the front
Texas Nodal
Updates and Progress
• Status for the past week:
– Continued to work with several RE’s via conference calls
– Iteration 2 Completes Monday 4/27/09
• Most RARF’s not accepted have very minor issues
• Exceptions are sites that are undergoing major modeling changes
– Current PUN Transmission Production Quality Metric is at ~90%
•
•
•
•
Up from 89% last week
4 RARFs Accepted for Transmission Data
8 PUNs are actively working with ERCOT on modifications / corrections
12 remaining PUN’s are working on corrections
– 4 have not submitted revisions for iteration 2
– 2 of these PUN’s are currently RED and have not submitted any updates
http://nodal.ercot.com
4
Lead from
the front
Texas Nodal
Updates and Progress
•
Where are we at?
ITERATION 1
3/5/2009
4/2/2009
ITERATION 2
4/6/2009
4/27/2009
ITERATION
3
4/29/2009
•
•
•
•
5/14/2009
Iteration 3 begins on 4/29
Iteration 3 is the last window prior to locking in the initial nodal model on
6/1
Iteration 2 RARF’s are due no later than EOB 4/27/09
Continue to use [email protected] for questions or to
request a conference call to review your audit report
http://nodal.ercot.com
5
Lead from
the front
Texas Nodal
Special Topics:
Review of Overall Registration Data Project Schedule
2009
MAR
Private Use Network Transmission Data
Collection
- Iteration 1
- Iteration 2
- Iteration 3
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
85% Prod Quality
95% Prod Quality
98% Prod Quality
Private Use Network Planning and
Protection Data Collection
-
Window 1 Non-Wind* RE’s Transmission /
Planning / Protection Data Collection
- Iteration 1
- Iteration 2
- Iteration 3
Kick Off Market Call
85% Prod Quality
95% Prod Quality
98% Prod Quality
-
Window 2 Wind RE’s Transmission and
Planning / Protection Data Collection
- Iteration 1
- Iteration 2
- Iteration 3
Kick Off Market Call
85% Prod Quality
95% Prod Quality
98% Prod Quality
SEM
GO-LIVE 8/31
MP-10 Phase 2 Final Validation
EIS 1.19
to EDS 8/10
•
•
•
•
•
•
Each window will be broken into 3 iterations with heightening levels of data quality goals
All non-PUN RE’s will submit during 1 of 2 windows (except Wind)
Each non-PUN RE will request one of the two windows between 5/22/09 and 6/5/09 via email to [email protected]
Some RE’s may be moved to a different window based on volume
Planning and Protection data will be rolled in for the remaining windows (see next slide)
All Wind resources will submit during the second window
http://nodal.ercot.com
6
Lead from
the front
Texas Nodal
Special Topics – FAQ
• Issue with Load Tap Step positions
– ERCOT systems expect Load Tap Positions and the related
Voltage to both either rise or fall together
– Some tap changer positions increment voltage by changing to a
lower tap position integer
– Work around: In these cases, the Resource Entity should place a
negative sign in front of the tap position
– For example:
If your tap positions / voltages are:
Lowest Tap Position / Voltage
5 / 135kV
High Tap Position / Voltage
1 / 147kV
Register the following on the RARF:
Lowest Tap Position / Voltage
-5 / 135kV
High Tap Position / Voltage
-1 / 147kV
http://nodal.ercot.com
7
Lead from
the front
Texas Nodal
Special Topics – Block Load Transfer Registration
• ERCOT will be assessing in coordination with TSP’s what Block
Load Transfers need to be registered / modeled prior to go live
• Once assessment is complete, ERCOT will be engaging the TSP’s
to register identified current / future Block Load Transfers
• There will be no change to the registration form currently in place
for zonal.
http://nodal.ercot.com
8
Lead from
the front
Texas Nodal
Q&A
Q&A / Open Forum
http://nodal.ercot.com
9
Lead from
the front
Texas Nodal
Appendix
http://nodal.ercot.com
10
Lead from
the front
Texas Nodal
Appendix Item:
Engaging Remaining Resource
Entities Originally Presented on
4/10/09
http://nodal.ercot.com
11
Lead from
the front
Texas Nodal
Special Topics – Engaging Remaining Resource Entities
Originally Presented on 4/10
• ERCOT Will be Dividing the Remaining Resource Entities into 2
Submission Windows
– Dividing into two windows allows ERCOT to spend more time
assisting with MP registration issues
– There is no change to the final RARF data collection end date
(12/31/09)
– These windows will include Planning, Protection and SubSync data
• Previously this was out of scope for the transmission data collection phase
• Completing this now will reduce the risk of completing at the end of the year as
a separate process
– ERCOT will ask RE’s to request inclusion into Window 1 or Window
2 at the next Friday Update Call.
– As slots fill, ERCOT will make every effort to honor requests, but
may have to change it based on capacity
http://nodal.ercot.com
12
Lead from
the front
Texas Nodal
Special Topics – Engaging Remaining Resource Entities
Originally Presented on 4/10
•
Window 1
– Begins June 1 ending on Sept. 1
– This will be available to all technologies except Wind
– Wind resources will be addressed during Window 2
•
•
WOTF are reviewing potential changes to wind registration data
ERCOT will address Wind Resources once these changes have been solidified
•
Window 2
– Begins Sept 1 ending on Nov. 1
– All Wind Resources will be in this iteration
– There will be capacity for other resource types, but more limited than
Window 1
•
ERCOT will host a market kick off meeting for both windows
– Window 1 kick off meeting is currently targeted for the 5/22/09
– Kick off will take the place of that week’s market call
•
Market calls will continue to be hosted by ERCOT on a bi-weekly basis
through the end of Window 2
http://nodal.ercot.com
13
Lead from
the front
Texas Nodal
Special Topics – Planning, Protection and SubSync Data Collection
Originally Presented on 4/10
•
Planning, Protection and SubSync Data is the last of the RARF data
collection categories
•
Originally schedule for late 2009, it will be rolled into the transmission
data collection process
– For Private Use Networks that have already completed the transmission
data collection, they will have the option of providing the planning,
protection and subsync data in either Window 1 or Window 2
•
ERCOT is reviewing the supporting tabs in the RARF and ensuring all
data requested aligns with base system requirements
– RE’s should contact [email protected] prior to starting
these to ensure they are working off of the most recent version of these
forms
•
Business rules will be completed for these tabs by mid-may and tested
through the remainder of the month
•
These will then align with the previously mentioned Windows for
transmission data collection
http://nodal.ercot.com
14
Lead from
the front
Texas Nodal
Appendix Item:
Reminders from Transmission Data
Collection Kick-Off with Private Use
Networks Originally Presented on
3/13/09
http://nodal.ercot.com
15
Lead from
the front
Texas Nodal
Reminders
Originally Presented on 3/13/09
•
ERCOT has published a revised RARF guide
– The revised RARF guide contains all the business rules for transmission assets
– The URL where this can be located is:
http://nodal.ercot.com/readiness/rq/documents/index.html
– Document title: EDS - Resource Registration Guide v4.2
•
Scope of Transmission Data Assets (high level lists)
– Lines
– Breakers and Switches
– Capacitors and Reactors
– Transformers
– Static Var Compensators
– Series Devices
– Loads
– * PUN Load 168 hr Profiles
*note that accepted PUN Load 168 hr Profiles will be added to the RARF upon re-submittal
Those that still have issues with the PUN 168 profile form, ERCOT will work with you to correct
on the conference with your account manager
•
Out of Scope for this phase
– Protection
– SubSync
– Planning
http://nodal.ercot.com
16
Lead from
the front
Texas Nodal
Reminders
Originally Presented on 3/13/09
•
Clarifying statements on which assets need to be registered / modeled
Note: This is specific to PUN’s. Specifics on other resource entities will be addressed on a later call
– All assets which are between a generator and the point of interconnect to
ERCOT
– All Load
• Loads which are connected on a Bus greater than or equal to 60kV need to be modeled
individually
• Loads connected at less than 60kV may be aggregated into an “equivalent load” at the 69kV
Bus
• Auxiliary and Site Service Load may be combined
Note: Auxiliary load is defined as that which is only present when the generator is running
– In some cases it will be necessary for ERCOT and the Private Network to
review specific assets and/or sites to make a determination on whether or
not it is required to be registered / modeled
• These cases will be addressed during a WebEx coordinated by the RE’s Account Manager
http://nodal.ercot.com
17
Lead from
the front
Texas Nodal
Special Topics
Originally Presented on 3/13/09
• Issues Encountered on initial audit report group
– Found that some validations were too “tight.”
• These have been relaxed
• Will be discussed on the conference call with your Account Manager if
applicable to your audit report
• Example high / low side manufactured voltage on transformers was asking for
levels at exactly 69,138 or 345 – it now allows up to 9% deviation from these
levels (warns > 5%)
– Data Pre-population issues
• Size of each step on transformer high/low tap settings calculated incorrectly
– ERCOT will calculate this based on data provided by RE
– This will be ignored if in error on the audit report
• Transformer Reactance / Resistance incorrectly calculated
– ERCOT will provide correction to RE’s for first iteration 1 submittal
• Loads missing on Load tab
– In cases where PUN’s have multiple substations under a site code, those
substations that are not the same mnemonic as the site code did not
populate the Load data. ERCOT will send the additional Loads left off
http://nodal.ercot.com
18
Lead from
the front
Texas Nodal