Low-speed generator for wind turbines and small hydroelectric
power stations
Hydroelectric power stations «SAKI»
Applicant: JSC «Technopark of Kazakh National University named after Satpayev K.»
Author: Doctor of Technical Sciences, Professor Isembergenov N., Bersembayev S.
Contacts: Almaty city, Satpayev Str., 22
Tel.: +7 727 293 08 90
Description: The novelty and uniqueness of the project lies in the fact that the proposed new types of low-speed
generators for wind turbines and small hydroelectric power stations can be made on the basis of existing commercially
available induction motors , while on the design, they are simple and practically feasible in production and can be
made by enterprises in Kazakhstan. This is achieved by the fact that the rotor reface Mass production engines for the
installation of permanent magnets , and the permanent magnets are arranged in a certain order that allows low revs
to get an AC voltage
Advantages: Designed a low speed generator can be applied
not only in wind turbines and small hydroelectric power
stations, but also in the power industry, farms and private farms
to supply self-contained power supply, as well as in the lowspeed gearless drive.
Current status:
Low-speed generator after modernization under hydroelectric
power station has been installed at a hydroelectric power station
"Saki.
Currently JSC "Technopark KazNTUā€ž and the «Nazarbayev
University Research and Innovation System» are signed a
contract for prototyping low-speed generator that is compatible
with three-phase inverter and system voltage stabilization
Description: novelty and uniqueness of the project lies in the fact that hydroelectric power station "Saki" used supply
water to the blade. With the use of jet of water supply to the turbine blades, it will be possible to reveal the loss of
water power. Due to the drive, the height of the water level constant, it provides a continuous turnover of the turbine
at any season of the year.
Advantages: "Saki" can work without the dam, in world practice it is
applied for the first time. Also, this hydroelectric power station can be
operated on any mountain rivers.
Also, "Saki" is a mobile unit that can be easily transported from place to
place.
Current status: Full illumination of the two-storeyed private house of the
applicant, owing to stable tension to the inverter via accumulators 26B,
after the inverter 220B and with a frequency of 50 Hz, and also stable
tension after the inverter 220B and with a frequency of 50 Hz, capacity to
3 kW became results of the last tests of hydroelectric power station which
successfully passed in November, 2012 in the settlement Zhandosov,
Almaty area.