San Marcos/Texas State University 2014 Work Plan 5.3.1/5.4
Download
Report
Transcript San Marcos/Texas State University 2014 Work Plan 5.3.1/5.4
CITY OF SAN MARCOS/TEXAS STATE
UNIVERSITY
2015 WORK PLAN
BUDGETED CONSERVATION MEASURES
5.3.1/5.4.1
Texas Wild-Rice Enhancement and Restoration
Long-term Objective (Phase I): to establish 8000 m2 of
additional TWR (in addition to baseline of 4000 m2)
Target goal of 1100m2 achieved for 2013
On track for 2014
Goal continued into 2015
Monitoring:
95% success rate in 2013
After USFWS survey, 2014 expansion can be determined
TWR Enhancement Budget
Labor: $155,151
Travel (in-state): $1,000
Operations & Materials: $9,290
Equipment: $9,000
o Total: $174,441
Table 7.1 allocation for 2015: $175,000
Two percent increase: $3,500
Proposed Budget: $178,500
5.3.6/5.4.4
Sediment Removal
Long-term Objective (Phase I): Initial removal of
targeted fine sediments from Spring Lake to IH-35 and
then maintenance removal of sediment accumulations
2013 - Dropped bed elevation about two feet over an
86m2 area at the two permitted locations
2014 – enlarging sites within the two permitted areas –
expect to top out at 1000 m2 (3000 m2 was target)
2015 – will expand downstream with new permits to gain
an additional 1000 m2
Sediment Removal Budget
o
Labor: $185,151
Travel (in-state): $1,500
Operations & Materials: $14,000
Equipment: $20,000
Total: $220,651
Table 7.1 allocation for 2015: $ 25,000
Remainder of initial funding: $500,000 (initial) - $151,800
(2013) & $150,000 (2014) = $198,200 remaining
Proposed Budget: $223,200
5.3.8/5.4.3/5.4.12
Control of Non-Native Plant Species
Long-term Objective (Phase I): Reduce density of
invasive non-native aquatic & littoral plants
Littoral: First sweep of elephant ears complete (2013 &
2014); maintenance and native plantings (2015)
Aquatic: 1513 m2 (2013); pulled back sediment removal
efforts to meet 2014 goal of removal & planting (Sewell,
City and Bicentennial parks)
2015 – North Sewell and Rio Vista
2013 - $375,000
2014 - $175,000
2015 - $125,000
Control of Non-native Plants Budget
Aquatic plant removal: $223,225.67
Plant propagation: $65,477
Littoral plant removal: $40,000
Equipment: $5,700.00
Expenses: $10,000.00
o Total: $344,402.67
Table 7.1 allocation for 2014: $125,000
Additional requested: $219,402.67
Proposed Budget: $344,402.67
5.7.1 Native Riparian Habitat Restoration
Long-term Objective: Establish a robust native riparian
community that benefits Covered Species and the habitat
quality adjacent to and within the San Marcos River down
to IH-35 as well as prevents public access in undesirable
locations which will decrease bank erosion.
Two-thirds of the designated area has been planted with
two sites remaining – Rio Vista (4050 sf) & Ramon Lucio
(16,400 sf)
Rio Vista - $29,497.50
Ramon Lucio - $190,554.00
Native Riparian Habitat Restoration Budget
Table 7.1 allocation : $20,000
Amount required to complete both sites:
$220,000 or $55,000 over 4 years
Budget Plan: Transfer funds from Litter
Removal (Measure 5.3.3) and Non-native
Species Control (Measure 5.3.5) = $35,742.70
Proposed 2015 Budget: $55,000
5.3.3/5.4.3 Management of Floating Vegetation
Mats and Litter
Long-term Objective: Minimize impacts of floating
vegetation and litter on TWR stands and overall aquatic
community within the San Marcos River
Table 7.1 allocation for 2015: $80,000
Contract Amount: $48,798.10
Unused funds to be transferred to riparian effort:
$28,701.90
Public Outreach Funds: $2,500.00
Proposed Budget: $80,000
5.3.5/5.3.9/5.4.11/5.4.13
Non-Native Species Control
Long-term Objective: Reduction of non-native, invasive
species in the San Marcos River to levels that minimize
their direct and indirect impacts on Covered Species and
the aquatic ecosystem.
Table 7.1 allocated funds: $35,000
Contract Amount: $24,960.00
Unused funds to be transferred to the riparian effort:
$7,040.80
Public Outreach & 2% increase: $2,500 & $499.20
Proposed budget: $35,000
5.3.2/5.4.2
Management of Recreation in Key Areas
Target 2015/Performance Measure: Educate the public engaged in water-based
recreation on sustainable river use that protects listed species and their habitats.
Pick up litter in and along river
Remove vegetation mats
Monitor recreation behaviors and impacts on habitat
Construct and clean TWR enclosures
Monitor ongoing HCP projects
Empty trash boats
Survey TWR stands within enclosures
Place signs and repair fence
Educate river users
Allocated funds for 2015: $ 56,000
Proposed Budget: $56,000
5.7.6 Impervious Cover/Water Quality Protection
Long-term Objective: Implement a program that
minimizes the impacts associated with urbanization and
changes in land use/cover in the Upper San Marcos
watershed; manage stormwater as close to its source as
possible, treat stormwater as a resource rather than a waste
product; emphasize conservation and the use of on-site
features to protect water quality; and increase infiltration
to groundwater and aquifer recharge for the protection of
riverine integrity.
Table 7.1 allocation for 2015: $200,000
Proposed Budget: $200,000
5.7.5 Management of Household Hazardous Waste
Long-term Objective: Continue to provide a
place for citizens of San Marcos and Hays
County to safely dispose of HHW.
Table 7.1 allocation for 2015: $30,000
Proposed Budget: $30,000
Sessom Creek Sand Bar Removal Budget
o Table 7.1 allocation for 2014: $ 75,000
o As recommended by Dr. Hardy and agreed to
by the Science Committee, this measure will
be undertaken in a systematic manner over
time while monitoring downstream impacts on
existing Texas Wild Rice stands in Sewell
Park. There is the possibility that this measure
may continue into the winter of 2015 before
the targeted removal is completed.