La saga de la directive Mining Waste

Download Report

Transcript La saga de la directive Mining Waste

E-PRTR: Point of view and questions of the
extractive sector about the
Guidance Document
FORTEA + MRW: DGRNE + ICEDD
ICEDD
European Pollutant Release and Transfer Register
Background
 European Pollutant Emission Register
familiar to cement and lime producers but
new to quarries
 2007 first year of monitoring for quarries
Quarry
specific
issues
 First reporting: January 2008
 Collaboration Walloon Region Authorities
with FORTEA to clarify some items related
to PRTR declaration
Next
actions
2
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Area effectively under extractive operations
 E-PRTR Annex I includes at Opencast mining and
Background
quarrying where the surface of the area under extractive
operations equals 25 ha.
 Guidance document clarify this surface
Quarry
specific
issues
Next
actions
3
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Area effectively under extractive operations
Background
Reserves
Quarry
specific
issues
Under extractive
operations
Next
actions
Rehabilitated area
4
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Area effectively under extractive operations
Starts with: top soil stripping
Background
Quarry
specific
issues
To be approved by competent
authorities
Next
actions
Ends with: rehabilitation
according to permit
E-PRTR FORTEA + MRW:DGRNE + ICEDD
5
JmV 20070612
Area effectively under extractive operations
Background
Quarry
specific
issues
Next
actions
1site, 4 installations, 4 operators, 1reporting
6
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Area effectively under extractive operations
Background
Quarry
specific
issues
Next
actions
2 sites, 2 facilities, 2operators, 2 reporting
7
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Area effectively under extractive operations
Background
Quarry
specific
issues
Next
actions
2 sites, 2 installations, 1 operator, 2 reporting
8
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Release to air, water and land
 No land released known
Background
Quarry
specific
issues
Next
actions
 How to monitor releases into air?
9
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Release to air
 Method suggested:
Background


Measurement if single point of emission
Calculation for diffuse emissions (majority of case)
- Process description with emissions sources
Quarry
specific
issues
Next
actions
10
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Release to air
 Emission = Activity Data * Emission Factor *
Attenuation factor
Background


Quarry
specific
issues

Next
actions

(E=AD*EF*AF)
E= emission to air to report
AD = activity data measures the activity of the facility
e.g.
– For PM10, quantity of product processed per year
– For other pollutant: annual fuel consumption or
annual working time
EF = emission factors as listed in approved reference
list
AD = attenuation factor as listed in approved reference
list e.g.
– Use of water spray during production decrease the
amount of PM10 emitted.
11
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Release to air
Background
Quarry
specific
issues
Source: process.
Sources: engines
(dumper, loader),
heating device, ...
Next
actions
Use EF given by the
constructor in g/working
hour or g/l of fuel
Use EF in g/t
produced e.g. AP42
from US EPA or other
approved reference
E-PRTR FORTEA + MRW:DGRNE + ICEDD
12
JmV 20070612
Release to water
 Method suggested:
Background
Quarry
specific
issues
Next
actions

Sampling of releases
of waste water and
analysis of pollutants
content. Compute
annual load by
multiplying analysis
results by annual
flow.
- Describe hydrogeological conditions
and water flows to
qualify dewatering
outlet water
13
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Release to water
Don’t subtract background load
Subtract background load
Meteoric precipitation
Background
Surface water
Quarry
specific
issues
Perched water table
Water flow
River
Water flow
Water flow
Aquifer
Next
actions
Quarry
14
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Site transfers
Background
Quarry
specific
issues
Next
actions
Not a specific
issue for quarry
Mining Waste Directive doesn’t change the
issue
15
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
E-PRTR for Quarries in a nutshell
 Producer propose a technical file containing:
Site description with specification of the area under
Background
effective exploitation and operators
 Facility description including flow-sheet and describing
air emissions sources
 Calculations principles: description of AD, EF and AF
 Hydro geological scheme with water inlet and oulet
Quarry
releases description
specific
 Water pollutant sampling plan and annual flow
issues
measurement
 List of off-site transfer wastes
 Technical file submitted to competent authority for
approval
Next

actions
16
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612
Work programme
 Complete guidance to the Guidance Document with
Background
Regions Administrations:



Quarry
specific
issues

Acceptance of principles.
Choice of EF and AF for PM10 and other air pollutant
Diffusion of the document through FORTEA
Workshop with authorities and producers
 Review of the document for 2009 declaration
Next
actions
17
E-PRTR FORTEA + MRW:DGRNE + ICEDD
JmV 20070612