BRTS Lahorex

Download Report

Transcript BRTS Lahorex

28.7 km (Shahdra to Gajjumatta)
27 stations (54 platforms)
8 at grade intersections
Depot
Chungi
Ghazi
Qainchi
Gulab Devi
Kama Chowk
Azadi
Timber
Elevated Portion – 8.5 km (Muslim
Town to Azadi Chowk) – 9 stations
Planning and
Execution
 9 PC-Is (Package 1 to Package 9)
 Housing Department –
Executing Department through
TEPA (LDA)
 Other Agencies involved –
Urban Unit, Transport Planning
Unit, NESPAK etc
 Completed in Record Time –
about 11 months
 Total Cost – Over 30 billion PKR
Bidding Process (Single-Stage: Two-Envelope)
Approval
Deadline
STOP
Approval
Technical
Proposal
Financial
Proposal
Technical
Proposal
Technical
Financial
Proposal
Financial
Preparation
Financial
Evaluation 1
Evaluation 2
Private Contractors
 NLC
 NESPAK
 HABIB
CONSTRUCTION
 IKAN
 SKB
 ZKB
 PGE
 And others
45 Articulated Buses – operated by
Albayrak (Turkish Firm)
Fenced Corridor
E-ticketing (Automated Fare
Collection)
Signal Priority System –
Monotubes, Mast Arm Poles
Pedestrian Push Buttons
ITS (Intelligent Transportation
System)
SIGNAL PRIORITY SYSTEM
COMMAND AND CONTROL
CENTRE
SCATS – AUSTRALIAN SYSTEM
System Overview
Video Walls
PTZ =20
Core Network
PTZ = 4
BOX = 6
Workstations
Video Recorders,
Servers, Storages
CCTV/ PAS/ ITS Connectivity
Command &
Control Center
Station
Station
Station
Intersections
Station
GPON-Fiber (SMF)
Station
Station
Station
Station
Station
Station
Communication Network (GPON)
Cameras
Camera
Type
Location
No of
locations
No
Total
Cameras
PTZ
Station (Type-1)
18
4
72
Box
Station (Type-1)
18
6
108
PTZ
Station (Type-2)
6
4
24
Box
Station (Type-2)
6
10
60
PTZ
Station (Type-3)
3
4
12
Box
Station (Type-3)
3
14
42
PTZ
Intersections
8
2
18+2
PTZ & Box Camera
(Outdoor) Heavy Duty
 1-1.3Mega Pixel
 IP Based
 IP-66 compliant
Ethernet Switch
 Remotely manageable at
Command & Control
Center
 10/100BaseT
 10/100/1000BaseT
(combo) for uplink
 Operating Temperature
-10oC to +60oC
Video Wall
 Projection of all
PTZ & Box cameras
 MBS Stations, corridor
 ITS Intersections
 55”(8 x3) Matrix
Screen Management Console
 Video wall management
 Input / output screen
management
 Decode IP to
VGA/DVI/HDMI
 Video projection of
cameras.
Installations at station
 Cameras (PTZ & Box):
 Installation of station cameras using foiled twisted pair
cable (FTP) CAT-6
 Station Cabinets:
 Installation of station cabinets for data network
communication.
 Installation of high environmental temperature resistant
Ethernet switches for communication
Public Address System
 Installation of Public Address System :
 Voice amplification system at each platform.
 Outdoor speakers at each platform & pedestrian bridges
 Provision to playback Pre-Recorded Voice for public
 Provision for custom announcement through MBS staff
for general purpose as well as in case of emergency etc.
Power at (Intersection / Stations)
 Power at stations through:
 National power grid
 Standby power generator

At each station
 UPS

15 kVA for IT & other equipments
 Power at intersections
 Power supply from nearby MBS station / lines
 UPS at intersection for ITS
Cabinets
 At Intersections
 ITS cabinets will be used for the installation of Ethernet
switches, camera termination etc.
 At Stations
 IT communication cabinets at each MBS station for
Ethernet switches, camera termination, etc.
Drawings
 Stations
 Intersections
CCTV / Public Address System
for MBS Station Drawings
Inauguration – 10 Feb 2013
Command and Control System
Ridership – 125000 pax per day
Political Will – The real motive