Why new Data Center?
● Old Data Center not secure enough
o
o
Wooden ceiling
Has water pipes
● Too long wait for a new building
o
The need has been discussed for many
years
● Too expensive to upgrade the old
building
New Data Center
● External partner: Basis
o
o
o
ISO 27001 Certified
PCI-DSS
Hosts many companies
● Alþingi owns the hardware
o
Has it own “server rack”
The migration planning
● The planning and preparation took some
months
Deciding which hardware should be moved
Move servers into virtual servers
Consolidate data that should be moved
onto one SAN
o Connection
o
o
o
Connections
● Between Alþingi and Basis
Primary connection through “Dark Fiber”
(1Gb/s)
o Secondary connection through IP 100Mb/s
o
● Internet connection via Basis
Traffic from January
Storage Area Network
● EMC (26TB)-> IBM (16TB)
o
o
Storage solution from EMC was left behind
New storage solution from IBM installed


All servers using SAN need to talk to IBM SAN
All data relevant data moved to IBM SAN
solution (8TB)
● EMC still used for security cameras
recordings (12TB)
Servers
● Before moving to Basis
o
o
Moving most servers Xen (virtual server)
VMware virtual servers moved to Xen
● 8 physicals servers moved
o
o
o
o
Sun x1
Xen (SuperMicro) x1 with 36 virtual servers
Linux x5
Windows x1
Servers left behind
● IBM DataBlade Center
● Some physical servers
● Mostly related to
Security (video servers, access servers,
lights servers)
o Encoder for live broadcasting and VOD
o Audio recording
o
Also left behind
● Telephone station
● Network switches
● The fiber cable connection
The moving plan
● Saturday
o
o
o
o
o
Start at 6:00 - shutdown servers and start packing
Truck arrives at 7:30
Police escort at 8:30
Unpacking starts at 9:00, servers booted when
ready
Testing if everything works at 11:00
● Sunday
o
Employees at Basis and Alþingi should be standby
Problems
● Sun server does not boot normally
Problems
● Sun server does not boot normally
● Xen does not boot normally
Problems
● Sun server does not boot normally
● Xen does not boot normally
● Paths to EMC still in the configuration
Experience so far
● Mostly running smoothly
● One major incident in May
o
o
o
Earthquake
Problems in one aluminum smelter
Leads to power surge in the national power
system
Electricity incident
Power
Company
Diesel
generator
UPS
Power
Company
Diesel
generator
UPS
Electricity incident
Power
Company
Diesel
generator
UPS
Power
Company
Diesel
generator
UPS
Power
Company
Diesel
generator
UPS