ILS Committee Update

Download Report

Transcript ILS Committee Update

SWAN Committee of the Whole
Woodridge Public Library
Presented by Aaron Skog, SWAN Executive Director
August , 2013






Network Changes Update
Millennium Update
Millennium R2011 Upgrade
Elmhurst Update
JAR Error Update
ILS Committee Update
 RFP posted
 Task Force Groups
 Memo #1: Introduction & Overview of project,
goals, new email list of IT contacts shared
 Memo #2: New Millennium installer with
R2009B.1.5 & Hostname: 1 week deadline to
complete
 Shutdown old MLS/SWAN website
 Prepare SSL certificates
Upcoming 8 Memos
 List new websites using *.swanlibraries.net
domain, new SWANcom list, perhaps include
SWANcorps list
 SWAN will announce its new internal IP address
 Steps for 3rd Party Self-checks
 Q&A Meeting closer to network cutover
 Two meetings
 Recorded for later viewing online
SWANTech website
Memos
archived
Installer
information
FAQ’s



Millennium software upgrade required
Announced August 7th
See Network Changes Memo #2: Required
Millennium Software Upgrade
 Prepares for OCLC control records
 Installer removed references to SWAN Internal IP:
part of Network Changes

Due Sunday August 18th 10 P.M.
Preparation for
R2011.1.4 Upgrade
Waiting for Test Server
Upgrade to R2011
On Hold: Test Server
Print Templates problem
Awaiting III fix from
Software Engineering
Goal: Production
Upgrade Sept/Fall 2013
Second “gap”
data extract
August 19th
Starting Aug 19th,
Elmhurst patron
holds blocked,
Ptypes removed
Last day on
SWAN
September 1st
Have you seen this?
 Millennium JAR error: the
specific JAR file name will
change (“Could not find
xxx”)
 We have some answers!
Research @ LGS & WCS found local network
adjustments helped reduce/eliminate the JAR error
7 Network Layers were
Researched, Layers 1-6
affect Layer 7 (Millennium)
Contact SWAN Member
Services:
help.swanlibraries.net
or call 630-734-5153
Ask for Versatile to help
Recommendations Coming: work on bringing the affected library's network
infrastructure up to standards compliance and follow best practices.







Updating library-managed switch and firewall firmware
Ensuring DNS, DHCP, routing, vLANs, other network services are
configured for better compliance with standards and best practices
Ensuring point-to-point connections are not generating excessive CRC
errors
Reduce network broadcast packet traffic, where possible
Updating local computer hardware drivers
For affected computers, replacing patch cables of unknown quality that
are in the cable path from the computer to the firewall
For affected computers, replacing unmanaged 'consumer-grade'
switches of unknown quality that are in the cable path from the
computer to the firewall







RFP posted!
New “RFP” menu
Task Force Groups selected
7 Groups
CHAIR: library member
LIAISON: ILS Committee member
Notified Friday Aug 9th & ILS Bulletin Monday
August 12th
http://support.swanlibraries.net/system/files/Task%20Forces.pdf
SWAN Member
Libraries
SWAN Board
ILS Committee
Acquistions (5)
System
Administration (6)
Directors (5)
OPAC (7)
Cataloging (6)
Reports (5)
Circulation (7)

RFP Guidelines Reminder for All SWAN
Libraries:
 RFP is posted on SWAN website
 If any vendors contact you or ask questions, refer
to Aaron Skog
 Avoid bias or giving a vendor a “leg up”
 Past tactics for consortia include letters from
current vendor, out-of-the-blue phone calls

Quarterly Sept 5 rescheduled to Sept 12:
Glenwood-Lynwood Public Library
 Strategic Plan Year-One Report
 Overview of SWAN FY15 Budget Process
 RAILS Update
Aaron Skog, [email protected]