Migration of Surveillance Data to IP:
An overview
Dimitris Doukas
DAS/CSM
ACP/WGN/SG1 7th Meeting
27 March 2006, Malmo
European
Organisation
the Safety
of Air2006
Navigation
th meeting
ACP / WGN
/ SGN1 #7for
March
Content

Surveillance Data Distribution Requirements Forum Activities

Implementation Examples

RMCDE

Multicast
ACP / WGN / SGN1 #7th meeting March 2006
SDDRF: Migration of Surveillance Data Exchange
from X25 to IP

IP-SDE Working Team established under the SDDRF

Documents under preparation:
 Functional
Requirements
 Security Requirements
 Safety Requirements
 QoS Requirements
 Communication Interface Specifications (e.g.
Protocols)
 Implementation Planning
ACP / WGN / SGN1 #7th meeting March 2006
SDDRF: Drafting of Detailed Requirements

Target: have all documents finalised in Q3 2006

Finalised Requirements will be submitted for
approval to the EUROCONTROL Surveillance &
Communication Teams
ACP / WGN / SGN1 #7th meeting March 2006
IP Implementation in RMCDE


Surveillance data distribution over IPv4 for WAN
communication has been implemented
Validation tests have been planned in phases




Between RMCDEs only (in a mixed environment X25/IP)
Between RMCDEs with the use of a minimum underlying
network infrastructure (IP routers, X25 switches)
Between RMCDEs with the use of actual network
infrastructure (RAPNET) and IP routers
Between different environments (not only RMCDE)
ACP / WGN / SGN1 #7th meeting March 2006
IP Implementation in the RMCDE



First two phases done successfully
Test programme planned to be completed Q4 2006
IPv6 planned for implementation in 2008
ACP / WGN / SGN1 #7th meeting March 2006
Multicast data distribution

IPv4 operational (at national level - Spain)

IPv6 planned for 2007/8

International Multicast: 2010+ (PENS)