11 th CJK NGN-WG

Download Report

Transcript 11 th CJK NGN-WG

11th CJK NGN-WG
(CJK NGN Test-bed Activity Report)
CJK
Test-bed
2008. 2. 22
CJK NGN Test-bed Ad-hoc Group
The 11th CJK NGN-WG Meeting
1
Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
Meeting Discussion Results
Agreed Test Scenarios & Actions
Agreed Scenarios for Performance Monitoring
Agreed Schedule Changes
Measurement segments by MPM
Network Configuration for Scenarios 6 & 7
Test Scenarios Details
Further Discussion Items
Next Steps
The 11th CJK NGN-WG Meeting
2
Meeting Discussion Results
•
•
•
•
•
Test items and their schedule should be clarified. For example, what is the
implication of the test for IPTV.
Network environment, which is going to be the mixture of R&D and commercial
networks: if they turned to be all R&D networks, it is easy to support high-speed
traffic such as video. If they turned to be all commercial networks, we do not
have to worry about background traffic, but need further investment.
Further involvement of other participants: TTA will check further involvement of
the government initiatives (till the next meeting). CCSA will check the possibility
of further involvement by the company who are interested in IPTV performance
measurement.
Other methods beyond RTP/RTCP passive measurement.
After the discussion by ad hoc team, the following test plan was proposed and
agreed by the meeting, which is given in 11thNGN-WG_021.
The 11th CJK NGN-WG Meeting
3
Agreed Test Scenarios & Actions
• Scenarios 2 & 4 are completed
• Scenarios 1, 3, & 5 are considered as the slight variations of the
scenarios 2 & 4. Ad-hoc group agreed not to conduct the testing since
the testing of the scenarios 2 & 4 fulfilled the objectives
• Thus Phase I & II are considered to be completed
• Scenario 6 & 7 are our target for joint testing efforts for Phase III & IV
• For the reference the following are original 7 scenarios
–
–
–
–
–
Scenario 1: Single Call Server within a single NGN Network Domain without PSTN
Scenario 2: Call Servers across multiple IP Network Domains without PSTN
Scenario 3: Single Call Server within a single NGN Network Domain with PSTN
Scenario 4: Call Servers across multiple NGN Network Domains with PSTN
Scenario 5: Call Servers across multiple NGN Network Domains with PSTN & Value
Added Services
– Scenario 6: Performance Evaluation with RTP/RTCP-based Measurement extensions
– Scenario 7: Call Servers across multiple NGN Network Domains with PSTN, Value
Added Services and RACF Involvement
The 11th CJK NGN-WG Meeting
4
Agreed Scenarios for Performance Monitoring
•
•
Scenario 6-1: Performance evaluation of Network Segments
–
–
–
–
–
Measure Network Performance Metrics among CJK independent from services
Measured results can be cross referenced by subsequent tests for accuracy
Periodic and constant measurement
Measurement intervals and other details to be defined
IPTD, IPDV, IPLR of C-K, C-J, J-K, J-C, K-C, K-J
Scenario 6-2: Performance evaluation of MoIP service among CPEs
– Measure RTP/RTCP performance of MoIP(Multimedia(Voice/Audio/Video) over IP)
service based on CS and/or IMS
– CPE-to-CPE performance evaluation
•
Scenario 6-3: Performance evaluation of MoIP service with two MPMs
– Measure RTP/RTCP performance of MoIP service based on CS and/or IMS
– CPE – MPM1 – MPM2 – CPE performance evaluation
•
Scenario 6-4: Performance evaluation of MoIP service with three MPMs
– Measure RTP/RTCP performance of MoIP service based on CS and/or IMS
– MPMs send/append evaluated performances
– CPE – MPM1 – MPM2 – MPM3 – CPE performance evaluation
The 11th CJK NGN-WG Meeting
5
Agreed Schedule Changes
•
Phase I: 2006 3rd/4th Quarter (Completed)
– Network Connectivity
– Scenario 2 and 4 only (2 CS and 2 domains)
– Status Report during 8th CJK NGN Meeting (January 2007)
•
Phase II: 2007 1st/2nd Quarter (Completed)
– Scenario 1 and 3, (simpler version of 2 and 4, single domain)
– Status Report at the 12th CJK NGN Meeting (March 2008)
•
Phase III: 2008 1st/2nd Quarter (Proposed)
– Performance Evaluation of RTP/RTCP-based MoIP (Multimedia(Voice/Audio/Video) o
ver IP) service
– Network connective for Performance evaluation and Performance Monitoring
Scenarios 6-1 and 6-2
– Status report at the 13th CJK NGN Meeting in 2008. 9 or 10
•
Phase IV: 2008 3rd ~ 2009 2nd Quarter (Proposed)
– Performance Evaluation of RTP/RTCP-based MoIP and IPTV services
– Performance Monitoring Scenarios 6-3 and 6-4
– Initial RACF Interoperability testing : Scenario 7
– Testing of RACF and RTP/RTCP-based MPM Interactions
– IPTV Interoperability testing
– Status report at the 14th and 15th CJK NGN Meetings
The 11th CJK NGN-WG Meeting
6
Measurement Segments by MPM
CPE – MPM1 – MPM2 – MPM3 – CPE (segment: MPM-to-MPM, MPM-to-CPE)
Note: MPM stands for Management of Performance Measurement for NGN. It is based on the ITU-T
Recommendation Draft Y.mpm. MPM used throughout this document is a system realized based on the
capabilities defined in Y.mpm.
The 11th CJK NGN-WG Meeting
7
Network Configuration for Scenarios 6 & 7
SIP Server
CPE
(PC with RTP/RTCP
terminal software)
CPE
(PC with RTP/RTCP
terminal software)
CPE (RTP/RTCP
terminal hardware)
CPE (RTP/RTCP
terminal hardware)
SIP Server
Korea
(ETRI Labs.)
China
(CATR Labs.)
MPM
MPM (Router with mirror
port and RTP translator)
Scenario 6-1
MPM
Scenario 6-3
Japan
(KDDI R&D Labs.)
SIP Server
The 11th CJK NGN-WG Meeting
CPE
(PC with RTP/RTCP
terminal software)
Scenario 6-4
CPE (RTP/RTCP
terminal hardware)
8
Test Scenarios Details
Inter-connectivity
tests
Scen
ario
No.
IP Networks
Service platfo
rm
Services
CPE
Terminals
Evaluations
1
C-K:
R&D
Network
SIP
(Call server)
VoIP
VoIP terminal
Inter-operability
Testing
(Signaling of
Call server
PSTN-GW)
Report
Note
8th CJK meeti
ng, 2008.3
Completed
8th CJK meeti
ng, 2007.1
Completed
3
8th CJK meeti
ng, 2007.1
Completed
4
8th CJK meeti
ng, 2007.1
Completed
5
8th CJK meeti
ng, 2007.1
Completed
13th CJK mee
ting, 2008.9
In
progress
2
Performance eval
uation test
Inter-connectivity
and performance
evaluation test
6
C-K:
R&D NW
7
C-J: commer
cial NW
K-J: commer
cial NW
The 11th CJK NGN-WG Meeting
SIP
SIP /
IMS-SIP
RTP
Streams
(MoIP:
Multimedia
over IP)
Voice/
Audio/
Video)
>>IPTV
RTP terminal
C,J,K
(PC or Dedica
ted hardware
(by KDDI R&
D))
Performance
Testing
(RTP/RTCP
Based MPM:
KDDI R&D (PC
server),
ETRI)
Inter-operability
Testing
RACF:
ETRI, (KDDI R
&D)
Count
ries
CK
CJK
Local test
C,J,K
Two
MPMs
C-J, K-J,
C-K
14th or 15th C
JK meeting
Three
MPMs
C-J-K
9
Further Discussion Items
•
•
•
•
•
•
•
•
•
Functions of MPM and CPE
Measurement intervals and metrics
Background traffics
Specifications of the existing system (e.g. Call server)
Type of RTCP extensions
Mixture of the R&D network and commercial network
Commercial service providers and solution vendors involvement
Finding collaboration opportunities with other related Testing Programs (e.g., BcN test-bed)
Other performance evaluation methods besides RTP/RTCP-based passive measurement
(Active measurement)
The 11th CJK NGN-WG Meeting
10
Next Steps
• Deliver the completed testing report of Phase I & II
• Complete IP network connectivity among CJK
– R&D Network between C – J and Commercial Networks between C-J and K-J
• Define detailed Test-bed Network Configuration
• Define detailed Test Scenarios and Test Items
• Target date for the above efforts is March 31, 2008
The 11th CJK NGN-WG Meeting
11