Communications Infrastructure Committee
Update for the IAC
Friday, April 15, 2011
Initial Building List
•
•
•
•
•
•
•
•
•
Occupational Therapy
Clark - Done*
Shepardson - Done*
ARBL - Done*
Engineering
NESB
A/Z
VTH
Atmospheric Science
– * Single GigE for now
April 15, 2011
IAC Update
2
Issues and Difficulties
•
•
•
•
Switch Consistency (Type and Configuration)
Documentation (Change mgmt., ports, vlans)
Security (Physical and Virtual)
Resources
– Hardware inventory
– People – delegation of responsibilities (configurations,
responding to outages, etc.)
• Multi-departmental occupancy of buildings
• New technologies
– Radiation Safety Project
– VoIP – exacerbated by all of the above
April 15, 2011
IAC Update
3
Issues and Difficulties (Cont’d)
900+ switches
120+ MDFs/IDFs
40,000+ systems
Video, Environmental Controls, Power Meters,
Voice, Police/Fire, Security Panels, Servers,
Wireless, Private College LANs, etc…
• Main campus, West Campus, South Campus,
Remote sites comprising
•
•
•
•
– 213 Subnets
– 60 Subnet managers
April 15, 2011
IAC Update
5
April 15, 2011
IAC Update
6
Small sample and examples of concerns
•
•
•
•
•
•
•
•
•
•
•
Environmental controls offline due to multicast storm, After hours response by
Facilities, April 2011
Looped network takes down environmental controls requiring reconfiguration of
switches and further monitoring after hours by Facilities, NOC, April 2011
Firewall not configured to be on network and thus not firewalling, March, 2011
Several building networks down along with environmental controls due to dualhomed server misbehaving. Discovered hubs and other devices as part of debug
process. March, 2011
VOIP and Wireless down due to cables being moved to wrong switch ports. March,
2011
Compromised machines swamp entire LAN affecting police/fire, March 2011
Departmental servers down, nobody knew location of switches affecting servers nor
configuration of switches thus requiring NOC to respond, find, fix, March, 2011
Unit carrying police/fire notifications moved to wrong port on switch. After hours
response by NOC, Facilities, Feb. 2011
Lost communication on large campus network due to switches being plugged into
each other incorrectly. Feb. 2011
Network device with duplicate IP takes down a College’s central server, Feb 2011
Emergency fiber run had to be made to bypass departmental network device
incapable of handling vlans for cardkey access, Feb, 2011
Directive, from VPIT
• Must ‘harden’ our network for future
applications, including VoIP
April 15, 2011
IAC Update
8
Discussion
• Is most welcome