Particulate Air Pollution and Effects

Download Report

Transcript Particulate Air Pollution and Effects

Risk Management
John Watt
Overview


An introduction to risk management standards
and frameworks.
An overview of organisational management of
risk, illustrated in part by experience from the
Athlete’s Village case study. How does health
and safety risk management integrate with the
wider organisational controls?
Overview


How do various stakeholders impact on the process? Risk is
dynamic and changes things like budgets, design criteria or
deadlines have an immediate impact on its management.
Experience from the Athlete’s Village case study will show
some ways that such challenges can be met.
Communication with stakeholders means different things at
different parts of the project. The Athlete’s Village stakeholder
map will be used to show examples of this. It is necessary to
have a dialogue with some stakeholders in order to decide what
to do, whereas in other cases risk communication is more
concerned with changing behaviour as part of a management
process.
ISO 31000
Culture?

Embedding risk management involves an
environment that can demonstrate leadership
from senior management, involvement of staff
at all levels, a culture of learning from
experience, appropriate accountability for
actions (without developing an automatic
blame culture) and good communication on
risk issues.
A structured approach to Enterprise Risk Management (ERM) and the requirements of
ISO 31000
(IRM, AIRMIC and ALARM)
CONVENTIONAL RISK HANDLING
Deciding
Who needs to
know what,
when?
Management
Communication
The knowledge
Understanding
needed for
judgements and
decisions
Appraisal
Who needs to
do what, when?
Most risk handling processes do not go beyond these steps
Bunting (2007). An introduction to the IRGC Risk Governance Framework
IRGC’S RISK GOVERNANCE FRAMEWORK
Getting a
broad picture
of the risk
Deciding
Management
Is the risk tolerable,
acceptable or
unacceptable?
Pre-Assessment
Communication
Characterisation
and Evaluation
Is the risk simple,
complex, uncertain
or ambiguous?
Risk
Understanding
assessment
PLUS
Concern
assessment
Appraisal
Categorising
the
knowledge
about the risk
Bunting (2007). An introduction to the IRGC Risk Governance Framework
Drivers
A structured approach to Enterprise Risk Management
(ERM) and the requirements of ISO 31000
(IRM, AIRMIC and ALARM)
Risk management framework
A structured approach to Enterprise Risk Management (ERM) and the requirements of
ISO 31000
(IRM, AIRMIC and ALARM)
Risk management process
A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000 (IRM, AIRMIC and ALARM)
Safety Risk
Assessment






Judgements on:
What are the hazards?
What risk events could happen?
How likely are they?
How severe would the outcome be?
Vulnerability?
Some definitions




Hazard – situation which could cause harm e.g.
an earthquake fault line;
Risk – the probability that a certain kind of harm
is realised
Risk assessment – an essentially technical
process of assessing risk
Risk management – a non-technical process of
selecting safety measures
Stakeholder Involvement
Civil society
Affected
stakeholders
Affected
stakeholders
External
Scientists/
Researchers
External
Scientists/
Researchers
External
Scientists/
Researchers
Regulatory
bodies/industry
experts
Regulatory
bodies/industry
experts
Regulatory
bodies/industry
experts
Regulatory
bodies/industry
experts
Type of participation
Use existing
routines to
assess risks
and possible
reduction
measures
Maximise the
scientific
knowledge of
the risk and
mitigation
options
Involve all
affected
stakeholders to
collectively
decide best
way forward
Societal debate
about the risk
and its
underlying
implications
Dominant risk
characteristic
Simple
Complexity
Uncertainty
Ambiguity
Actors
As the dominant characteristic changes, so also
will the type of stakeholder involvement need to change
After Bunting (2007). An introduction to the IRGC Risk Governance Framework
Workshop

The development of London 2012 Olympic Games in East London is a project
twice the size of Heathrow’s new Terminal 5 to be delivered in half the time.

The biggest construction site in Europe creating thousands of new jobs with a
peak site workforce of 9,000.

Transforming previously contaminated land into 110ha of new open space in a
benchmark 21st century urban environment and 4,000 new homes.

More than 30 new bridges, 20km of roads and 8kmTens of kilometres of new
utilities networks providing electricity, heat, water, sewerage and gas to the
legacy communities
From this….
To this by 2012….