ABSTRACT
The increasing demand for comfort air-conditioning
has brought with in the need for greater numbers of practical,
technical & sales personal who have should training
in basic principles and applications of modern air-conditioning.
The technical information presented in this work is intended
to satisfy the immediate and fundamental concepts
in this work is intended to satisfy the immediate and fundamental
concepts and relevant principles in the field of air-conditioning.
The subject of air-conditioning has come
to stay with the universities in the country.
The industries and commercial establishment are experiencing
the need of air-conditioning as an instrument and commercial
establishment are experiencing the need of air-conditioning
as in instrument of efficiency and increased output rather
than of comfort alone.
The practice of air-conditioning is making rapid strides
and its increase practical use has brought in new problems,
which is required to be tackled by scientific research.
As a thumb rule practice in air-conditioning do not lead to thorough
understanding or correct solution of new problems.
The project material has been prepared to help
to meet this by providing the fundamental process and procedures.
For the completion of this project an easy and simple
methodology is adapted by preparing a met lab program to
generalize and making it simple for any multistory building
cooling/heating load estimation. For estimation
,first work sheets are prepared for different existing conditions.
Then by using this program the total cooling/heating load
for the entire complex has been easily calculated .
CHAPTER-1
(Introduction)
1. Definition of Air Conditioning:
Air conditioning is defined as the "the process of treating air so as to
control simultaneously temperature, humidity,
cleanliness and distribution to meet the requirements
of the conditioned space."
As indicated in the definition, the important actions involved
in the operation of Air conditioning systems are:
Temperature control - Room temperature is controlled to the pre
designed dry bulb temperature by cooling or heating room air.
Humidity control – Room air is controlled to
the pre designed relative humidity by humidifying or
dehumidifying the room air.
Air filtering, cleaning and purification – Room air is cleaned
by removing dust and dirt from the air.
Air movement and circulation – Air which is controlled
in temperature and humidity and cleaned is distributed
evenly throughout in a room. As a result, room air
can be maintained evenly in temperature humidity conditions.
Temperature, humidity, cleanliness and distribution of air
are called "four elements of air conditioning". By controlling
these four elements, room air can be comfortably maintained
regardless of outdoor temperature. Should these four elements
can be replaced with the work of air conditioner, the room air is
drawn in the air conditioners, where dust and dirt are removed
from the air by the air filter (cleanness of air)
and it is sent to evaporator,
where temperature of the air is reduced by evaporation of the
refrigerant (temperature), and at the same time, humidity in the
air is removed as condensation (humidity). As a result, the air
distributed from the air conditioner is cool and crisp and can
be distributed throughout the room by the evaporator
fan (distribution of air system). Such works are
repeated so as to perform air conditioning.
1.1 COMFORTABLE AIR:
The heat and coldness that the men feel depend not only on
air temperature (dry bulb temperature), but also on humidity
and distribution of air.
In addition the general comfortable zone air conditions
are within the comfortable zone, the room air is not always optimum.
For example, if temperature differs between indoor
and outdoor is nearly 10oC because room air controlled so as
to be within this is my computer zone, one feels coolness
and heat strongly when he enters in and out of a room,
which makes him feel uncomfortable.
Such uncomfortable ness is called "cold shock" consequently,
it is important to control room air temperature so as not
to feel "clock shock" during cooling by adjusting the thermostat.
The optimum temperature difference between indoor
and outdoor is from 3 to 6oC in consideration with health and economy.
1.2. NEED OF ACCURATE HEAT LOAD ESTIMATION:
The primary function of air-conditioning is to maintain conditions that are:
Conductive to human comfort.
Required by a product, or process within space.
To perform this function, equipment of the proper capacity
must be installed and controlled throughout the year.
The equipment capacity is determined by the actual
instantaneous speak load requirement; type of
control is determined by the conditions to be maintained
during peak and partial load. Generally,
it is impossible to measure either the actual peak or
the partial in any given space; these loads must be estimated.
CHAPTER-2
(Cooling and Heating Load Considerations)
2: PRELIMINARY CONSIDERATIONS:
The importance of accurate load calculations for airconditioning design and selection of equipment can never
be overemphasized. In fact, it is on the precision and care
exercised by the designer in the calculations of the cooling
load for summer and the heating load for winter that a
trouble-free successful operation of an air-conditioning plant
after installation would depend.
An important consideration in this exercise is the date and
time for which these calculations are made. The date would
depend on the local climatic conditions. Although the longest
day in summer is June 21, hottest and most humid day may
occur in July. Similarly, the coldest day may occur in
January or even February instead of on December 21.
Again, though the maximum temperature may occur outside
at 1or 2 p.m. the maximum heat gain of the room may occur
at 3 or 4 p.m. due to the direct solar radiation through glass
on the west side, or even later due to the time lag for the heat
transfer through the structure.
Further, the application for which the building is intended to
be used would also govern the choice of time. For example,
for an office building in winter that is not used at night, the
time for load calculations may be taken during the early hours
of the morning, although the maximum heating load may
occur at night. Similarly, an office building in summer may
have the maximum cooling load at 7 p.m. due to the time lag,
but since no occupants would be present at that time, the
time for load calculations may be taken as 4 or 5 p.m.
The major components of load in buildings are due to the direct
solar radiation through the west glass, transmission through the
building fabric or structure and fresh air for ventilation. In the case
of applications such as theatres and auditoriums, the occupancy
load is predominant.
A detailed discussion of the solar radiation incident on a surface
and its transmission through glass has been given in the
literature1.
Further, in literature2, we have studied the methods of calculating
heat transmission and infiltration through structures. These form
the components of load on the building from the external
environment. The internal and system heat gains or losses also
form the major components of other loads.
In this chapter, the methods for the evaluation of the above
mentioned and other individual loads are first presented, followed
by a summary of all loads at the end along with an example and a
calculation sheet illustrating the procedure that is followed by
practicing engineers. In the first instance here cooling load
estimation is given followed by that of the heating load.
2.1: INTERNAL HEAT GAINS: The sensible and latent heat gains
due to occupants, lights. appliances, machines, piping, etc., within
the conditional space. form the components of the internal heat
gains.
2-2: Occupancy Load
The occupants in a conditioned space give out heat at a metabolic
rate that more or less depends on their rate of working. The relative
proportion of the sensible and latent heats given out, however,
depends un the ambient dry bulb temperature. The lower the dry
bulb temperature, the greater the heat given out as sensible heat.
The values for restaurants include the heat given out by food as
well. It will be seen that the sensible heat (S) gain does not vary
much with activity, more and more heat being liberated as latent
heat (L) thus making up for total heat.
The usual problem in calculating the occupancy load lies in the
estimation of the exact number of people present.
Activity
W
Seated at rest
Office work
Standing
Eating in
restaurant
light work in
factory
Dancing
115
140
150
Table 2.1
:1 Heat liberated due to occupancy
Metabolic
Heat liberated , W
-----------------------------------------------------------------Rate
Room dry Bulb temp. Cº
-----------------------------------------------------------------20
22
24
26
_____________________________________________
S
L
S
L
S
L
S
L
90
25
80
35
75
40
65
50
100
40
90
50
80
40
70
70
105
45
95
55
82
68
72
78
160
110
50
100
60
85
75
75
85
235
265
130
140
105
125
115
125
120
140
100
105
135
160
80
90
155
175
2.3: Lighting Load
Electric lights generate a sensible heat equal to the amount of the
electric power consumed. Most of the energy is liberated as heat and
the rest as light which also eventually becomes heat after multiple
reflections.
Lighting manufacturers give some guidance as to the requirement of
power for different fittings to produce varying standards of illumination.
In connection with fluorescent tubes, it may be stated that the electric
power absorbed at the fitting is about 25 percent more than necessary
to produce the required lighting. Thus a 60 W tube will need 75 W at
the fitting. The excess of 15 W is liberated at the control gear of the
fitting.
As a rough calculation one may use the lighting load equal to 33.5
W/m2 to produce a lighting standard of 540 lumens/m2 in an office
space.
After the wattage is known, the calculation of the heat gain is done as
follows:
Fluorescent: Q = Total watts × 1.25
Incandescent: Q = Total watts
2.4: Appliances Load
Most appliances contribute both sensible and latent heats. The latent
heat produced depends on the function the appliances perform, such
as drying, cooking, etc. Gas appliances produce additional moisture
as a product of combustion. Such loads can be considerably reduced
by providing properly designed hoods with a positive exhaust system
or suction over the appliances.
Electric motors contribution sensible heat to the conditioned space. A
part of the power input is directly converted into heat due to the
inefficiency of the motor and is dissipated through the frame of the
motor. This power is
Power (W) = (Input) (I -motor efficiency)
The rest of the power input is utilized by the driven mechanism for
doing work which may or may not result in a heat gain to the space.
These
depend on whether the energy input goes to the conditioned space
or outside it.
Table 2:2 Appliance load, W
Appliance
sensible
latent
Coffee brewer 0.5 gal
265
65
Warmer 0.5 gal
71
27
Egg boiler
353
235
Food warmer /m² of plate
1150
1150
Griddle frying with frying
top of 46 cm *36 cm
912
500
Toaster, 360 slices / h
1500
382
total
329
98
60
2300
1412
1882
2.5: Piping, Tanks, Evaporation of Water from a Free Surface and Steam
Heat is added to the conditioned space from running pipes carrying hot
fluids due to heat transfer. On the other hand, cold pipes take away heat
from the space. Open tanks containing warm water contribute both sensible
heat and latent heat to the space due to evaporation.
This can be calculated by knowing the rate of evaporation and energy
balance.
In industrial air conditioning, products have often to be dried. This
involves the sensible heat gain to the space from the hot surfaces of the
dryer and the latent heat gain depending upon the drying rate. For these
calculations, knowledge of the heat and mass transfer coefficients is
essential.
When steam is entering the conditioned space, the sensible heat gain is very
little. It is equal to only the difference in the enthalpy of steam at the steam
temperature and the enthalpy of water vapour at the room dry-bulb
temperature. The main load is in the form of the latent heat gain. Thus
SHG = (kg/s) (tstcam- ti)(1.88)kW
(2.1)
LHG = (kg/s) (2500) kW
(2.2)
2.6: Product Load
In the case of cold storages. the enclosures are insulated
with at least 10 - 15 cm of thermocole and are almost
completely sealed. Thus, many of the loads present in
buildings for comfort air conditioning are either absent or
lessened in the case of cold storages. However, in
addition to the heat removed from products at the time of
initial loading, there is also the heat produced by the
commodities during storage. This heat of respiration
forms a sizable product load even at a storage
temperature of 0'C.
At higher temperatures, it is more. The approximate rate
of evolution of heat by various products at different
temperatures.
Table 2.3: Heat of respiration of products in J/kg per 24 hours
Product
storage Temp.
----------------------------------------------------------------------0 Cº
4.4 Cº
15.6 Cº
Apples
312-1560
625-2810
2390-8215
Bananas
Cabbage
1248
1770
4265
Carrots
2183
3640
8420
Cauliflower
4680
10500
Cherries
1352-1871
11440-13725
Cucumbers
2290-6860
Grape fruit
416-1040
730-1350
2290-4160
Grapes, American
624
1250
3640
Grapes, European
312-416
2290-2705
Lemons
520-936
625-1975
2390-5200
Melons
1350
2080
8840
Mushrooms
6446
Onions
728-1144
830
2495
Oranges
416-1040
1350-1665
3850-5405
Peaches
936-1456
Pears
728-936
9150-13725
Peas
8526-8733
13520-16635
40860-46265
Plums
416-728
935-1560
2495-2910
Potatoes, immature
2705
3015-7070
Potatoes, mature
1350-1870
1560-2705
Strawberries
2807-3950
3745-7070
16220-21105
Tomatoes, green
625
1145
6445
Tomatoes, ripe
1040
1350
5820
Turnips
1975
2290
5510
2.7: Process load:
The procedure of calculating the cooling and heating load
for various industrial air-conditioning processes is specific
for each process. The requirements for the process may
involve the control of one or more of the following factors:
Regain of moisture content by hygroscopic materials, such
as cotton. silk, tobacco, etc., and the accompanying heat
liberated.
Drying
load.
Rate of chemical and biochemical reactions.
Rate of crystallization, freezing, freeze-drying, etc.
Sensible cooling load.
For details of these loads, one may refer to the ASHRAE
Handbook
2.8: SYSTEM HEAT GAINS
The system heat gain is the heat gain (or loss) of an air-conditioning system
comprising its components, viz., ducts, piping, air-conditioning fan, pumps, etc.
This heat gain is to be initially estimated and included in the total heat load for
the air-conditioning plant. The same should be checked after the whole plant
has been designed
2.9: Supply Air Duct Heat Gain and Leakage
Loss
The supply air normally has a temperature of 10 to 15°C. The duct may pass
through an unconditioned space having an ambient temperature of 40°C. This
results in a significant heat gain till the air reaches the conditioned space even
though the duct may be insulated.
The heat gain can be calculated using the following expression
Q = UA (ta- ts)
(2.3)
Where U is the overall heat-transfer coefficient and A is the surface area of
the duct system exposed to the ambient temperature ta.
As a rough estimate. a value of the order of 5 percent of the room sensible
heat may be added to the total sensible heat if the whole supply duct is
outside the conditioned space, and proportionately less if some of it is within
the conditioned space.
It has been found that duct leakages are of the order of
5 to 30 percent depending on the workmanship. Air
leakages from supply ducts result in a serious loss of the
cooling capacity unless the leakages take place within
the conditioned space.
If all ducts are outside the conditioned space, a 10
percent leakage is to be assumed which should be
considered as a complete loss. When only a part of the
supply duct is outside the conditioned space, then only
the leakage loss of this portion is to be included.
The fraction of 10 percent to be added in such a case is
equal to the ratio of the length outside the conditioned
space to the total length of the supply duct.
2.10: Heat Gain from Air-Conditioning Fan:
The heat equivalent of an air-conditioning fan horsepower is added as the
sensible heat to the system. If the fan motor is outside the air stream, the
energy lost due to the inefficiency of the motor is not added to the air. There
are two types of air supply systems.
1-Draw-through system
In the draw-through system, the fan is drawing air through the cooling coil
and supplying it to the conditioned space. This is the most common system.
In this system, the fan heat is in addition to the supply air heat gain. The
heat should therefore be added to the room sensible heat.
2-Blow-through system
In the blow-through system, fan blows air through the cooling coil before
being supplied to the conditioned space. In this system, the fan heat is
added after the room to the return air. Thus the fan heat is a load on the
cooling coil. The heat should therefore be added to the grand total heat.
The fan efficiencies are of the order of 70 percent for central air
conditioning plant fans and about 50 percent for package air-conditioner
fans.
The fan horsepower depends on the quantity of air supplied and the
pressure rise. The supply air quantity in turn depends on the dehumidified
rise, which is of the order
of 8 to 14°C. The fan total pressure depends on the
system pressure loss which comprises the pressure
drop through the duct-work, grilles, filters, cooling, etc.
Once the supply air-rate and pressure developed are
known, the fan power can be calculated. But these
cannot be known until the load calculations have been
completed. Hence the procedure is to initially assume
fan heat between 2.5 and 7.5 percent of the room
sensible heat and check the value after the design has
been completed
2.11: Return Air Duct Heat and Leakage Gain:
The calculation of the heat gain for return air
ducts is done in exactly the same way as for
supply air ducts. But the leakage in this case is
that of the hot and humid outside air into the duct
because of suction within the duct. If the ducts
are outside the conditioned space, an in leakage
up to 3 per cent may be assumed depending on
the length of the duct. If there is only a short
connection between the conditioning equipment
and the space, this leakage may be neglected
2.12: Heat Gain from Dehumidifier Pump and Piping:
The horsepower required to pump water through the dehumidifier
adds heat to the system and is to be considered like that of other
electric motors.
For this purpose pump efficiencies may be assumed as 50 percent
for small pumps and 70 percent for large pumps.
The heat gain of dehumidifier piping may be calculated as a
percentage of the grand total heat as follows:
(i) Very little external piping: 1 % of GTH
(ii) Average external piping: 20% of GTH
(iii) Extensive external piping: 4% of GTH.
Note: Percent Addition to Grand Total Heat: It is to be noted that all
heat gains after the room are not to be added to room heat gains but
to the grand total heat load that directly falls on the conditioning
equipment. These include the return air duct heat
and leakage gain, dehumidifier pump power, dehumidifier
and piping losses, as out- lined above and the fan
sensible heat in the case of the blow-through system.
2.13: Safety Factor
Safety factor is strictly a factor of probable error, in the
estimation of the load. For the purpose, additional 5
percent heat should be added to the room sensible and
latent heats.
CHAPTRER-3
(BUILDING SURVEY)
Introduction
Abha, the city in kingdom of Saudi Arabia is situated at
18.23 N latitude and 42.65 E longitudes in the south west of the
kingdom.
Its height from sea level is 1,500 meter. Here the weather
condition is very good. The average temp. round the year is
about 26 ºC.So throughout the year, it is very comfortable. But
due to global change in weather condition the weather is
becoming sour and hot .For human comfort we need to aircondition our residential and commercial places. For the airconditioning we have selected the workshop complex of
Mechanical Engg. Department of KKU, ABHA.
3. BUILDING SURVEY:
An accurate survey of the load components of the space to
be air-conditioned is a basic requirement for a realistic
estimate of cooling and heating loads. The completeness
and accuracy of this is my computer survey is the very
foundation of the estimate, and its importance cannot be
overemphasized. Mechanical and architectural drawings,
complete field sketches and in some cases, photographs
of import aspects are part of a good survey. The following
physical aspects must be considered.
3.1:Orientation of building – Location of the space to nbr air conditioned with
respect to:
Compass points – sun and wind effects.
Nearby permanent structures – shading effects.
Reflective surfaces – water, sand, parking lots etc.
3.2:Use of space (s) – Office, hospital, department store, specialty shop,
machine shop, factory, assembly plant etc.
3.3:Physical dimensions of space (S) Length, width and height.
3.4:Ceiling height – Floor to floor height, floor to ceiling, clearance between
suspended ceiling and beams.
3.5:Columns and beams – Size depth also knee braces.
3.6:Construction materials – Materials and thickness of walls, roof, ceiling,
floors and partitions and their relative position in the structure.
Surrounding conditions – Exterior color of walls and roof, shaded by adjacent
building or sunlit. Attic spaces – invented or vented. Surrounding space
conditioned or unconditioned – temperature of non – conditioned adjacent
spaces such as furnace or boiler room and kitchens, floor on ground, crawl
spaces, and basement.
3.7:Windows – Size and location wood or metal sash, single or
double hung. Type of glass – single or multipane. Type of shading
device. Dimensions of reveals and overhangs.
3.8:Doors – Location, type, size and frequency of use.
3.9:Stairways, elevators and escalators – Location, temperature
of space if open to unconditioned area. Horse power of machinery,
ventilated or not.
3.10:People – Number, duration of occupancy, nature of activity, any
special concentration at time, it is required to estimate the number of
people on the basis of square feet per person, or on average traffic.
3.11:Lighting – Wattage at peak. Type – incandescent, fluorescent,
recessed, exposed. If the lights are recessed, the type of airflow over the
lights, exhaust, return or supply, should be anticipated. At time, it is required
to estimate the wattage on a basis of watts per sq. due to lack of exact
information.
3.12:Motors – Location, nameplate and brake horsepower and usage. The
latter is of great significance and should be carefully evaluated. The power
input to electric motors is not necessarily equal to the rated horsepower
divided by the motor efficiency. Frequently these motors may be operating
under a continuous overload, or may be operating at less than rated capacity.
It is always advisable to measure the power input whenever possible. This is
my computer is especially important in estimates for industrial installations
where the motor machine load is normally major portion of the cooling load.
3.13:Appliance, business machines, electronic equipment – Location,
rated wattage, steam or gas consumption, exhaust air quantity installed or
required and usage. Avoid pyramiding the head gains from various
appliances and business machines. For examples, a toaster or a waffle iron
may not be used during the evening, or the fry kettle may not be used during
moming, or not all business machines in a given space may be used at the
same time.
3.14:Ventilation – CFM per person, CFM per Esq. ft. Scheduled
ventilation (agreement with purchaser) Excessive smoking, floor
orders, code requirement. Exhaust fan-type, size, speed, and CFM
delivery.
3.15:Thermal storage – includes system operating schedule (12,
16 or 24 hours per ay. Specifically during peak out door conditions,
permissible temperature swing in space during a design day, rugs
on floor.
3.16:Continuous or intermittent operation – Whether system be
required to operate every business day during cooling season, or
only occasionally, such as churches and ballrooms. If intermittent
operation, determine duration of time available for precooling or pull
down.
CHAPTER-4
(DESIGN CONDITIONS)
4. DESIGN CONDITIONS:
Since the need of air conditioning is primarily a function of
our body's reaction to the climate, we will begin our study
of load estimating by looking at outdoor and indoor design
conditions. Establishing these conditions for a specific
application, locality, and time will fix the magnitude of
head gain or loss essentially establishes the potential for
head to flow and can be equated to establish the voltage
for an electrical circuit.
4.1:OUTDOOR DESIGN CONDITIONS:
There are several sources of data that can be secured to establish outdoor
design. Three common ones are.
ASHRAE Handbook of Fundamentals.
Engineering Weather Data.
Carrier System Design Manual.
Each source contains data based on average weather conditions available at the
time of publication.
It is commonly acknowledged that ASHRAE has come to be regarded as the
industry standard when it comes to outside design data for abha. ASHRAE data
is based on detailed records from official weather stations of the abha. Weather
Bureau, abha.
To illustrate the outdoor design data is taken from carrier system design manual.
New Delhi will be used to illustrate the values published.
4.2:USE OF OUTDOORS DESIGN CONDITIONS
Summer design condition in ABHA(KINDOM OF SAUDI ARABIA)
34oC Summer DB
21oC Summer WB
12oC Daily Range
4.3:INSIDE DESIGN CONDITIONS:
The human body considers itself comfortable it can maintain an
average body temperature between 360C and 37.70C. To accomplish
this is my computer body exchanges heat with its environment by
evaporating body fluids and
exchanging heat thru stable body temperature, and the mind
perceives itself as comfortable when body temperature can
easily maintained. It becomes the task of air-conditioning to
maintain the environment around the body within this is my
computer comfort zone of conditions.
The following variables, all of which affect the ability of body
to exchange heat with surrounding and perceive itself
comfortable.
Surrounding Dry Bulb Temperature
Surrounding Relative Humidity
Surrounding Mean Radiant Temperature
Surrounding Air Velocity
4.4: DESIGN CONDITIONS
At this point we have sufficient information to complete the
design portion of the calculation sheet form for our
workshop complex building in the department of
Mechanical Engineering ,KKU ,Abha . Assuming we are
going to do a block load for our selected building for May
at 4 P.M. the outdoor design conditions from table 1 has
been determined to 340C DB and 21oC WB. Plotting this
point on the psychometric chart results in finding a
corresponding 74 GR/LB moisture content of the air.
Considering the ASHRAE comfort zone, let's pick inside
design conditions of 22 oC DB and 50% RH (relative
humidity). The difference between outdoor air DB of 34oC
and room (indoor) DB of 22oC IS 12oC. This indicates for
each CFM of outdoor air entering the building for
ventilation purposes, the OA must be cooled 12oC.
4.5:LOAD COMPONENTS:
The load components are one of the two general types:
Sensible
Latent
4.5.1:A Sensible Load result when heat entering the conditioned space causes
a dry bulb temperature increase.
4.5.2: A Latent Load result when moisture entering the space causes the
humidity to increase. A load component may be all sensible, all latent or a
combination of two.
Additionally load components can be classified into one of the following three
categories.
SKIN LOAD
INTERNAL LOADS
OTHER LOADS
Skin loads originate from heat sources outside or external to the conditioned
space. Internal loads have their sources within the space itself. Other Loads
occur from head gains or losses associated with moving cool fluids to and from
the conditioned Space design conditions.
4.5.3:SKIN LOADS:
4.6:SOLAR GAIN THRU GLASS:
The sun rays pass through the glass windows as radiant
energy and are absorbed within the space. Solar head gain
typically reduced by the space. Solar heat fain is typically
reduced by the use of internal or external-shadin g devices,
reveals, overhangs or shadows cost by adjacent buildings.
4.6.1:SOLAR AND TRANSMISSION GAIN THRU WALLS
AND ROOF:
Heat is caused to flow through external wall and roofs by
two sources:
Sun rays striking the external surfaces.
The high outdoor air temperatures.
4.6.2:TRANSMISSION THRU GLASS, PARTITIONS,
CEILING AND FLOORS:
When an adjacent area is at a temperature higher than the
space to be air conditioned, heat will flow through windows,
ceilings, partitions, or floors by means of transmission.
4.6.3:INFILTERATION:
Wind blowing against the side of building causes the
outdoor air, which is higher in temperature and moisture
content, to infiltrate thru the cracks around doors and
windows. This results in localized sensible and latent heat
gains.
4.6.4;VENTILATION:
Should ventilation air for odor removal be introduced directly
into the space, it will appear as load in the space. It could be
considered as forced infiltration and would result in localized
sensible and latent heat gain.
4.7:INTERNAL LOADS:
4.7.1:PEOPLE:
The human body through metabolism generates
heat within itself and releases it by radiation,
convection, evaporation from the surface, and by
convection and evaporation in the respiratory tract.
The amount of eat generated and released depends
on surrounding temperatures and the activity level
of the person. Both sensible and latent heat loads
will enter the space.
4.7.2:LIGHTS:
Illuminates convert electrical power into light and
sensible heat. Lighting is either fluorescent or
incandescent.
4.7.2:LIGHTS:
Illuminates convert electrical power into light and sensible
heat. Lighting is either fluorescent or incandescent.
4.7.3:EQUIPMENT:
Within the conditioned spaced powered equipment can
produce localized sensible and / or latent loads. Such
devices would include calculators, computers, motors,
popes, tanks, or product from a process.
4.7.4:ROOM LOADS:
The room includes the entire space inside the building.
Adding all the sensible loads together results in the room
sensible heat gain (RSH). Similarly, the sum of all the latent
heat gain (RLH). Finally the sum of RSH and RLH is the
room total (RTH).
4.8:OTHER LOADS – SUPPLY AIR SIDE:
If there was no heat gained or lost between the coil of the air
handling unit and supply air terminal, the temperature of the
air leaving the coil would be the same as that of the air
entering the room. In a real system the following losses
exists.
4.8.1:SUPPLY DUCT HEAT GAIN:
Should be supply air duct pass thru a space whose
temperature is higher than that of the air being transmitted, a
sensible heat gain will be experienced.
4.8.2:SUPPLY DUCT LEACKAGE LOSS:
The supply air is transmitted under to the room. Depending
on the quantity of ductwork installation, leaks at the joints will
exits to some degree resulting in a loss of sensible as well as
latent capacity.
4.8.3:SUPPLY AIR HEAT:
In air handling units whose fan is located downstream of the coil, the
does the work on the air resulting in a sensible heat gain to supply air.
In addition the motor losses could show up on the supply air of the
motor is located on the air stream.
4.9:BYPASSED OUTDOOR AIR:
Because the coil is not a perfect device, a position of the entering air
passes through the coil completely unaltered in temperature or
humidity, resulting in a sensible and latent loss of supply air.
4.10: EFFECTIVE LOADS:
Adding the supply air sensible losses to the RSH results in air load
laving the coil referred to as effective room sensible heat (ERSH). In
similar manner latent losses of the supply air plus RLH results in
effective room latent heat by the coil. These loads are referred to as
effective since both the coil leaving air temperature and humidity level
must effectively be lower than conditions required at the room on order
to:
Absorb the losses along the way and
Absorb the room loads
4.11: EQUIVALENT TEMPERATURE DIFFERENCE:
Heat flow though an exterior wall is due to the combined effect of two
heat sources:
Sun's rays striking the wall resulting in solar insert gain.
Outside air temperature higher than the inside temperature resulting in
transmission thru the wall.
Since the wall has mass, the storage, affect of wall makes the flow of
heat through it time related. Determination of actual amount of eats
entering the space is therefore a rather complex calculation. To get a look
for the movement of heat thru wall under these circumstances a look at
time related temperature profiles across a wall is beneficial. Assume air
temp. on both sides of a walls maintained at 23.88oC. With no sun
shining on the wall temp thru wall is constant. As sun shines on wall,
radiant energy is converted to heat at surface to outdoor air and into wall.
With time the surface temp. rises as well as temp in the wall, as heat
flows into wall and then on to the interior.
With continued sun shining on the wall, a steady state heat
flow situation will occur where amount of energy striking the
surface equals the amount of heat given off to outdoor air
plus the amount of heat entering the interior. When sun
cease to shine on the wall, stored energy in wall continues to
flow to the outside and inside until temp. Throughout the wall
equalizes. Whether the sun is shining on the wall heat is
always flowing in two directions. Transmission heat flow thru
wall behaves in a manner similar to solar flow of heat. As the
outdoor temperature rises-causing heat to flow into wall. If
outdoors temp. remained at 34oC for a long time a steady
state heat transfer condition would exist. Under this condition
heat entering the indoor space would define by equation:
Q = U*A* (Temperature Difference)
Should the outdoor air temp. fall quickly,
energy stored in wall quickly flow outward in
both directions . Under these conditions the
flow of heat is no longer steady state and
above equation no longer applies. Since the
solar intensity striking the outside air
temperature is continually changing, simple
heat transmission equation cannot be used.
The equivalent temperature difference is a
factious number used to describe the flow of
heat thru the wall at a given point in time.
4.12: INFILTRATION, VENTILATION AND EXHAUST:
Infiltration is leakage of untreated outdoor air through porous exterior
walls, floors, roofs etc. the amount of leakage is not controllable by the
occupants in the building, and can results in rather large heat gains or
losses.
The rate of which the leakage takes place is dependent upon the
pressure differential across the exterior surface. The pressure difference
is in turn caused by wind velocity, difference in air density, or
pressurization caused by mechanical supply and exhaust systems.
Due to the tremendous variability in building geometry, wind patterns,
and construction quality, accurate evaluation becomes the task of the
designer to use his educated judgment based on the information
available to provide for this potential load source.
The following text provides a partial in sight into this phenomenon,
however, further research by the reader is necessary to properly
evaluate infiltration-particularly in tall building (i.e. those over 30 m high).
4.13:VENTILATION:
The introduction of outdoor air for ventilation of conditioned
spaces is necessary to dilute odors given off by people,
smoking, or other internal air contaminants. Local codes
usually determine the minimum amount of ventilation
required, and may be specified either as CFM / person or
CFM/Ft2 of net floor area.
It is customary to minimize the amount of outdoor air
introduced into the space since this can result in a
substantial heating or cooling load. With high-energy costs
this can translate into significant operating costs. The
people density of the building is 50 sq. ft. / person/ as we
know that 15 CFM / Person is a good minimum ventilation
rate. Thus the building requires.
4.14:EXHAUST:
Codes require that some odour producing areas in a building
must be positively exhausted. Such area would be toilets or
kitchen hoods over grilles. This does not mean that extra
outdoor air must be supplied for the purpose of exhausting.
Room air in most cases is perfectly satisfaction for exhaust
requirements.
4.15:AIR CHANGE:
As the example building is a shopping complex application,
therefore 1 air change is given in order to maintain the proper
air composition in the conditioned space.
4.16: INTERNAL HEAT GAIN:
Within the conditioned space people, lights, generate sensible
loads, powered equipment, and appliances. Internal latent
load sources are recorded further down the load calculation
sheet .
4.16.1:PEOPLE:
Heat is generated within the human body by
oxidation – commonly called metabolic rate. This
heat is carried to the surface of the body and
dissipated by:
Radiation from the body to the surrounding colder
surfaces.
Convection from the body and respiratory tract to
the surrounding air.
Evaporation of moisture from the body surface and
in the surrounding air.
from the carrier system design manual shows
average dissipation of Sensible and latent heat
from people at different level of activity.
4.16.2:LIGHTS:
Lights generate sensible heat by the conversion of electrical power into
light and heat. The heat is then dissipated by radiation to the surrounding
surfaces, by Conduction into adjacent materials, and by convection to the
surrounding air. Lights are typically specified as lamp watts/ Ft2 of floor
area.
Incandescent lights convert approximately 10% of the power input into
light. The rest appears as heat within the bulb. The heat then makes its
way into the space 80% by radiation and 10% by conduction and
convection florescent lights are more commonly used in commercial
buildings. About 20% of the input power(E) is converted to light by
florescent bulbs – thus they are more efficient than incandescent lights.
20% of the power input (E) is dissipated by convection and conduction to
the space. Additionally, 20% of the input power is generated as heat in the
ballast of the lamps. The above values very from manufacturer to
manufacturer and more efficient lights significantly reduce the ballast loss.
Generally, however, the following equations are used to give a good
approximation of the heat gain to the space.
HEAT GAIN TO THE SPACE:TYPE:
RATED LAMP WATTS x 1.25 X 3.413 BTUH / WATTFLORESCENT:
RATED LAMP WATTS X 3.143 BTUH / WATTINCANDESCENT:
1.25 ACCOUNTS FOR BALLAST HEAT GAIN
4.16.3:STORED EVERGY FROM LIGHTS:
The radiant energy from lights has the potential to be
stored in the mass of the building and appear as a load
later in the space. This is the same process that occurs
with solar radiant energy.
It is normal practice to neglect the storage impact when
calculating the space load due to lights. Most comfort
applications result in less than 2% reduction in the load,
and therefore, storage is neglected. The basic reason
behind this practice is as follows:
Carpeting is widely used. The primary target for radiant
energy from the lights is the floor. Carpet insulates the
floor from the radiant light rays. The radiant energy strikes
the carpet and is converted into heat. The heat is then
dissipated almost immediately into the space. Only a small
portion of the energy is stored in the floor.
Unless the air conditioning equipment is run for an hour or two before
the light are turned on, the mass of the building will already be
saturated with stored heat from the night before, therefore, as light
heat is observed in the mass, the equivalent amount of energy is
almost simultaneously released to the space:
In order to see a significant reduction in heat of lights due to storage
the following Condition should be present.
The air conditioning equipment should be run longer then 12 hours per
day to remove solar energy from the mass of the building, and also
reduce or eliminate morning pull down loads.
The lights should be turned on 1 (preferably 2) hours after the air
conditioning equipment in the morning. Determining the storage
impact can be done by the use of tables 12 in the carrier system
design manual.
4.17:BYPASSED OUTDOOR AIR:
Since the cooling coil is not a perfect heat exchanger device, some of
the air entering the coil passes through the coil untreated. This
represents a loss air leaving the coil must overcome before entering the
room. It is a load equivalent to an infiltration load in the room, and is
calculated in that manner. The percentage of air (expressed as a
decimal) that passes through the coil untreated is referred to as the
bypass factor and is typically figured at 0.5. it is really a function of the
type of the coil and equipment used. A more accurate value can be
assigned, as the designer becomes more familiar with cooling coil used
in air conditioning equipment.
4.18:EFFECTIVE ROOM SENSIBLE HEAT (ERSH):
Adding the supply duct sensible losses to the room sensible
heat (RSH) results in a load known as the effective room
sensible heat (ERSH). This load is used in determining the
CFM of air required across the cooling coil the air must be
effectively higher than the normal quantity to absorb the
room load and the losses encountered along the way from
the cooling coil to the room.
4.19: LATENT LOADS:
The latent counterparts of infiltration, internal loads are
now calculated order to determine the room latent heat
(RLH) and effective room latent heat (ERLH). Vapor
transmission is one new load source encountered.
4.20:VAPOUR TRANSMISSION:
Water vapor flows thru building structures, resulting in a
latent load whenever a vapor pressure difference exists
across the structure. The latent load from this source is
usually insignificant in comfort application and need be
considered only in low or high dew point applications.
Water vapor flows from high to lower vapor pressure at rate determined by the
permeability of the structure. Further details on this subject can be found in the
carrier system design manual.
For the air conditioning the available plan of the workshop complex building of
Mechanical Engineering,KKU,ABHA,KINDOM OF SAUDI ARABIA has been
selected for cooling load calculation .The plan of the complex as shown in
fig.1.The other details for the building are taken as below.
Building located at 18.2o N Latitude, the following data are given
=1.25 cm
Plaster on inside wall
Out side wall construction=20 cm concrete block
=10 cm brick veneer
=33 cm brick Partion wall construction
=20 cm RCC slab with 4 cm asbestos cement board
Roof construction
=20 cm concrete Floor construction
=2000kg/ m Densties, brick
=1900kg/m
Concrete
=1885kg/m
Plaster
=520kg/m
Asbestos board
Fenestration (weather-stripped, =2mx1.5m glasses loose fit
U=5,9wm k
l
doors
1.5mx2 m wood panels
U=.63w m k
out door design condition
=34C DBT,22C WBT
Indoor design condtion
25 DBT, 50% RH
Daily rang
220C TO 34 ºC =12 ºC
=200
Occupancy
Light
15000 w fluorescent
4,000 w tungsten
Assume bypass factor of cooling coil =0.15
Find room sensible and latent heat load and also the grand total heat load .