Contents:
Overview of the mini-SONG project
mini-SONG telescopes
mini-SONG instruments
progress and project schedule
Overview of the mini-SONG project
Plan to setup on the 4 SONG sites in Northern Hemisphere
Consists of a 50-cm twin-telescope at each site
Scientific goals:
General multi-color survey of open clusters
Long term multi-color time-domain observations of selected cluster
fields
Superiority:
Global network groups
Long time baseline
High resolutions in frequency space
Multi-color photometry
mini-SONG telescopes
Structure:
twin telescope
Aperture:
50cm
Mount:
German EQ
Optical system:
Ritchey-Chrétien
Focal ratio:
F/3 primary; F/9.5 system
Focal length:
4753mm ± 25mm
FOV:
20' x 20'
Wavelength:
B or V for one telescope and R
for the other (covers Johnson, SDSS, Strömgren
systems)
Mirror material:
Astro Sitall
Coating:
Al+SiO2, Enhanced
Aluminum (SiO2/TiO2) Overcoat
Wave front accuracy: ≤1/8λ@633nm
mini-SONG telescopes cont.
RC Open Truss Carbon Tube
Precision Secondary Mirror Focuser
Conical Secondary Light Baffle
Lateral roller bearings support mirror cell
Active computer controlled cooling
“light weight” Dovetail Plates Dust Cover over primary
mirror
Focuser capacity: 8Kg
RC Field Flattener/Corrector
Direct Drive Mount
8" RMS pointing accuracy(Zenith distance <70 degree)
Open-loop tracking: 0.1" over 10sec and 0.35" over
300sec RMS
Slew speed: 10deg/s for both axes
mini-SONG telescopes cont.
Dome Design
Diameter 4m
Total height 2.9m
Total height when parked 2.5m
mini-SONG instruments
CCD:
Andor, DZ-936
Pixel size: 13.5μm
Active pixels: 2048x2048 (20'x20')
Filters
Size: 50mmx50mm
Thickness: 5mm
Positions on each wheel: 4
Progress and project schedule
2011.6 – Completed project review and evaluation
2011.7 – Completed detailed design, review and evaluation
2011.8~2011.10 – Key components order
2011.11~2012.6 – Telescope structure machining
2011.11~2012.12 – Control sys. development and debugging
2011.11~2012.12 – Software development and debugging
2012.07~2012.09 – Telescope assembly
2012.12 – Complete whole structure assembly, development of control
system/software/networking, etc.
2013.01~2013.04 – On-site installation and commissioning
2013.05 – Acceptance test
Problems
Sites: no confirmation/permission excepts Chinese site
Construction: finished preliminary design, need detailed
site info to complete final construction design