The Problem
 Transmission Network planned operational changes must be
submitted, evaluated for regional reliability, approved or rejected, and
put into service through a managed process between an ERCOT and
member T&D Companies or other transmission service providers
 The existing processes are not fully automated and, therefore, labor
intensive and time consuming.
 Lack of uniform, automated electronic coordination also provides
opportunities for data errors in model changes through data translation
between applications and companies.
 Model inconsistencies between or within organizations cause
inaccuracies in reliability evaluation
 Partially automated processes and inconsistent models cause a
significant direct negative bottom line impact.
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Page 2
The Solution:
Siemens – Network (Common) Model Management System
(NMMS)
 A single coordinated master data source providing capability to feed
mission critical Operations, Maintenance and Planning applications
 Provides integrated tools to efficiently coordinate the workflow followed
in managing transmission network changes for the ERCOT and TSO’s
 Electronic submittal of planned network model changes in a standard
format
 Supports automated process for electronic approval or rejection
 Integrated tools enable rapid modification and resubmission of rejected
plans
 Supports convenient secure electronic access to approved plans
 Provides for integrated managed coordination of TSO planned network
changes with operations for the development of commissioning plans
 Support Audit and Dispute Resolution
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Page 3
Siemens CMMS
Dynamic
Energy
Analysis
Reliability
Analysis
Approved
Plans:
Plan 1 T&D 1
Plan 2 T&D 1
Plan 1 T&D 2
……..
Plan m T&D n
Transfer
Limit
Analysis
Congestion
Analysis
Fault
Analysis
Planning Model
Approved
Plans
Market
Operations
Current
Operations
Model
Planned Change
Approval, Rejection
Settlement
Actual Network
Changes
Accurate External
Network Model
Current
Operations Model
Planning Model
EMS
Operating Model
Planned Network
Changes
T&D
Service Provider
Approved
Plans
CRR
Auction
Outage
Evaluation
As-built/
Archived
Models
Model day 1
Model day 2
Model day 3
……..
Model day n
Operating Model
Approved Planned
Network Changes
Reliability
Analysis
Transfer
Limit
Analysis
Operations
Planning
Page 4
Fault
Analysis
Congestion
Analysis
EMS
Load
Shadow
Management Settlement
Transmission
System Owners
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Model on Demand - MOD®
Built for Planners
 Data submitters can enter known in-
service or effective dates for each future
system expansion or improvement
project
TFO
Planning Personnel
Time Based
Operational Models
specific date into the future.
once and it is available for all case build
timeframes on or after the project’s
effective date.
Operations
Projects
OP
Proj
OP
Proj
OP
Proj
Operational
Model
Manager
OM
OM
Base
OM
OM
EMS
OM
System Data
Market Data
Time Based
Planning Models
Planning
Projects
OP
Proj
OP
Proj
OP
Proj
Planning
Model
Manager
OM
Case Builder
 The User needs to submit a project only
Project Tracker & Coordinator
(PTC)
 Enables user to build a model for any
 Users can Download case , project,
Operations Personnel
OM
Base
OM
OM
EMM
CRR
Export
OE/OS
Planning
Basecase
OM
profile, ….etc. Data from the application
 Receive activity Logs including case
Operations Personnel
ISO/RTO
Planning Personnel
create details.
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Page 5
Information Model Manager
 Quickly create and maintain an
accurate Power System Model
Operations Personnel
TFO
Planning Personnel
 Incrementally merge network model
modifications
 Fulfills NERC data exchange
requirements
 CIM-compliant data import and export
enables data migration from existing
data stores and exchange in standard
formats
 Automatically maintains an audit trail
 Data Reporting enables users to create
Planning Personnel
Operations Personnel
ISO/RTO
predefined or user-defined reports
 Graphical topology verification and
editing
 Performs initial validation on
connectivity, equipment uniqueness,
and basic constraints
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Time Based
Operational Models
OP
Proj
OP
Proj
OM
OM
Base
OM
OM
EMS
OM
System Data
Market Data
Time Based
Planning Models
Planning
Projects
OP
Proj
Page 6
OP
Proj
Operational
Model
Manager
OP
Proj
OP
Proj
Planning
Model
Manager
OM
OM
Base
OM
OM
OM
Case Builder
Project Tracker & Coordinator
(PTC)
Operations
Projects
EMM
CRR
Export
OE/OS
Planning
Basecase
Case Builder
Operational Model Case Builder
 Create cases and models for various
applications
Operations Personnel
TFO
 System-wide dissemination of data
exchange needs
 Utilizes supplemental data to create
cases (e.g. contingencies, outages,
market data)
 Each target system has a profile that
defines data to be consumed
 A back end API converts Operations
models to Planning models
Operations
Projects
OP
Proj
OP
Proj
OP
Proj
Operational
Model
Manager
OM
OM
Base
OM
OM
EMS
OM
System Data
Market Data
Time Based
Planning Models
Planning
Projects
OP
Proj
OP
Proj
Operations Personnel
OP
Proj
Planning
Model
Manager
ISO/RTO
OM
Case Builder
 Support internal and external data
Time Based
Operational Models
Project Tracker & Coordinator
(PTC)
modifications ensures a consistent
Power Systems Model for all
applications
Planning Personnel
OM
Base
OM
OM
EMM
CRR
Export
OE/OS
Planning
Basecase
OM
Planning Personnel
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Page 7
CMMS
Value Proposition/Benefits
 Significantly Reduced workload for ISO/RTO and T&D Planning and
Operations Staff
 Better control and accuracy of the Operating Model leading to
improved reliability management of the overall transmission network
(RTO and T&D)
 Improved Model accuracy leads to improved accuracy of congestion
management and resultant settlement financial solution by the RTO
 Improved Model provides accurate external network models for TFO
operations
 Provides a well synchronized method and tools to and initialization
planning models from the current operations model
© 2008 Siemens Power Transmissions & Distribution, Inc. All rights reserved
Page 8