Green Electricity

Download Report

Transcript Green Electricity

Confidential, Do Not Distribute
Innovation





The purpose of the program is to use the fluctuations in the
Earth and convert it to the Electric Energy.
Our technology will be capable to supply constantly electric
energy, with limited cost of maintenance.
No pollution
No costly maintenance
No costly initial setup
Confidential, Do Not Distribute
Description of the
Technology
We estimate : 10m² = 1KWatt
Our technology is allowing us to use a
very small space and still reach to
large amount of MWatt
The shell of the earth is rapidly fluctuate
(microns)
There are the materials that when you press on them,
potential difference is created, like quartz or composite.
With our technology we can convert these
fluctuations into the electric energy.
Confidential, Do Not Distribute
Why We?
Photo – Voltaic ROI is 6-10 years. After 7 years you have to
reinstall most of the silicon cells. Amount of sun hours is limited.
Cost of the installation is 1.5-2.5 million Euro for 1MgW/h.
Our Technology




Don’t have to reinstall any parts.
Amount of work hours is 24/7.
Cost of the installation up to 1.5M Euro for 1MgW/h.
(depends on structure and cost of the land)
ROI is SMALLER – up to 3 years.
Confidential, Do Not Distribute
Advantages
Our Technology
Initial Setup Low cost
Pollution NO
Maintenance Very Low
Stability High
Cost of operation Very Low
Photo Voltaic
Normal
Low Cost
High Cost
NO
HIGH
Each 7 years
Always
Medium
LOW
Medium
Very High
6-10 years
Very Long
Safety
ROI 3 years
Our technology contributes to improving the security of Europe's
energy supply
Confidential, Do Not Distribute
Program is in 4 Phases

Phase 1 – producing scheme – 1000 watt

Phase 2 – pilot version 100 Kwatt.

Phase 3 – production 1MgW.

Phase 4 – production 5-100 MgW.
Confidential, Do Not Distribute
Confidential, Do Not Distribute
Phase 1

Development of a laboratory prototype , producing and storing
energy: 1, 10, 100, 1000 WATTS.

Objective – Developing a basic scheme and producing and storing
electric energy.

Time : 1-2 years

Personal : 7 people.

Money needed : 1.5-3 Million Euros.
Confidential, Do Not Distribute
Phase 1 - Steps







Building laboratory, hiring people
Selecting the source of oscillations - electrical, mechanical,
hydraulic, magnetic ...
Selection of the principle of converting vibration - piezo, magnetic,
...
Selecting the connection method of the system
Selecting the method of accumulation of finished energy (batteries,
dry cells and so on)
Selecting materials for energy conversion, for example : natural
(quartz), artificial (composite)
Choosing the materials for energy transfer: metal,
semiconductor,…
Confidential, Do Not Distribute
Phase 1 – Steps

Development of a test design product for testing schemes (schemes).
 Selecting devices
 Choosing accessories
 Making drawings
 Manufacturing, assembly and choosing stand

Testing. Objective - to check the various circuit elements and their
interaction.

Finalization of the scheme for pilot.
Confidential, Do Not Distribute
Phase 2

Development of pilot plants for electric energy storage and
production: 10 - 100 kWatts.

Objective – Developing a pilot version and producing and storing
electric energy.

Time: Up to 1-2.5 years.

Personal: 8

Money needed: 1.5-3.5 Million Euros.
Confidential, Do Not Distribute
Phase 2 – Steps


Selecting the location :
 Collection of geophysical and geo-mechanical data.
 Collection of archaeological data.
Development of the design of the construction.
 Selection of the technological scheme.
 Selection of the control circuit.
 Selection of the basic equipment.
 Selection of the accessories.
 Selection of the devices.
 Creation of the drawings.
Confidential, Do Not Distribute
Phase 2 – Steps

Production Setup
 Manufacturing the parts of the installation.
 Building the installation, including the adaptation.
 Conducting pilot tests.
○ Objective – collection the data for development of a pilot
plant for energy storage and production : 1 - 100 MgW.
Confidential, Do Not Distribute
Phase 3 – Production

Production of 1 MgWatt
Phase 4 – Production

Production of 5-100 MgWatt
Confidential, Do Not Distribute
Status of the Project

Ready - Theoretical Model of working system
(Algorithms, Mathematics, Formulas, Sketches)
Algorithms
Formulas
Mathematics
Sketches
Confidential, Do Not Distribute
Team

Abramov Alex – Project Leader. 33 years old. Alex has an
extensive knowledge in project management and company
Business development. Alex now is managing director of Gazit
Technologies, a start up company that sold it’s product and now
acting as an outsourcing company in web development.
http://www.linkedin.com/in/enigmatec

Shamuilov Boris – PhD in Physics and Chemistry. 59 years old.
Boris has an extensive knowledge in R&D.
Boris has 25 patents registered on him and on the group that it was
developed.
Confidential, Do Not Distribute
Thank you
Contact us
Alex Abramov
Tel : +972 52 6408850
[email protected]
Confidential, Do Not Distribute