R&D status of the very front end ASIC
Tilecal week (7 October 2011)
François Vazeille
Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili
Status by June 2011
New results
Conclusion and next steps
1
2
Status by June 2011
The first chips in IBM 130 nm technology were made (CERN order)
then tested at Clermont-Ferrand
- First one: only a current conveyor.
- Second one: current conveyor + shaping stage.
With 3 different gains (1, 8, 64) for the two chips.
0.8 cm
1.7 cm
3
Chip 1
Chip 2
Main results
-
They work.
A good correlation between the 3 gains.
Dynamics fully effective.
Good agreement with simulations.
BUT:
- Large offset for the 3 gains: solved (due to a lay out problem).
- Oscillation problems length of wire bonding to the package:
cured by adding an external R-C.
- Linearity not well tested because the test bench generator is not enough precise.
- Pulse width not optimized with respect to Tilecal needs,
because of the cure of the oscillation problems (pulse tail).
New studies of integrator
- Needs of a very high gain and of a very small offset.
- A compromise choice could associate 2.7 V “analog” transistors
and 1.6 V transistors (low power) .
4
Next steps foreseen by June
□ Chip 2:
- Tests behind a PMT at Clermont-Ferrand using Laser pulses (Scheduled in July)
More realistic situation.
A first approach of the absolute scale/Chip design.
-Tests with cosmics at CERN inside a Tilecal module (Scheduled in September)
The most realistic detector using real particles.
A better approach of the absolute scale/Chip design.
A good learning exercise around a Tilecal module.
□ Integrator
- Simulations of the new design.
- Goal:
To reach the performances of the Chicago amplifier (discrete solution):
Gain of 50 000 and max offset < 1 mV.
5
New results
Chips 1 and 2
Identity names
Chip1 FATALIC 1
Chip 2 FATALIC 2
Front end for Atlas Tile cAL Integrated Circuit (IC for every Clermont chips)
Laser pulses at Clermont-Ferrand
(July)
- The first time behind a PMT and with light.
- Large uncertainty on the Laser amplitude
(10 to 20%).
But first check of the dynamical range
(in equivalent charge) for the 3 gains.
6
Cosmics at CERN (September): building 175.
7
D cell
Long cable
Super-drawer LBA65 #27
PMT # 1 Hvout = 678.5 V (setting: 678.0 V)
calibrated with Cesium.
LED signal: Oscillation
due to the 4 m long cable,
with a circuitry not suited to it.
8
Muon signals: first particle events seen by FATALIC2
~ One event every 2 minutes.
Choice of the high gain (64) saturation of many events above 500 mV
It was not the best choice !
9
- D cell 1 GeV muons (Claudio information) 50 pC
- Gain 64: 625 µA max or 12 pC
Saturation of many pulses.
Nevertheless,
these results do confirm the first approach of the requested scale:
- Gain 64: 625 µA or 12 pC max.
- Gain 8: 6.25 mA or 120 pC max.
- Gain 1: 62.5 mA or 1200 pC max.
10
New Integrator simulations of amplifier
Bode diagram:
Gain > 50 000
Output offset (gain = 1 000):
86 µV converted to input
(Monte carlo with 500 events)
Results fitting the goals (Chicago reference).
11
Conclusion and next steps
The chips have “seen” light: laser (Clermont-Ferrand)
and cosmic particles (CERN).
These tests put the chips in realistic environments,
besides, it was a good learning for everybody.
The absolute choices of the gains and ranges
are not far away the physical needs.
New steps are scheduled.
12
New foundry order on November 7th FATALIC 3
Circuit corrected + Integrator amplifier.
+ inside: capacitor and resistor used to reduce parasitic self effects
due to cable length.
Expensive: 10000 $
Parallel studies
- Improvement of the test bench
(In particular by buying an “expensive” generator for precise linearity tests).
- Pulse width, peaking time.
- ADC studies.
- CIS part.
- Analog output for trigger.
- Environment (3in1 card, LV regulators, MB-2, data format, DCS, connections…)
with contributions of both micro-electronics and electronics people.
3-in-1
FE-ASIC
QIE
MB-1
MB-2
MB-3
DB
STD-DRAWER
13
.
MINI-DRAWER
.
… towards a very aggressive planning !!!
FE-ASIC alternative
Feasibility tests
Done
Design ASIC FATALIC 1 & 2 in IBM 130 nm
Done
Test FATALIC1 & 2 @ C-F
Done
Test FATALIC2 in Bld 175
Q3-11
Design FATALIC3
Q4-11
Test FATALIC3 @ C-F
Q2-12
3in1 prototype design
Q4-11
3in1 prototype tests at C-F
Q1-12
Prototype design of MB-2 (similarto3-in-1 DB) Q4-11
MB-2 prototype tests at C-F
Q2-12
System tests in Bld 175
Q3/Q4-12
Design of FATALIC4 (ADC)
Q2-12
FATALIC4 tests at C-F
Q4-12
Radiation tests
Q1/Q2-13
Final designs for production
Q3-13
Tests in test beam
Q3-14
Comments:
Depending from the true upgrade schedule, the above “final” design
could be reviewed a new time if more time is available.
Question: is it judicious to speed up the studies
while Phase 2 is starting … many years later ?
14