• March Air Reserve Base Groundwater Conditions
• Proposed Environmental Service Cooperative
Agreement (ESCA) with the Air Force.
• Funding Basis and Terms
• Next Steps.
2 | emwd.org
Background
•
•
•
•
•
•
•
EPA lowered the Provisional Health
Advisory Levels (PHA) for 2Perfluorinated Compounds (PFC)
PFC in groundwater is from Site 7;
PFC is in aqueous film forming foam
and used at Site 7.
Well 59 and two private wells
detected PFC above the PHA.
EPA directed water agencies to treat
PHA as a drinking water standard.
Well 59 and two private wells were
shut down.
Air Force assumed responsibility and
prepared an agreement to fund the
cost of water that Well 59 would
have produced.
Requested EMWD to provide water
service to two private well owners.
3 | emwd.org
March Air Reserve
Base Boundary
Fire Fighter Training
Site (Site 7)
Private Wells
EMWD Well 59
EMWD Well 56
Environmental Services Cooperative Agreement (ESCA 1)
• Air Force agrees to pay the cost of imported water to
replace the water that Well 59 would have provided.
• Water quantity based the last two years of pumping data.
• Cost of the imported water is based on MWD current and
projected rates.
• Cost developed to provide water service to the two
residents.
• The agreement will retroactively compensate EMWD for
the water purchased since May 20, 2016, for up to three
years or until Well 59 has wellhead treatment.
4 | emwd.org
ESCA 1 Exhibit B – Cost of Imported Water
Cost Differential for Water Between Pumping from Well 59 and Purchasing MWD Imported Water
Water Sources
Imported Water From MWD for
State Project Water or Colorado
River Water
Treated Water (Tier 1)
Fixed Charges
Total Imported Unit Cost:
Water Pumped from Well 59
Total Well Unit Cost:
2016 ($/AF)
942
147
1,089
2018 ($/AF)
979
143
1,122
2019 ($/AF)
1,015
144
1,159
1,053
144
1,197
152
152
152
152
937
970
1,007
1,045
2016 ($/Year)*
2017 ($/Year)
2018 ($/Year)
2019 ($/Year)
Unit Cost Differential by Calendar Year:
Cost Estimate for ESCA
2017 ($/AF)
Annual Cost Differential of Using Imported Water in place of $
Well 59 production of 1589.18 AF/Year.
921,999 $
1,541,505 $
1,600,304 $
* The 2016 cost estimate represents the costs incurred from May 20, 2016 to December 31, 2016, when Well 59 was shutdown.
5 | emwd.org
1,660,693
Exhibit E – Cost to Provide Water Service to Two
Residents
Cost Estimate for Conversion Plan
(Construction Project and Service Connections)
Construction Project Costs
Task No.
Description
Design Phase - Site permits, design, surveying, geotechnical and
1
administration
2
Award Phase - Specification and Bid Award
Construction Phase - Construction Contract, Contract Administration and
3
Contingencies
Total Construction Costs:
Service Connection Fees
Task No.
New Water Service (Mendez)
4
$
$
25,000
1,900
$
$
106,000
132,900
Description
Standard Full Service/Meter Installation
5
Water Financial Participation Charges
6
Water Supply Development Fee
Move Remote Meter to Residence (Nordarse)
7
Plan of Service Deposit
8
Plan Check Deposit
9
Inspection Deposit (6-10%)
6 | emwd.org
Estimated Cost
Estimated Cost
$
4,430
$
$
9,766
300
$
$
$
Total Connection Fees: $
2,000
4,000
10,000
30,496
Total Construction and Service Costs: $
163,396
Estimated Costs for the Three-year ESCA 1
Task
Year
1
2
1
3
Descriptions
Costs
Purchase of 2016 Imported Water (May to Dec)
$921,944
Water Service for Two Residents
$163,396
Purchase of 2017 Imported Water
$1,541,505
4
2
Purchase of 2018 Imported Water
$1,600,304
5
3
Purchase of 2019 Imported Water
$1,660,693
Total for Cost for Three-year ESCA 1:
7 | emwd.org
$5,887,842
Next Steps
• ESCA 2 has been drafted and is currently under review;
this second agreement will fund the cost to provide
wellhead treatment for Well 59.
• It is believed that PFC are effectively removed using
Granular Activated Carbon (GAC). There are several
manufacturers of GAC available.
• The AF will fund a cost benefit analysis to compare well
replacement to wellhead treatment.
• ESCA 2 will be presented to the Board for consideration.
• New wells slated to be developed in the area are also
under discussion.
8 | emwd.org
Recommendation
Approve and authorize the General Manger to execute the
Environmental Services Cooperative Agreement Phase 1
with the Air Force Civil Engineer Center for Response
Activities of Off-Base Wells with Perfluorinated Compounds.
9 | emwd.org
Jayne Joy, P.E.
Director, Environmental & Regulatory Compliance
(951) 928-3777 Ext. 6241
email: [email protected]
10 | emwd.org