Inspired Bus Company

Download Report

Transcript Inspired Bus Company

Teacher Resource:
Inspired Bus Company
A lesson on power systems in urban environments
Restricted © Siemens Ltd 2016
siemens.com.au
The Inspired Bus Company
Overall learning objectives:
 To explore the challenges facing bus designers when designing the power system for a bus for an urban
environment.
 To investigate how different solutions can be identified and evaluated.
 To collaborate to present recommendation for an effective solution.
Overall learning outcomes:
 To have investigated and summarised key features of alternatives.
 To have presented a well deserved case for a solution.
Unrestricted © Siemens Ltd 2016
Page 2
The Inspired Bus Company
‘Leon’s London’
https://www.youtube.com/watch?v=S
9XyFX4FRuc
Unrestricted © Siemens Ltd 2016
Page 3
The Inspired Bus Company
Leon’s London
 Why are there different kinds of passengers at different times of the day?
 What impact does traffic congestion have on the bus journey?
 Why is traffic pollution an important factor in the design of the bus?
 What would be the problem in this context with using a bus that simply had a diesel engine driving the
wheels?
Unrestricted © Siemens Ltd 2016
Page 4
The Inspired Bus Company
Battery Power
Unrestricted © Siemens Ltd 2016
Page 5
The Inspired Bus Company
Battery power
 How would the batteries be charged up in a full sized vehicle?
 Identify where energy is being transferred from and to.
 Describe the environmental impact of this power system.
 What might affect the operating range of this vehicle?
 Summarise the advantages and disadvantages of this source.
Unrestricted © Siemens Ltd 2016
Page 6
The Inspired Bus Company
Fuel cell
Unrestricted © Siemens Ltd 2016
Page 7
The Inspired Bus Company
Fuel cell
 How would this work in a full sized vehicle?
 Identify where energy is being transferred from and to.
 Describe the environmental impact of this power system.
 What might affect the operating range of the vehicle?
 Summarise the advantages and disadvantages of this source.
Unrestricted © Siemens Ltd 2016
Page 8
The Inspired Bus Company
Diesel engine
Unrestricted © Siemens Ltd 2016
Page 9
The Inspired Bus Company
Diesel engine
 Identify where energy is being transferred from and to.
 Describe the environmental impact of this power system.
 What might affect the operating range of the vehicle?
 Summarise the advantages and disadvantages of this source.
Unrestricted © Siemens Ltd 2016
Page 10
The Inspired Bus Company
Racing car
Unrestricted © Siemens Ltd 2016
Page 11
The Inspired Bus Company
Bicycle brakes
Unrestricted © Siemens Ltd 2016
Page 12
The Inspired Bus Company
Bicycle brakes
 What happens to the temperature of the brakes if the bike wheel is set in
motion and the brakes applied?
 What happens to the temperature of the brakes if the speed is increased?
 What happens to the temperature of the brakes if the speed is held for longer
before braking?
 Where does the energy go when the wheel has stopped?
 How repeatable are these results?
Unrestricted © Siemens Ltd 2016
Page 13
The Inspired Bus Company
Using kinetic energy
Unrestricted © Siemens Ltd 2016
Page 14
The Inspired Bus Company
London bus
Unrestricted © Siemens Ltd 2016
Page 15
The Inspired Bus Company
Hybrid energy systems
Unrestricted © Siemens Ltd 2016
Page 16
The Inspired Bus Company
Suggest an effective power source and explain why
Unrestricted © Siemens Ltd 2016
Page 17
The Inspired Bus Company
Suggest an effective power source and explain why
Unrestricted © Siemens Ltd 2016
Page 18
The Inspired Bus Company
Group discussion
Unrestricted © Siemens Ltd 2016
Page 19
The Inspired Bus Company
Route one: rail/bus station shuttle service
Unrestricted © Siemens Ltd 2016
Page 20
The Inspired Bus Company
Route two: ‘inner circle’ service
Unrestricted © Siemens Ltd 2016
Page 21
The Inspired Bus Company
Route three: city-airport link
Unrestricted © Siemens Ltd 2016
Page 22