Don Dihel,CHMM
Portsmouth/Paducah Project Office
2016 Paducah Site Status Report
September 19, 2016
ASP 2016 Workshop
Site Background
•
•
•
•
3,556 acres total
> 500 structures / facilities
4 main process buildings
1,760 process components
•
•
•
•
Groundwater source contamination
Soils remediation
Future D&D
Pump-and-Treat optimization
www.energy.gov/EM
2
Paducah Gaseous Diffusion Plant
Contractors
• Swift and Staley Team
• Teaming partners of Swift and Staley Mechanical,
Wastren Advantage, Incorporated, and Northwind.
• Responsible for Facility Support Services at the Paducah
Gaseous Diffusion Plant in Paducah, Kentucky.
• Awarded fixed price contract in December 2015.
www.energy.gov/EM
3
Paducah Gaseous Diffusion Plant
Contractors
• Fluor Federal Services (FFS)
• Teaming partners of Fluor, Los Alamos Technical
Associates, and Chicago Bridge & Iron.
• FFS is responsible for the management, integration and
execution of the deactivation and post-GDP shutdown
remediation activities at the Paducah site.
• FFS is assumed responsibilities for enrichment and
support facilities in October, 2014.
• FFS supports DOECAP.
• Responsible for most environmental samples at
Paducah site.
www.energy.gov/EM
4
Project Scope
PERIOD 1
Task Order
Implementation Period
PERIOD 2
Deactivation Project
Timeline
De-Lease Planning &
Transfer Period
PERIOD 3
Future D&D
Facility Deactivation & Infrastructure Optimization Period
PERIOD 4
Post-GDP Shutdown Environmental Remediation Services Period
NTP
July 2014
Transfer of
GDP
October 2014
End of Current
Remediation Contract
End of Task Order
July 2015
July 2017
www.energy.gov/EM
5
Paducah Gaseous Diffusion Plant
Contractors
• BWXT Conversion Services (BWCS)
• Company has corporate headquarters in Lexington, KY
and plant operations in Paducah, KY and Portsmouth,
OH
• Comprised of Babcock & Wilcox Technical Services
Group (B&WTSG), a wholly owned subsidiary of
Babcock & Wilcox and URS Energy and Construction, a
subsidiary of URS.
• Operating contractor for the DUF6 project.
• Facilities currently shutdown, but startup expected
soon.
• New contractor to be announced shortly.
www.energy.gov/EM
6
Accomplishments
Deactivation and Environmental Remediation
• Drained, packaged, and shipped lube oil from process buildings some
of which will be reused as a cleaning agent.
• Drained, packaged, and shipped PCB transformer oil from 66 process
buildings PCB Transformers.
• Began removal of R-114 refrigerant from the gaseous diffusion plant
for safer deposit removal activities.
• Initiated the Deactivation of the C-400 facilities.
• Ten systems that will remove uranium deposits from the gaseous
diffusion plant, the first of their kind, are on site.
• Completed D&D of 11 facilities to support footprint reduction.
• Completed SWMU 1 deep soil mixing to remove TCE contamination
from soil.
www.energy.gov/EM
7
Fissile Deinventory
• Developed program to handle
fissile material as part of the
fissile deinventory project.
• Over 100 people were trained
to safely remove fissile
material in facilities that have
ceased operations.
• Almost 230 pieces of fissile
waste from the C-720
Maintenance and Stores
building have been removed.
162 total containers of waste
have been generated.
www.energy.gov/EM
8
Waste Management
FY16 Waste Management
• Dispositioned more than 240,000
gallons of lube oil from the
process buildings
• Dispositioned more than 94,000
gallons of PCB transformer oil
from Building C-337
• Developed four authorization
limit packages for offsite
treatment/disposition of lube oil
and PCB transformer oil; and
• Performed a paper and site Audit
of the Veolia Incinerator Facility in
Port Arthur, Texas.
www.energy.gov/EM
9
FY 2016 Planned Work
• Continue Uranium Deposit Removal
• Continue Deactivation:
•
•
•
•
•
•
•
•
•
•
Refrigerant
Lube Oil
Utility Optimization
Small, unused facility D&D
C-400 Deactivitaion
C-337 spare parts
Pump-and-Treat Operations
Southwest and Northeast Plumes
Regulatory documentation of the On-site Waste Disposal Option
Waste Management and Removal from several facilities and areas
www.energy.gov/EM
10
Waste Generation
Containers
Volume (ft3)
Volume (m3)
Weight (lbs)
Weight (tons)
Waste Generated
1,907
334,050
9,454
9,565,392
4,738
Waste Shipped Offsite
761
88,269
2.498
2,807,297
1,404
Waste Disposed in C-746-U
386
208,044
5,888
6,045,285
3,023
• The lube oil removal project has shipped 995 tons of waste offsite in
tanker trucks.
• A total of 1015 tons of PCB oil from PCB transformers have been
remove and shipped offsite in containers.
• C-400 Wastes being loaded into rail-cars and awaiting shipments to
Clive, UT.
www.energy.gov/EM
11
TSDs used by Paducah
•
•
•
•
•
•
•
Diversified Scientific Services, Inc., Kingston, TN
Energy Solutions, Clive, UT
Materials and Energy Corporation, Oak Ridge, TN
Clean Harbors Eldorado, Eldorado, AR
Clean Harbors Deer Park, Deer Park, TX
Waste Control Specialists, Andrews, TX
Perma-Fix of Florida, Gainesville, FL
www.energy.gov/EM
12
Paducah Support for DOECAP
•
During FY 2015, the Paducah site provided support
for the following TSD audits:
o Don Dihel – Waste Control Specialists, Andrews, TX
o During FY 2016, the Paducah site anticipates
supporting the following TSD audits:
o Don Dihel – EnergySolutions, Bear Creek, TN
Waste Control Specialists, Andrews, TX
o Lisa Turner – two audits - TBD
13
www.energy.gov/EM
13
Analytical Outlook
FY 2015
FY 2016
FY 2017
Total
740
4,500
3,300
8,540
Environmental Remediation Samples*
5,200
5,200
5,400
15,800
Total
5,940
9,700
8,700
24,340
Operational Samples
* Environmental Remediation Samples will continue to be shipped offsite for analysis.
www.energy.gov/EM
14
Approved Labortories
• ALS Laboratory Group Utah, Salt Lake City, UT
• GEL, LLC, Charleston, SC
• Materials and Chemistry Laboratory, Inc., Oak Ridge,
TN
• Microbac Tennessee, Johnson City, TN
• ALS Environmental Laboratory, Ft. Collins, CO
• TestAmerica St. Louis, Earth City, MO
• Southwest Research Institute, San Antonio, TX
• Shealy Environmental Services, West Columbia, SC
• ARS International,Port Allen, LA
www.energy.gov/EM
15
Paducah Support for DOECAP
•
During FY 2016, the Paducah site provided support
for the following laboratory audits:
o Lisa Crabtree – GEL and TestAmerica, Earth City, MO.
o Kelly Layne – GEL and TestAmerica, Earth City, MO.
o Cara Mills – MCL, Oak Ridge, TN
•
During FY 2016, the Paducah site anticipates
supporting the following laboratory audits:
o
o
o
o
Don Dihel–One audits – TBD
Lisa Crabtree–Two audits –TBD
Kelly Layne–Two audits – TBD
Cara Mills – Two audit - TBD
16
www.energy.gov/EM
16
Questions?
www.energy.gov/EM
17