MDTA Facilities

Download Report

Transcript MDTA Facilities

Maryland
Transportation
Authority
(MDTA)
MDTA
• Established in 1971
• Purpose
– Construct, manage, operate, and improve toll
facilities
• Funded by toll revenues, not tax dollars
• Headquarters - Point Breeze Office Complex,
Baltimore
• 9 Facilities
MDTA Facilities
Toll facilities consist of high-volume signature bridges, tunnels and highways
that are major interstate and U.S. routes
MDTA Facility
Toll Plaza
I-95 ETLs
Travel Plaza
*
* Note: the ICC uses All Electronic Tolling (No Toll Plazas)
Maryland Transportation Authority
6-Year Planned Budget
($Millions)
FY 2014
FY 2015
FY 2016
FY 2017
FY 2018
FY 2019
TOTAL
Mega Projects $255.03
$74.5
$12.22
$0
$0
$0
$ 341.75
All Other Major Projects $139.27
$157.30
$63.18
$79.70
$60.20
$10.50
$510.15
$133.5
$190.00
$240.4
$284.50
$273.00
$249.20
$1,370.5
---------
---------
TOTAL $527.8
$421.8
System Preservation and D&E
--------- --------- --------- --------- ---------
$315.8
$364.1
$333.2
$259.7 $2,222.50
I-95 Improvement Project
Hatem and Tydings Bridge Underwater Repairs
Bay Bridge Paint Projects
Bay Bridge Cable Rewrapping and
Dehumidification
Travel Plaza Replacements – P3
Maryland House final
rendering
Chesapeake House final
rendering
Upcoming Bid Opportunities
Chesapeake Bay Bridge
•
•
•
•
Phase 4 Painting (WB)
Deck Rehabilitation (EB)
Modify Lane Use System
Modify Crossovers and Resurface
Approaches
• Seal Deck (WB)
Upcoming Bid Opportunities
Baltimore Harbor Tunnel
•
•
•
•
Replace Vent Fans
Rehabilitate K-Truss Spans
Resurface Pavement north of the tunnel
Deck and Superstructure Replacement
over Patapsco Flats
• Replace Stand Pipes and Sump Pump
in tunnel
Upcoming Bid Opportunities
Baltimore Harbor Tunnel – Canton
Viaduct Replacement
Upcoming Bid Opportunities
Fort McHenry Tunnel
•
•
•
•
•
Repair Vent Fans
Replace Tunnel Lighting
Replace Salt Barn
Repair/Replace pumps
Rehabilitate 4 Bridges over Herring
Run and CSX
Upcoming Bid Opportunities
John F. Kennedy Highway
• Unbraiding of I-695 at I-95
• Zone Paint Tydings Bridge
• Resurface Pavement from MD-24 to
Delaware line
• Replace Light Poles
• Repair Corrugated Pipe Culverts
• ETL Wetland Mitigation and Stream
Restoration
Upcoming Bid Opportunities
Hatem Bridge
• Convert facility to All Electric Toll Collection
• Replace HVAC
Projects In Design
Francis Scott Key Bridge
• Resurface Pavement – Facility-wide
• Convert to All Electronic Toll Collection
• Overlay Bridge Decks at Dock Road and
CSX
• Repair Median Barrier and Lighting
Upcoming Bid Opportunities
Nice Bridge
• Bridge Replacement Project
– Preliminary Engineering
Upcoming Bid Opportunities
System-Wide Projects
• Replace Electronic Toll Collection and
Operating System, 3rd Generation
• Replace Closed Circuit TV (CCTV)
• Upgrade Fire Alarms and Security
Systems
• Upgrade/Replace Sign Structures
• Install Virtual Weigh Stations
Upcoming Bid Opportunities
Facility-Wide Programs for:
• Replacement of underground fuel
storage tanks with aboveground
storage tanks
• Repair/Replacement/Sealing of
Bridge Decks
• Zone and Spot Paint Bridges
Upcoming Bid Opportunities
Ongoing On Call Contracts
•
•
•
•
•
•
•
Structure Repairs
Concrete Repairs
Paving
Sign Structures
Electrical Repairs
Facility/Building Repairs
Total Maximum Daily Load (TMDL) –
Environmental
Future Unfunded Capital Projects
I-95 ETL Project
– Deferred portions of Section 100
– Section 200 (MD 43 – MD 22)
Replacement of the Harry W. Nice
Bridge
Conversion of all Facilities to Open
Road Tolling
Bay Bridge Replacement/3rd Crossing
QUESTIONS???