Laser Guide Star System at Subaru Telescope
Download
Report
Transcript Laser Guide Star System at Subaru Telescope
AO188/LGS status
AO188 development group(Subaru Telescope, NAOJ)
2009.1.16 (JST)
Outline
Current status
Risk shared open use
Commissioning schedule
Current stats on SR.
Sky background Oct 2008
9.1 mag
15.7 mag
16.6 mag
Aug 2008
Sep 2008
Oct 2008
Simulation 0.4”@0.5mm
Simulation 0.7”@0.5mm
Current status
AO performance using natural guide stars (NGS)
Observed SR matched with simulation results at faint end.
Mismatch at bright end needs to be investigated.
Need more statistics at various seeing condition.
Detail analysis to compare the performance between simulation
and observation is required.
Improvement on performance is planning.
Current status
Risk shared open use for AO188 with NGS
Imaging/Spectroscopy/Grism modes of IRCS are available.
AO acquisition time is about 10 to 15 minutes.
AO parameter tuning takes about 5 minutes.
9-points dithering
On slit dithering
Field rotation correction and PA selection by AO image
rotator.
Current status
Engineering items.
Non sidereal object. (Jan 15, 16)
Field distortion. (Analysis is on going)
Laser projection. (Jan 15, 16)
F-conversion optics for IRCS. (on going)
Isoplanatic angle. (Analysis is going on)
Extended guide star performance. (on going)
And so on……
Upcoming work
Performance improvement.
Laser guide star (LGS) mode.
LGS upgrade at wavefront sensor.
Tip-tilt and focus guide star acquisition unit.
Tip-tilt and focus wavefront sensor.
Additional components.
ADC.
BS exchange system. (NGS mode <-> LGS mode)
Schedule and milestone
Laser projection resumed on Jan 15.
9.5 engineering nights from Jan. to July.
S09A open use of NGS mode. (10 nights)
Some observing modes have a risk.
Fabrication, test and install for new
components start around April, 2009.
Schedule and milestone
S09B open use of NGS mode.
Fully functional.
Engineering observation of LGS mode starts
around autumn of 2009.
Risk shared open use of LGS mode from S10A.
Summary
Strehl Ratio at bright end is lower than
that of simulation result.
Mostly operational in NGS mode.
Start testing on LGS mode this autumn.
Risk-shared open use of LGS mode will
start from S10A.