SIMDAT and OGSA-DAI
Download
Report
Transcript SIMDAT and OGSA-DAI
SIMDAT and OGSA–DAI
Hans–Christian Hoppe
Intel GmbH, Bruehl
Edinburgh, April 7, 2004
SIMDAT
SIMDAT - Introduction
Four sectors of
international economic
importance:
Automotive
Pharmaceutical
Aerospace
Meteorology
Seven Grid-technology
development areas:
Grid infrastructure
Distributed Data Access
VO Administration
Workflows
Ontologies
Analysis Services
Knowledge Services
The solution of industrially relevant complex problems
using data-centric Grid technology.
SIMDAT is coordinated by Fraunhofer SCAI
(Clemens Thole)
SIMDAT
Key Grid Technologies
Key
technologies:
Knowledge Services
Integration of Analysis Services
Ontologies
Workflow
Administration of Virtual Organizations
Access to Remote Data Repositories
Integrated Grid Infrastructures
SIMDAT
SIMDAT - Strategy
SIMDAT takes an ambitious route to drive Grid technology
to the heart of industrial process:
PM 18
Phase 1: Connectivity
•Grid infrastructure operational
•Distributed DB access
operational
•Base on WSRF or WS
SIMDAT
PM 30
Phase 2: Interoperability
•Federate data
repositories
•Initial virtual data
repository
•Pull in NextGRID results
(and others)
PM 48
Phase 3: Knowledge
•Operate knowledge
capture, discovery&mining
•Leverage NG workflow
capabilities
•Base on NG Grid stuff
Project Structure
Automotive
Pharma
Aerospace
Meteo
Grid
technology
research
Technology
Champions
Knowledge Discovery
Analysis Services
Fraunhofer
MSC
Ontologies
Ontoprise
Workflow
Inforsense
Virtual Organisations
BAE Systems
Distributed Data Access
Integrated Grid
Infrastructure Prototypes
SIMDAT
Intel
SIMDAT Partners
End Users
Capability Providers
Grid Technologists
SIMDAT
Key Requirements – First 18 Months
Distributed access to (central) databases
unlimited distributed read access
(limited) distributed upgrades/writes
use DB to store small–medium datasets
use DB to store references to large datasets
provide monitoring, auditing
Start integrating with upper layers
engineering PSE, PDM systems
bioscience middleware (Lion SRS, ...)
meteo prediction and archival systems
SIMDAT
Key Requirements – Months 18–30
Work towards virtualization
federate DBs distributed across partners/sites
unlimited distributed read access
(limited) distributed update/write
virtualize SQL queries and data formats
support different DB implementations (IBM Oracle, ...)
integrate provenance information
accommodate large entries
introduce messaging layer?
Integrate Grid developments
other FP6 projects (NextGRID, ...)
rest of the world
SIMDAT
Key Requirements – Months 30–48
Complete virtualization
unlimited distributed read, update, write
distributed DB management
integration of ontology–based data/query processing
integration of advanced workflow techniques
identify and start to address performance issues
Integrate
Grid developments
results of FP6 projects
rest of the world
SIMDAT
First SIMDAT Phase
First
three–six months
consolidate requirements by application areas
provide gap analysis with OGSA–DAI
prioritize requirements and produce roadmap
identify risks and setup mitigation strategy
Months
6–12
integrate first Grid infrastructure&data access
functionality
SIMDAT