Transcript Slide 1
Mining in the Arab World - Ma’aden and the Kingdom of Saudi Arabia
Dr. Hany Dabbagh
Vice President SBU Precious Metals and Exploration
Melbourne, 5th May 2011
Underground at Mahd Ad Dahab Mine, Saudi Arabia
The Arab World
ARAB WORLD
9 % world land area
5% world population
4% world GDP
AUSTRALIA
5 % world land area
0.3% world population
1.3% world GDP
North Africa and Arabian Peninsula
Arabian-Nubian Shield
• Arabian Shield Area: 575,000km²
• 1,000 ancient copper and gold mines
• Wide variety of mineral systems
• 8,000 occurrences, many not subject to systematic
exploration
• Very low historical exploration spend
• Canadian and Australian Shields are of a similar age
and nature and host a multitude of economic deposits
• Ma’aden is expanding its exploration to cover
Precious and Base Metals, Uranium, Iron Ore and
REEs
Non-Petroleum Minerals and Metals in KSA
Source: MODS Database (2010)
Political Risk
Source: Office National Du Ducroire (April, 2011),
Country Risks Summary Table
Trade and Investment Opportunities in the
Arab World Mining Industry for Australia
Exploration & Development
Alliances, Joint Ventures, …
Mining Services
Contract Drilling, Skilled Manpower, O&M, …
Engineering and Construction
Environmental, Project Management, Engineering Design, EPC, …
Education
English Language Training, Trade and Technical, Staffing Local Colleges, …
Evolution of Ma’aden
1997~1999
2000~2002
2003~2006
2007~2008
Beginning
Gold Development
Mining Law & Railway
Capitalization
2000
Al Hajar Gold Mine
commissioned
2004
KSA Mining Investment
Law
2007
2009
Phosphate Joint Venture
with SABIC
Aluminum Joint
Venture with ALCOA
1997
Established
2002
Bulgah Gold Mine
Opened
2009~2011
Expansion & Growth
ECA with SWCC &
SEC
2006
North-South Railway
approved by Council of
Ministers
2008
Completed IPO
50% share public
Today
Phosphate Project
commissioning
Aluminium Project
under construction
7/16/2015
“A World Class Minerals Enterprise”
Gold and Base Metals
5 Gold operating mines
150 K Oz average annual production
1.2 m Oz reserves JORC compliant
Over 10 m Oz resources JORC compliant
Aluminum
Mine: 4 m tonne pa of bauxite
Refinery :1.8 m tonne pa alumina
Smelter :740 k tonne pa aluminium
Rolling mill: 460 k tonne pa
Phosphate
3 m tonnes pa of DAP per year
1.5 m tonnes pa phosphoric acid,
4.5 m tonnes pa sulfuric acid
1.1 m tonnes pa ammonia (0.4 is excess am.)
Industrial Minerals
Magnesite: commissioning mine at Zarghat
Magnesite calcination plant in Madinah
Industrial Grade Bauxite mine at Az Zabirah
Kaolin: mine at Az Zabirah
Ma’aden Phosphate Company
2007: Ma’aden and SABIC
signed joint venture agreement
to form Ma’aden Phosphate
company, MPC.
2008: MPC was registered.
SABIC have 30% equity share with 70% balance of ownership retained by
Ma’aden. The phosphate project is USD5.5 Billion investment.
10
Phosphate Joint Venture and Projects
Ma’aden Phosphate
70%
30%
Ma’aden Phosphate
Company
Starting commercial production in 3rd Q ‘11
100%
Al Khabra Project
Under Feasibility Study
Phosphate Resources
• Inferred Resources (as per SGS):
•Al – Jalamid …. 4,120 MMT
• Umm’wual
…. 3,570 MMT
• Mining Licenses:
• Al Jalamid : 49.55 sq KM
• Measured Resource : 534 MMT
• Al Khabra - Umm Wu’al:38 sq KM
• Measured Resource : 236.3 MMT
• Exploration License:
• Al Jalamid : : 2,480 sq. KM
AL Jalamid
• Indicated Resource :1 270 MMT
• Umm Wu’al: 1,699 sq. KM
• Indicated Resource : 450 MMT
Aluminum Project Profile
The largest and most efficient vertically integrated aluminum complex in the world
Bauxite Mine
•
•
•
•
Al Ba’itha mine
4 M tonnes annually
North-South railway to
transport bauxite
Operational 2014
Refinery
•
•
•
•
•
Located at Ras Az Zawr
First Alumina Refinery in
GCC
Smelter
•
Designed for expansion
•
•
•
Operational 2014
•
1.8 M tonnes annually
Co-located with Refinery
at Ras Az Zawr
740 KM tonnes annually
Designed for expansion
Ingots, billets, T-bar and
slabs for Rolling Mill
Rolling Mill
•
•
•
•
Operational 2013
•
7/16/2015
13
Co-located with Smelter
at Ras Az Zawr
460 K tonnes annually
Designed for expansion
Can, Auto, Foil &
Constructions
Applications
Operational 2013
Aluminum Project Progress
June 2010 - The JV
breaks ground
Oct. 2010 - The project
pours first concrete
Feb 2011 – Foundation
work
7/16/2015
Industrial Minerals
Magnesite
• Operating Mine at Zarghat
• Commissioning process plant at
Madinah
• Products include:
o Caustic Calcined Magnesia
o Dead Burned Magnesia
Kaolin and Industrial Grade
Bauxite
• Mine at Az Zabirah, started 2008
• Bauxite source of high alumina materials
for cement industry
• Kaolin for ceramics
• Potential for expansion into
downstream engineered Kaolin products
Industrial Minerals Exploration
• Developing deposits
• Expanding the mineral portfolio
Magnesite Processing Plant, Madinah
Under-investment in Saudi Arabia
and Arab World is not sustainable
in the long term
Under-explored geology and untapped
resource potential
Competitive energy supplies
Access to modern technology
Proximity to markets in Europe, Middle
East and Indian sub-continent
Modern mining and investment codes