What do we want to improve?

Profits

= Design success (TT$) ?

= Design capability (design technology + mfg technology) ?

= Design process ?

= Designer productivity ?

= CAD tools ?
– what is the $ value of a “better” scheduler, mapper, placer, … ?
– what is the $ value of GUI, usability, … ?

Improving individual CAD tools is probably not the answer
2
What is the problem?

Complexity
– ability to make silicon has outpaced ability to design it
– complexity of data, system interactions

SOC
– more functionality and customization, in less time
– design at higher levels of abstraction, reuse existing design
components
– customized circuitry must be developed predictably, with less risk


Key question: “Will the project succeed, i.e., finish on
schedule, under budget, while meeting performance goals?”
SOC design requires an organized, optimized design process
3
What is the design process?

Not like any “flow/methodology” bubble chart
–
–
–
–
backs of envelopes, budgeting wars
changed specs, silent decisions, e-mails, lunch discussions
ad hoc assignments of people, tools to meet current needs
proprietary databases, incompatible scripts/tools, platformdependent GUIs, lack of usable standards
– design managers operate on intuition, engineers focus on tool
shortcomings

Why did it fail?
– “CAD tools”
– “inexperienced engineers”

Must measure to diagnose, and diagnose to improve
4
What should be measured?

We don’t have a clue
–
–
–
–
–
–
–

running a tool with wrong options, wrong subset of standard
bug in a translator/reader
assignment of junior designer to project with multiple clocks
difference between 300MHz and 200MHz in the spec
changing an 18-bit adder into a 28-bit adder midstream
decision to use domino in critical paths
one group stops attending budget/floorplan meetings
Solution: record everything, then mine the data
5
Design process data collection

What revision of what block was what tool called on?
– by whom?
– when?
– how many times ? with what keystrokes ?

What happened within the tool as it ran ?
– what was CPU/memory/solution quality ?
– what were the key attributes of the instance ?
– what iterations / branches were made, under what conditions ?

What else was occurring in the project ?
– e-mails, spec revisions, constraint and netlist changes, …

Everything is fair game; bound only by server bandwidth
6
Example diagnoses

User performs same operation repeatedly with nearly
identical inputs
– tool is not acting as expected
– solution quality is poor, and knobs are being twiddled

Email traffic in a project:
traffic
time
– missed deadline, revised deadline; disengagement; project failed

Infinite possibilities! (and lots of interesting research…)
7
Benefits to project management

Resource projections before projects start
– go / no go at earliest point

Accurate project post-mortems
– everything was tracked: tools, flows, communications, changes
– optimize next project based on past results
– no data or information “loose” at project end

Less wasted resources
–
–
–
–


recover from bad runs (don’t make same mistakes twice)
prevent out of sync runs
no duplication of data / effort
R&D playground differentiated from Design
Efficient communications: email templates, auto-advisors...
Reproducibility: software assembly line science, not art
8
Benefits to tools R&D


Methodology for continuous tracking data over entire
lifecycle of instrumented tools
More efficient analysis of realistic data
– no need to rely only on extrapolations of tiny artificial “benchmarks”
– no need to collect source files for test cases, and re-run in house

Facilitates identification of key design metrics, effects on tools
– standardized vocabulary, schema for design/instance attributes
– cf. Fujitsu CSI ?

Improves benchmarking
– apples to apples, and what are the apples in the first place
– apples to oranges as well, given enough correlation research
9
First steps


Schema for information within the design process
Repository for this information
– data warehouse, APIs, ...

Instrument a design process and collect real data
–
–
–
–
scripts around existing reports / logfiles
new releases of tools that are compliant with metrics schema
possible initial scope: RTL to layout (Fabrics)
candidates: EDA vendors, GSRC tool research, design driver
projects
– (cf. LSIL, IP Symphony, Semicustom Highway, …)


Data mining and data visualization tools
We should outsource most of the above, and concentrate on
the mining, diagnosis, metrics definition
10
Schema fragments (placement)

Basic
– runtime, peak memory, HPWL/RSMT, partitioner/analytic placer
traces, timing/noise estimates, resynthesis ops
– technology, layer stack, site map, cell library EEQ/LEQ flexibility,
porosity measures, power distribution scheme, current delivery
capability, ...

Hierarchy-related
– how repeaters treated in hierarchy, spare methodology
– for each node: hierarchy level, xtor count, layout area, node’s
placed bounding box, fanout, ...
– for each net: timing budget/slack, LCA in hierarchy, route controls,
membership in bus, …

Routability
– congestion, pin density, cell density, crossing, ...
11
Recall: Optimization/Prediction

We need:
–
–
–
–
–
–

most relevant formulations and objectives
most relevant parameters of an instance
most relvant models of optimization heuristics (i.e., tools)
what should be passed down/up/between tools
bookshelf of formulations, interfaces, evaluators, …
culture change: standards for reporting/comparison, lower barriers to
entry for research
Metrics implicitly gives all of these ?!
12
Manufacturability metrics





Impact of mfg on design productivity
Inter- and intra-die variation
Topography effects
Impact, tradeoffs of newer lithography techniques and
materials
What is the appropriate abstraction of manufacturing
process for design?
13
Potential research: new metrics

Tools:
– scope of applicability
– predictability
– usability

Designs:
–
–
–
–


difficulty of design or manufacturing
verifiability, debuggability/probe-ability
likelihood of a bug escape
$ cost (function of design effort, integratability, migratability, …)
Statistical metrics, time-varying metrics
Key areas:
– T1-T2 interface
– T2-T3 interface
14
Other potential outcomes


Techniques for optimizing design processes
New measures of design value (as opposed to cost)
– what should be the price of a design?



Meta-result: documentation and measurement of GSRC’s
impact on the system design process
Metrics repository is the design repository ?
Summary: Record it, Mine it, Measure it, Diagnose it, …
Then Improve it
15