RF Baseline Design
•
RF Power Design driven by cost issues (no one has the funds)
•
•
2 Amplifiers from LBNL = 4 MW total
1 or 2 Amplifiers from CERN = 4 MW total (next week?)
– If 1 amplifier – needs a bigger drive?
Spare TH116 Tubes from ISIS
•
•
Split or more amplifiers?
– Hybrid device
• no satisfactory progress
• ok average but not peak power
• need to provide gas insulation (pk voltage > avg. voltage)
– Assume that we do R&D (trials) when we have the equipment
• Need both cavities and one amplifier circuit
• Test out a hybrid circuit driving two cavities
•
Fall back is to provide one amplifier chain per cavity
Paul Drumm
03 Mar 2004
Progress since…
• December LBNL
– Discussed shipping equipment to RAL
– Two 2MW power amplifier circuits
– Three (300kW) driver circuits
– 4616 test stand
– LBNL loan – to be written off (eventually)
Paul Drumm
03 Mar 2004
… December
• At LBNL
– Stripping down for transport
– Cleaning
– Packing
• At RAL
– Point of contact ?
Paul Drumm
03 Mar 2004
Staff…
• Roy Church
– Used up quota of days
– No Roy till April
• RF group at the Daresbury SRS
ASTeC
– Mike Dykes (group leader)
– Andy Moss (senior RF Engineer)
– plus two more
– MD & AM will be at the col’ab. mtg
Paul Drumm
03 Mar 2004
Plan for late 2004
• Limited funds
– Berkeley RF system to DL
– Strip down and make a technical
assessment of the equipment
• Cost to refurbish
• Confirm equipment is serviceable
– 6 month overlap with Roy
• Review RF design in the light of
CERN RF proposal
Paul Drumm
03 Mar 2004
For next FY
• Setting up a test-stand at DL
– Hall and facilities available
– Need to have got through GW2
• i.e. be in full funding mode
Paul Drumm
03 Mar 2004
Power Amp
Paul Drumm
03 Mar 2004
4616 Test box
Paul Drumm
03 Mar 2004
300 kW Driver Amplifier