Integration of Variable Generation
Task Force (IVGTF): Status
Warren Frost (Presented by John Kehler)
Chair, IVGTF
NERC Operating & Planning Committee
June 4-5, 2008
Toronto, Canada
IVGTF Scope
 The Task Force will prepare
• A concepts document that includes the philosophical and technical
considerations for integrating variable resources
• Specific recommendations for practices and requirements, including
reliability standards, that cover the planning, operations planning, and
real-time operating timeframes
 The document will include:
• Planning timeframe issues, such as contribution to capacity margins
modeling requirements to test system reliability and planning
transmission
• Operational Planning and Real-time operating timeframe issues,
including forecasting, short term adequacy, operator awareness,
interconnection frequency control, operating reserves, and wind power
management
• Review NERC Standards for any gaps
• Review of future developments including storage and other technologies
• Conclusions and recommendations.
IVGTF Status Report


With 50 participants, 5 Subgroups formed
•
Introduction
•
Characteristics of Variable Generation
•
Planning and Technical Impact
•
Operational Planning & System Operations
•
Other and Future Considerations
Leadership Team Drove first Draft (250 pages)
IVGTF Status Report


First Face-to-Face meeting held
•
Identify consistent themes
•
Focus on the impacts and implications - “what” not the “how to”
•
Develop key conclusions/recommendations
•
Review comments on each section
•
Identify overlaps and gaps
•
Excellent participation and shared learnings
A key observation is technical barriers for large scale
wind integration can be overcome. The challenges are
policy and costs.
IVGTF Report – Key Themes Identified
Uncertainty Transmission Flexibility
Efficiency
and
Reliability
Common Thread
Common Thread
THEMES
Equipment
Performance
Operations
Future
Common Thread
Planning
Common Thread
Characteristics
Common Thread
CHAPTERS
Introduction
Examples of the Themes and Common Threads

Uncertainty
•



Transmission
•
Planning transmission with variable resources connecting to the grid
•
Consideration of planning transmission with the potential of large amounts of
distribution connected generation connecting
Flexibility
•
Variable generation will require flexible resources
•
Examples of flexibility can be in future development of new conventional
generators, quicker access to generation across the interconnection, increasing
balancing area size, demand side options, storage, etc.
Efficiency and Reliability
•

Variable resources lead to uncertainty in time frames of minutes from real time
operation to years away from real-time operation
Wind power forecasting for example is one area where reliability and efficiency
will benefit
Equipment Performance
•
Wind power facility equipment standards will identify the requirements and
performance for items such as LVRT and voltage regulation.
•
Decisions made today on equipment performance we will live with for the life of
that facility
IVGTF Next Steps
Item
Conference Call

Next Steps include:
OC/PC
Conference Call
•
Develop 30-40 page report
with key themes &
identifying
recommendations
Conference Call
Review assignments first
drafts
Leadership Conference Call
Updated Outline
Sub-group final Outlines
Conference Call
Leadership Conference Call
1st Draft of Report
Meeting
Send to Lauby to compile
and send to Task Force
Review comments and work
on second drafts
Status Report for OC/PC
Status Report & preliminary
finding
Focus report
Agree on Themes;
Leadership team
Focused on the Themes
Review 2nd Draft
Review Second Draft
Report
IVGTF Delegation with EU
OC/PC
Present Final Draft Report
Meeting
Review OC/PC Comments
and develop Final Report
Present Final Report and
recommendations
Open Meeting to Present
results to the public
Meeting
•
•
•
Remainder of research will
be contained in appendix
that will provide an excellent
reference for industry
Complete 2nd Draft
Send to OC/PC for
comment in Sept.
Goal
Review Report outline and
make assignments
Status Report
Draft Conclusions
OC/PC
Draft Themes
Conference call
2nd Draft of Report
Conference Call
Meeting
OC/PC
Meeting/Workshop
Lead
2008 Milestones
Lauby
February
Frost &
Lauby
Task Force
March
Frost &
Lauby
Sub-group
Leaders
Frost &
Lauby
Sub-group
Leaders
Task Force
March
Leaders
Kehler &
Lauby
Lauby
Lauby
March
April 7th
April 25th
May 2nd
May 12th (½ day) May
13th (full day)
May 15th
June 4th – 5th
June 13th
June 20th
Leaders
Leaders
Lauby
July 13th
August 1st
August 12th – 13th
Delegation
Mutually agreed dates.
Week of August 25th
September 10th – 11th
Frost &
Lauby
Task Force
Frost &
Lauby
Task Force
November
December 3rd – 4th
March, 2009