Origo PhaseID System
• No cell phones
• No work delays due to
lack of cellular coverage
• Use on any voltage
• Very portable (only 3 lbs)
• Lowest cost solution
available
Principal of Operation
• A GPS timing signal is used to simultaneously
measure phase at a reference location and at a
field location.
• The phase attribute at the reference location is
known.
• By comparing the reference and field phase
measurements, the field phase attribute can be
determined.
Synchronous Motor Connected to
Phase A
Synchronous Motors Connected to
Phases A, B and C
Snapshot of Synchronous Motors
at Same Instant of Time
Phase Measurement Comparisons
• The reference phase base station can be connected
to any convenient wall socket of any phase.
• Each GPS second, the wall socket phase is
measured and stored in a PC file.
• When touched to any energized line, the field probe
measures the unknown phase at the next GPS
second and encodes it into a 9-digit sequence.
• Base and field measurements can be compared at
any convenient time and manner by simply entering
the 9-digit sequence into the PC.
Available in Handheld or Lineman
Handheld on Transmission Lines
• 345KV
• No extendo stick
required.
• Determine all 3
phases with a
single
measurement.
Handheld
on
Overhead
Lines
69KV
12.5KV
Handheld in Cabinets
12.5KV Bushing
12.5KV test Point
Handheld in
Substations
69KV
Buss
12.5KV
Buss
Handheld on Single Phase Line
Handheld with Netbook PC & Aircard
Convert a 20
Minute Extendo
Stick Phasing
Task on High
Overhead Lines
into a 20
Second Task
using the
Handheld
69KV
Lineman Field Probe
Substation Buss
12.5KV Bushing
Lineman Field Probe
Elbow Test Point
Secondary Conductor
Lineman Secondary Adapter (Optional)
Available in Manual or Datalogger
Manual Version
• Non-Real-Time phase
attribute determination.
• Write down the phase
sequences and enter them
into the base station later.
• Call your dispatcher, or any
other utility personnel, and
give them the 9-digit
sequence. They will enter it
into their PC and tell you the
phase attribute.
Datalogger Version
• Real-Time phase attribute
determination if Internet
access available.
• Automatically records the
phase sequence in a
measurement file.
• Provides GPS location.
• Accepts user notes.
• Real-Time Satellite
communication link available
soon.
Base Station Software
Tagging Reference Phase
• Tagging reference phase is one of the most important
concepts of phase identification.
• Tagging reference phase simply refers to what phase
attribute you wish to call each 3-phase conductor.
• There is no universal “Phase A”. Phases A, B, and C
are simply the phase attributes the utility wishes to
tag or assign to each of the 3-phase conductors.
• Once assigned, all conductors of the same phase are
tagged according to this chosen tagging reference
phase.
Open and Save Configuration Files
Typical Configuration Files
Configuration Setup
Entering Phase Sequences
Secondary Phase Attribute
Primary and Secondary Connection Phase Attributes
Field PC Software
User Inputs
GPS Position
Batch Convert
• All measurement sequences can be converted to
phase attribute with a single click.
• First, copy the base station daily reference file into
the field PC data directory.
• Next, click on the third icon to the right of the
measurement sequence window (red-to-green icon).
• This action converts all measurement sequences to
phase attributes and changes all red dots to green
dots.
Three Phase Vertical Lines
Three Phase Horizontal Lines
Remote Base Stations
Lineman Field Probe Soft Case
Lineman Field Probe Hard Case
Base Station
Base Station Antenna
PhaseID USA Customers
(That we know of)
Origo also has customers in Australia, Canada, India, Jamaica, New Zealand, and Taiwan.
Bottom Line
When you are tasked with
collecting thousands of
attributes to phase identify
your entire utility, no other
system available is as fast and
convenient as the Origo
PhaseID System