Transcript Document

PUMP TESTING
BY
KAUSTUBH V GITAPATHI
DIRECTOR
VI AUTOMATION (P) LTD, PUNE
Pump Test - Requirement










No Load Test
High Voltage Test
Insulation resistance – Measured with 500V DC
On Load Test
Lock Rotor Test
CALCULATED PERFORMANCE AT ACTUAL
FREQUENCY
Flow
Head
Pressure
Efficiency
Pump Test - Parameters Measured











3 Phase
0.5HP to 300 HP
1 Phase
0.5HP to 003 HP
Voltage
Current
Resistance
Frequency
RPM
Pressure
Flow
Leakage Current (HV Test – 1.5KV)
Insulation Resistance
Starting torque
Temperature
Pump Test - Parameters Controlled

Solenoid valve for Lock Test (24 V)
Pump Test – No Load Test

No load tests could be done at the various
voltages starting from 150V to 450V. The
system would be programmed to carry out the
tests at the following voltages.
 For three phase:
150V
200V
250V
300V
350V
400V
415V
450V
1000 v
 For single phase
 140V
160 V
180 V
200V
220V
230 V
Pump Test – No Load Test









The following parameters would be recorded
and tabulated
Voltage
Current
Power
Frequency
CW RPM
CCW RPM
Slip
Resistance
Pump Test – High Voltage Test

High voltage test would be carried out by
connecting 1500V AC across the coils
and motor body. The leakage current in
mA would be recorded. An indicator light
will glow to indicate if the leakage current
is at acceptable levels. If the current
exceeds the limit another light will glow
indicating failure.
Pump Test – Insulation resistance –
Measured with 500V DC


The insulation resistance in mega ohms
would be determined by applying 500V
DC across the coils and the motor body.
The resistance in mega ohms will be
recorded
An indicator light will glow to indicate if
the resistance is at acceptable levels. If
the resistance is less than the limit
another light will glow indicating failure.
Pump Test – Locked Rotor test




The following parameters will be
recorded in locked rotor condition. The
rotor would be physically locked during
this test.
Voltage
Current
Power
Pump Test – On Load test





Load test will be done by varying the flow rate
with the help of motorized valve. Tabulated
readings as well as graphical display of various
parameters Vs flow rate will be provided. The
following parameters would be measured and
displayed graphically as and when required to
be viewed
Current
Vs Flow rate
Power
Vs Flow rate
Efficiency
Vs Flow rate
Pressure
Vs Flow rate
Pump Test – Parameters Display












Resistance: RB, YB, RY
Pump Type
Flow
Head
Supply Frequency
Overall Efficiency
NP in KW
NM in KW
Sp. Gr. Of liquid used for testing.
Motor Type
Motor Rated Power in KW
Frequency, Voltage and Current.
Pump Test – No Load Parameters
Display





Voltage
Current (Run, Start and Line)
CU Loss (Calculated)
Power
Power CU Loss at No Load (Calculated)
Pump Test – On Load Parameters
Display at Actual Frequency







Current (Run, Start and Line)
Power
STATOR Input
STATUS CU Loss (Calculated)
Losses (Mechanical, Iron, CU Loss)
(Calculated)
Frequency
RPM Direct Input from (CW, CCW)
Pump Test – Sample Report
Pump Test – Additional Features
 Interface
with company Database
 Reporting in Company Format
 Data Sharing on Internet
 Any customized requirement
Pump Test – System Components
 Data Acquisition
 Energy
System
Meter
 Slip- Speed Meter
 Magnetic Flow Meter
 Temperature Indicator
 Head Meter
 Solenoid Valve
Pump Test – Additional Information
Contact
Mr. Kaustubh V Gitapathi (Mb: 9850823210)
Director
VI automation P Limited
C/2, Apna Ghar Housing society,
Shankarsheth Road, Pune 411041
E mail:- [email protected]
Web: - www.viapl.com
Ph: +91 20 64002256/7
Fax: +91 20 26451554