Totally Integrated Power
Download
Report
Transcript Totally Integrated Power
Totally Integrated PowerTM
Hotel Colosseo, Europapark Rust, Germany
References
Contents
Project
Data Center
New building of a hotel complex in Italian style
Factory
Building
Building
Hospital
Water / Waste Water
Other
Totally Integrated Power – Reference
Totally Integrated PowerTM
Hotel Colosseo, Europapark Rust, Germany
References
Contents
Data Center
Requirements
Factory
Building
Building
Application
Hospital
Water / Waste Water
Other
Minimum risk for man and machines
Innovative, integrated technology
Cut-down on operating costs
Minimum installation and commissioning times
Products for the complete power distribution from medium voltage (SF6
8DJ20 MV switchgear) to low voltage (SIVACON 8PT NSHV with
SENTRON switches) to the wall outlets (DELTA plus)
Installation technology (DELTA line): 4,500 wall outlets, 2,000 switching
points for lighting, 800 communications and antennae components,
instabus EIB; 220 kilometers of power and control cabling
Building services management (heating, ventilation, air conditioning), as
well as electro-acoustic and multi-media systems (multi-media equipment for small and large conference rooms, up to an option for sound
coming directly from the wall)
Result
Highest system availability thanks to integrated engineering from the
planning to the implementation stage; all of the customer requirements
could be met.
Totally Integrated Power – Reference