start slide: headline arial bold 38 pt, 0 pt leading
Download
Report
Transcript start slide: headline arial bold 38 pt, 0 pt leading
Landis+Gyr, Inc.
MAXsys 2510 Metering
Family
2
MAXSYS Topics
Review of Current Features
The latest new Features
Value Added solutions
The next generation
Landis+Gyr, Inc
3
MAXsys 2510 - 19” Rackmount Style
•All standard features
•Auto-ranging power
supply
•40-140V or 85-330V
•3 option slots
•3 element meter only
•Mating cables sold
separately
•19” rack bracket
available
Landis+Gyr, Inc
4
MAXsys 2510 – Switchboard Styles
•Tall and short
switchboard models
available
•All standard features
•Auto-ranging power
supply
•40-140V or 85-330V
•3 option slots
•3 element meter only
•Mating cables sold
separately
Landis+Gyr, Inc
5
MAXsys 2510 – Socket-base Styles
•All standard features
•Standard or custom
cabling
•Auto-ranging power
supply
•40-140V or 85-330V
•3 option slots
•Form 9/8S, 35S, 36S, 10S,
26S, 5S
•Mating cables sold
separately
Landis+Gyr, Inc
6
MAXsys 2510 Standard Features
Per phase volts, amps, watts and var
measurement for power quality monitoring, total
harmonic distortion and power outages
Transformer Loss Compensation
Line Loss Compensation
20 mA Current Loop Port
Four programmable pulse outputs
Flash EPROM
AC or DC Auxiliary Power
Four quadrant metering
ANSI and IEC approved for class 0.2 metering
Landis+Gyr, Inc
7
MAXsys 2510 Standard Features
16 bit microprocessor, bus architecture
Multi-tasking operating system
Bi-directional measurement
16 channel data recording
Time of Use
2 line x 16 character programmable display
Totalization Functions
Modular design for upgrading/adding options
Non volatile memory for operating parameters
and display registers
Landis+Gyr, Inc
8
MAXsys 2510 Standard Features
Password protected
Read-only password - 2 available
No-format jumper - for security and sealing
RS-232-1 port for external modem, etc
RS-232-2 port for bi-directional interface
Individually addressable
256K RAM
Re-chargeable back-up battery for profile data
and clock
Power Outage Monitoring
Landis+Gyr, Inc
9
MAXsys 2510 Optional Features
4 Analog outputs (up to 8 available)
4-20 mA or +/-1 mA
8 auxiliary Inputs for process loads, gas, water, etc..
Up to 12 output relays for alarms, capacitor control
and load control functions (4 outputs standard)
Protocol Converter board for SCADA interface
DNP 3.0 level 3, Modbus, and many others
1200 or 2400 baud modem with master/slave interface
485 port (requies protocol card)
Instrument Transformer Compensation
Landis+Gyr, Inc
10
MAXsys 2510 Value Added Solutions
Transformer Loss Calculations
Multiple Levels of Calculations
• Calculate the losses Netting Of Sub-loads Before
Calculations
• Subtracting station service loads before
calculating the losses across power across
multiple transformers simultaneously.
Logic Control Of Calculations
• Controls when and how the loss are calculated
base on logic conditions.
• transformers.
Summing of Loads Before Calculations
• Summing generator loads which share power
transformers.
Compensated Analog Values
• Provides compensated analog values at all points
of compensation.
Landis+Gyr, Inc
11
MAXsys 2510 Value Added Solutions
Line Loss Calculations
Loss calculations
• Resistance
• Reactance
• Charging Vars
Multiple Levels Of Compensation
• Calculate the line losses across multiple lines at
different points of transmission simultaneously.
Multiple Sets Of Constants For Each Level
• Allows the meter to change the loss calculations
as the transmission lines are reconfigured.
Logic Control Of Calculations
• Logic control from external inputs and or
communications allow the loss calculation to
change based on real time reconfiguration of the
transmission lines.
Landis+Gyr, Inc
12
MAXsys 2510 Value Added Solutions
DNP 3.0 Level 2 & 3
Complies to DNP3-2000 Certification Procedure
Binary Inputs(27)
AND OR Logic Control
Binary Outputs (12)
Analog&Counter Outputs(96)
Event Storage (Binary,Analog,Counter & Freeze)
Unsolicited Responses
Collision Avoidance
Relay Control (S.B.O.,Direct No ACK & With ACK)
Communication speeds up to 19200
Landis+Gyr, Inc
13
MAXsys 2510 Value Added Solutions
Power Quality
Outage Reporting
• Reports loss of voltage to the meter electronics
• Reports restoration of voltage to the meter electronics
Loss of Phase
• Reports loss of voltage to any metered phase
• Reports restoration of voltage to any metered phase
Captures Voltage Events (Sags & Swells)
• Captures date and time of event
• Stores length of the event (1/2 cycle)
Landis+Gyr, Inc
14
MAXsys 2510 Value Added Solutions
Power Quality
Captures Simultaneous Current
• Captures the simultaneous value of current with the sags or
swells of the voltage
Stores Daily Highs and Lows
• Stores 6 high and low values (programmable) per day
• Circular memory stores previous 3 days of highs and lows
Total Harmonic Distortion
• Can display, record and control
– 60 Hz or 50 Hz values (fundamental)
– Non-fundamental values
– Total (net) values
Landis+Gyr, Inc
15
DURATION
1 CYCLE RMS
HI TRIP POINT
RMS PHASE
VOLTAGE
CURRENT
MONITORING
LOW TRIP POINT
1 SECOND
1 SECOND
Landis+Gyr, Inc
16
Time Stamped Power Quality Events
Landis+Gyr, Inc
17
MAXsys 2510 Value Added Solutions
Instrument Transformer Correction
(IT; CT’s and VT’s)
Phase and Ratio error must be known at the burden levels
that the transformers in the meter system actually see.
Wiring losses must be included as well.
The PT ratio and phase corrections are fixed and do not
change with levels.
The CT ratio and phase corrections are DYNAMIC and
change with current levels as needed.
The corrections are done at the beginning of the signal
processing and they benefit all readings, as well as watt
and VAR pulses.
Landis+Gyr, Inc
18
MAXsys 2510 Value Added Solutions
Instrument Transformer Correction
(IT; CT’s and VT’s)
Many existing installations have instrument transformer which
may not meet metering accuracy class 0.3%. The dynamic CT
correction allows for system accuracy improvements without
changing the existing CT’s.
Increased accuracy can yield increased revenue.
Increased accuracy without buying new transformers.
Increased accuracy without the labor of changing out CT’s.
Improves the overall accuracy of all CT installations including
metering system which have metering accuracy CT’s.
Landis+Gyr, Inc
19
MAXsys 2510 Value Added Solutions
Instrument Transformer Correction
(IT; CT’s and VT’s)
A switch in Maxcom allows the user to turn the correction ON and
OFF without losing CT correction data in the meter – useful for
testing of the meter.
Operation of the correction can be verified by running watt-hour
registration at 5A PF=1.0 and 0.5 Lag, and at 0.5A PF=1.0 and 0.5
Lag. Expected readings can then be verified.
Landis+Gyr, Inc
20
Relay CT and Meter – With and Without
Correction Applied
System % Registration
102.000
101.800
101.600
101.400
101.200
101.000
100.800
100.600
% Accuracy
100.400
100.200
FL No
Pf No
Pf With
FL With
100.000
99.800
99.600
99.400
99.200
99.000
98.800
98.600
98.400
98.200
98.000
15
25
50
100
150
250
400
Load Points
Landis+Gyr, Inc
21
MAXsys 2510 Value Added Solutions
Internet Connectivity – ET-Lite Device Server
External device that interfaces with RS-232 port
Siemens native protocol
Industry protocols (DNP 3.0, MODBUS, etc)
Gives the meter an IP address
Link to the internet
Connection to an Ethernet LAN
Data encryption over the Internet
Landis+Gyr, Inc
22
MAXsys 2510 – IP Addressability
•Makes any
serial device IP
addressable
•Standard
Ethernet type
connection
•Low power
requirements
•Easily
programmed
•Easy to install
Landis+Gyr, Inc
23
MAXsys 2510 Value Added Solutions
Energy Terminal device server
Multi-port communications
Pki encryption capability
Upload meter information directly to an Internet website
• Real time data with 4 second updates
• Type 7 or industry standard protocols
Applications
Energy management systems
C&I accounts
IPP’s
Landis+Gyr, Inc
24
New Product Features
Dual RTU boards
Modbus, DNP 3 level 2, cooper, PG&E, & others
Second board must be DNP 3 level 2
Dual 16 channel recorders
Independently programmable interval lengths
Increased RAM to 512K
True 1-second updates
Increased port speeds (19200)
Peer to peer networking capabilities
Data gates
Advanced math package for increased flexibility
Landis+Gyr, Inc
28
Why Peer to Peer Communications?
Can free up option card slot
Reduce installation cost
Labor and material
Transfers more information
Data (real time)
Status (real time)
Improves meter summing & netting
Instantaneous values
Analog outputs
Improves real time information
Reduces granular data
Landis+Gyr, Inc
29
Math Package
Addition (Sum)
Subtraction (Diff)
Multiple (Prod)
Divide (Quot)
Square Root (SQRT)
Data Gates
40 Totalizers
32 User defined calculations
Landis+Gyr, Inc
30
Data Gates Application
Del. Kwh
Auxiliary Input
8 Status 1
Total Del. Kwh
Y1
True
Y1
False
Data
Gate
Del. Kwh CAISO
Data
Gate
Del. Kwh CFE
Data
Gate
Rec. Kwh CAISO
Rec. Kwh
Landis+Gyr, Inc
31
Market Segmentation
Generation stations
Transmission & sub-transmission stations
Distribution stations
New large end customers
Landis+Gyr, Inc
32
Value Proposition - Generation
RTU board vs. RTU
Save cost difference + installation costs
Multi-level transformer loss compensation
Save cost of CTs, meter, and installation costs
Analog outputs
Save cost of transducers with uncompensated values
Compensated analog values save install cost + transducers
Multiple communication paths
Save cost of additional meters + installation cost
Peer to peer networking
Save installation costs + hardware cost
Landis+Gyr, Inc
33
Value Proposition - Transmission
Multi-function revenue accurate IED (existing or new)
Improved accuracy
Multi-level TLC/LLC
Reduced cost with IT correction (existing stations)
Increased accuracy can yield increased revenue.
Increased accuracy without buying new transformers.
Increased accuracy without the labor of changing out
CT’s.
Improves the overall accuracy of all CT installations
including metering system which have metering
accuracy CT’s.
Landis+Gyr, Inc
34
Value Proposition - Distribution
Small point RTU built into Meter
Saves cost of RTU
Saves costs of installing full scale RTU
Feeder monitoring (loading)
Transformer monitoring (loading)
Multiple communication paths
Saves installation costs for additional metering
Event reporting
Landis+Gyr, Inc
35
Value Proposition - Large Industrial Customer
Low cost RTU (special rates)
Low side metering
Reduced installation costs
• $70k for 69KV vs. $4K for 15KV
Multiple communication paths
Saves installation costs for additional metering
Event reporting and load profiling
Controls
Logic and data gates
Output relays
8 inputs from other meters or peripheral devices
Landis+Gyr, Inc
36
Future Product Features
High speed modem
At least 19200 baud
Compatible with older modems
Updated technology to interface with digital cellular networks
Three-phase power supply
Long-life lithium battery
Digital inputs to meter from optical CTs and VTs
Bypass measurement circuitry in meter
Higher accuracy system for increased revenue stream
Development of next generation MAXsys meter
Need utility input for design features
Landis+Gyr, Inc
37
The Future of MAXsys Metering
High-precision accuracy below 1mA secondary
Advanced power quality features
Waveform capture
Individual harmonics
Ethernet port under glass
Flexibility of interfaces
Fiber optic, RS485, RS232, 10base-T, etc.
Optically isolated interface to the meter
Wireless digital modem
Plug and play upgradeability of new features
Landis+Gyr, Inc
38
Infrared LED
Reduced height
Transmit/Receive Status
Graphical Display
Visible LED
No Backlighting
Pushbutton
Access
Landis+Gyr, Inc
39
Power Quality Enhancements
L+G diagnostics
Waveform capture
• Triggered by a setpoint, programmable schedule
based on time or logic, or external signal
• Number of capture cycles user selectable
• 16 to 256 samples per cycle (selectable)
• Seven channels for recording
Flicker – according to industry standards
Individual harmonic analysis to 63rd harmonic
• Triggered by the same method as waveforms
Landis+Gyr, Inc
40
Power Quality Enhancements
Voltage Sags and Swells
• Quarter cycle resolution to X number of cycles
• Rolling floating point nominal voltage every X
number of minutes (user defined)
• Simultaneous current
• Three levels of voltage thresholds
• Three separate sag and swell recorders running
simultaneously
Transient events
• Waveform recording to capture transients on
current and voltage waveforms
• Time resolution to within one (1) millisecond
Landis+Gyr, Inc
EVM
41
Landis+Gyr, Inc
42
EVM Online Reporting
Event Log
Power Quality
Diagnostics
Landis+Gyr, Inc
43
Event Log
Events logged by Month,Day,Hour
and Minute
Up to 100 events in wrap-around
memory
Landis+Gyr, Inc
44
Examples of Event Log
ac power down
ac power up
Clock set
Status input change
Unit access
Password change
Cold start
Static input register
Relay Control Set-points
Low Battery
Etc.
Landis+Gyr, Inc
45
EVM Power Quality
Per phase reporting
Voltage outside tolerance range
(high or low)
MAX or MIN volts (1,2,or 3 cycle
rolling 1/2 cycle)
Coincidental current
Length of event in 1/2 cycles
Landis+Gyr, Inc
46
EVM
Time-Stamped Power Quality Events
Siemens Power Transmission & Distribution, Inc.
© Siemens, 2000
Landis+Gyr, Inc
47
2410/2510 Diagnostic applications
S4 type diagnostics
Phase angle data
Per phase data
Dial in on diagnostics
Display diagnostics
Log diagnostics to history
Landis+Gyr, Inc
48
Diagnostic Reporting
Polarity and Cross Check (1)
Any phase angle more than +/- 15 degrees
Phase Voltage Deviation Check (2)
Checks each phase against nominal
Inactive Phase Current Check (3)
Checks each current against specified value
in diagnostic control table. If any current is
below its threshold, fails; if all below, passes
Landis+Gyr, Inc
49
Diagnostic Reporting
Phase Angle Displacement Check (4)
Verifies that power factor is within specified
limit on each enabled phase
Current Magnitude Imbalance Check (6)
Checks relative amplitude of the enabled
phase currents; compares each current to the
average of all currents
Energy Direction Check (7)
Fails if any phase energy flow is negative (received power)
Landis+Gyr, Inc
50
Diagnostic Reporting
Auto Sense
Wye or Delta
Phase A volts
Phase rotation
e.g. : 4 Wire Wye
120 V
ABC
Landis+Gyr, Inc
Diagnostic Report
51
Evsocket.log
•
FILE: EVSOCKET. LOG
•
TIME: Sun Jul 16 00:55:19 2000
–
Call Date & Time: 07/16/2000 00:53:24
–
An Installation Diagnostic Event has Occurred for UID:1234567
–
(C0l) Ajax Industrial 1234567890
–
(C02) Diagnostics
–
(U01) Ajax Industrial 1234567890
»
Auto-sense:
»
277 Volts 4 Wire WYE (ABC)
1 1 1 1 1 1 1
Diagnostic:
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6
»
Enabled:
Y Y Y Y N Y Y N N N N N N N N N
–
Pass for Diagnostic 4 (00019 fails total)
–
Fail for Diagnostic 6 (00032 fails total)
Landis+Gyr, Inc
52
EVM logging an Event
Landis+Gyr, Inc
53
EVM completing and reporting on notification via email.
Landis+Gyr, Inc
54
EVM call Logs
Landis+Gyr, Inc
Landis+Gyr, Inc.
Growing A Great
Relationship