Prioritizing future developments in TMN standards

Download Report

Transcript Prioritizing future developments in TMN standards

European Telecommunications Standards Institute
http://www.etsi.fr
TIPHON
Fall’97 VON
David Gurle
David Gurle
1
Agenda
Few words about ETSI
ETSI’s work on Internet Telephony
– History
– Creation of TIPHON
– TIPHON’s goals and ambitions
– TIPHON’s project plan
– TIPHON’s deliverables
David Gurle
2
ETSI - Objective
To produce the technical standards which are
necessary to achieve a large unified European
Telecommunications market
David Gurle
3
ETSI - Membership
• 418 Full Members from 32 countries
• 88 Observers from 17 countries
• 31 Associate Members from 12 countries
• Membership is growing steadily...
David Gurle
4
ETSI - Major achievements
Mobile networks
– GSM (Global System Mobile)
– DECT (Digital Enhanced Cordless Terminal)
– TETRA (Terrestrial Trunk Radio)
Fixed networks
– ISDN
– B-ISDN/ATM
– SDH
– Telecommunication Management Network (TMN)
David Gurle
5
Lucent Technologies
3COM
Alcatel
Belgacom
Cisco
Deutsche Telekom
Ericsson
France Telecom
Motorola
Nokia
Nortel/MICOM
Siemens AG
Post & Telekom Austria
Telia
VocalTec
KPN
David Gurle
7
TIHPON - Goals
Main objective
– Combine telecommunications and Internet technologies to
enable voice communications over IP-based networks to
work with existing PSTN/ISDN/GSM networks
Philosophy
– to create a competitive environment which allows to produce
specifications with a global acceptance
David Gurle
8
TIPHON - Scope
Initial focus on voice communications
3 phases:
– Phase 1 (until end of 1997): Voice communication from an IPbased terminal to PSTN/ISDN/GSM handset
– Phase 2 (until June 1998) : Voice communication from
PSTN/ISDN/GSM hand set to IP-based terminals
– Phase 3 (until December 1998): Voice communications from
PSTN/ISDN/GSM handsets to PSTN/ISDN/GSM handsets
using an intermediary IP-based network
David Gurle
10
TIPHON - Technical Objectives
– define set of requirements for service
interoperability;
– identify reference configurations, interfaces and
functional models (gateway)
– specify call control procedures, information flows
and protocols;
– standardize address translation between E.164 and
IPv4/v6 addresses
David Gurle
11
TIPHON - Technical Objectives (…)
– specify technical aspects of charging/billing
– specify technical aspects of security
– define end-to-end quality of service parameters,
including transcoding and echo-cancellation
– implement and build demonstrating environment
for TIPHON based products, the TIPHON Net!
David Gurle
12
Tiphon - Project plan
David Gurle
13
TIPHON - Structure
Project Committee
– Project Management Committee (PMC)
» Chairman, Helmut Schink
» Vice-Chairmen,
Louise Spergel, Staffan Braugenhardt, Barry Castle
» Technical Officer, David Gurlé
» Working Group Chairmen
» Secretary, Gerald Meyer
– Working Groups
– Participants
David Gurle
14
TIPHON - Working Groups
6 Working Groups:
– WG 1 - Mohammad Mahloujian: Requirements for service
interoperability, technical aspects of charging/billing and
security
– WG 2 - Jozef Vandenameele: Architecture and reference
configurations
– WG 3 - Scott Petrack: Call control procedures, information
flows and protocols
– WG 4 - Louise Spergel: Naming, Numbering and Addressing
– WG 5 - Barry Castle: End-to-End Quality of Service aspects
– WG 6 - Michael Blaschitz: Verification and Demonstration
Implementation
David Gurle
15
TIPHON - Marketing activities, Vice-chair
Barry Castle
Goals
– Obtain industry acceptance of our output
– Gain support from Administrations and Regulators
– Obtain support from other standards bodies
Methods
– Press Releases, Press Conferences and Interviews with key
TIPHON officials
– EU: Direct contact with DGIV, DGXIII and DGIII
– Progress Reports to Official bodies
– Reporting on Liaisons with industry consortia, ETSI internal
Liaison and with other Standards Bodies
– Participation in ECommerce and SME initiatives
– Meetings in USA and Asia/Pacific
David Gurle
16
TIPHON - Liaison activities
Avoid overlapping and assure a complete coverage of
the area: technically and geographically
– Within ETSI:
» Technical Committees: Network Aspects, Special Mobile Group,
Signaling, Switching and Protocols
» ETSI Projects on Terminals: Multimedia, Digital
– Outside ETSI:
» ITU-T
» IETF
» IMTC, VoIP Forum
» EURESCOM
David Gurle
17
TIPHON - Organigramme - Overview
Tiphon Project Committee
Project Management Committee
David Gurle
Working Groups
Meeting participants
18
TIPHON - Organigramme - Details
David Gurle
Technical Officer
ETSI
Helmut Schink
Chairman
Siemens
Louise Spergel
Vice-chairman
Lucent technologies
Gerald Meyer
Secretary
Siemens
Staffan Braugenhardt
Vice-chairman
Ellemtel
Barry Castle
Vice-chairman
3Com
Mohammed Mahloujian
WG1 chairman
Ericsson
David Gurle
Jozef Vandenameele
WG2 chairman
Alcatel
Scott Petrack
WG3 chairman
VocalTec
Louise Spergel
WG4 chairman
Lucent technologies
Barry Castle
WG5 chairman
3Com
Michael Blaschitz
WG6 chairman
Post & Telekom Austria
19
TIPHON - WG 1
Requirements for service interoperability, technical
aspects of charging/billing and security
Objective:
– Analyses of requirements for services and definition of
mechanisms to ensure service interoperability including
technical aspects of charging/billing and security
Deliverables:
– 3 Technical Reports: Requirements for service
interoperability for phases 1, 2 and 3
David Gurle
20
TIPHON - WG 2
Architecture and reference configurations
Objective:
– Define reference configurations, network architectures
service scenarios, functions and interfaces
Deliverables:
– 3 Technical Specifications: Reference configuration, network
architecture and interfaces for Phase 1, 2 and 3
David Gurle
21
TIPHON - WG 3
Call control procedures, information flows and
protocols
Objectives:
– Specify the Information Flows that occur when calls are
placed between an H.323 endpoint and a PSTN/ISDN/GSM
terminal
– Produce protocol enhancements or specifications to enable
the Information Flows and Call Control Procedures for calls
between an H.323 endpoint and a PSTN/ISDN/GSM terminal in
the reference configurations
– Enable the service definitions of WG1, the reference
configurations of WG2, the naming and addressing
specifications of WG3
David Gurle
22
TIPHON - WG3 (...)
Deliverables:
– Technical Specification (TS): Call control flows for ITU-T
Recommendation H.323 - PSTN/ISDN/GSM involving multiple
domains
– Technical Specification (TS): Call control flows for calls from
H.323 terminal to PSTN/ISDN/GSM terminal
– Technical Specification (TS): Object identifier for GSM
David Gurle
23
TIPHON - WG 4
Naming, Numbering and Addressing
Objective:
– identifying and solving naming, numbering and addressing
issues specific to/from IP terminals to/from E.164 terminals
(PSTN/ISDN/GSM), including carrier selection aspects
Deliverables:
– Technical Report (TR): Interworking from IP terminals to
E.164 terminals (PSTN/ISDN/GSM)
– Technical Report (TR): Interworking from E.164 terminals
(PSTN/ISDN/GSM) to IP terminals
David Gurle
24
TIPHON - WG 5
End-to-End Quality of Service aspects
Objective:
– description of technological issues, existing standards and
minimum requirements for acceptable QoS. Input from other
bodies will be considered wherever appropriate.
Work program:
– Technical Report: Review of current Quality of Service (QoS)
parameters
David Gurle
25
TIPHON - WG 6
Verification and Demonstration Implementation
Objective:
– build an international demonstration platform showing
Tiphon system interoperability as well as multi-vendor
interoperability of Tiphon compliant products
Deliverables:
– 3 Technical Reports: Verification and Demonstration
Implementation (VDI) for phase 1, 2 and 3
David Gurle
26
Tiphon - Next meetings in 97
• 26 and 29 September - 2 October, Boston (3Com)
• 11 - 14 November 97, Vienna (P & T Austria)
• 6 - 9 January, Sophia Antipolis (ETSI)
David Gurle
27
TIPHON - contact details
David Gurle
[email protected]
Tel: +33 4 92 94 43 55
Fax: +33 4 93 65 23 77
url: http://www.etsi.fr/tiphon/
David Gurle
28