14 November Meeting
David Foster
SEATTLE
LHC T0-T1 Meeting,
Seattle, November 2005
David Foster, CERN
Scope for new attendees
• The “simplest” part of LHC networking is getting
the data from CERN to the Tier-1 centers.
• It involves however, a number of stakeholders,
initiatives and infrastructures.
• We want to understand how this part should be
handled from a production network perspective.
• But this is only one part of the overall problem
and we don’t deal with T1-T2 production
networking issues …. Yet.
LHC T0-T1 Meeting,
Seattle, November 2005
David Foster, CERN
Current State
• We have had a number of meetings and agreed on an
overall approach with many open questions.
– Some results have been published
• http://lcg.web.cern.ch/LCG/activities/networking/nw-grp.html
– And we have a wiki site for gathering operational information.
• https://uimon.cern.ch/twiki/bin/view/LHCOPN/WebHome
• As we move more and more towards providing an
production infrastructure needed for service challenges
in 2006, many basic issues still remain.
• The purpose of todays meeting is to review what has
been done since the last meeting and decide what
remains to be done
LHC T0-T1 Meeting,
Seattle, November 2005
David Foster, CERN
Last Meeting Summary
T0/T1 Top Items
•
Version 2 of the document. (DF)
–
•
Complete some details and word for increased clarity in scope.
Where do we go from here?
1.
Security (Led by: UK – Robin Tasker)
•
•
2.
What should be done?
Agree a plan for ACL/Firewall protection.
OPN IP Network Design (Led by: CERN Edoardo Martelli)
•
Agree an IP design and routing based on a specific topology.
–
3.
Monitoring (Led by: US-LHCNet ….. Shawn Mckee …..)
•
Definition of what is needed, metrics and techniques
–
4.
Agree a framework and agree a design based on detailed hardware infrastructure understanding and monitoring
technology.
Network Operations (Led by: DANTE Roberto Sabatino)
•
Agree a process for problem determination and resolution.
–
–
–
–
•
•
Backup routes.
Pilot
LCG/EGEE GOC, ROC, CIC interface, T1 interface
Organise a small number of multiple noc’s
Organise Border equipment to the OPN
Mailing lists by Aug 20th
First draft reports by November.
LHC T0-T1 Meeting,
Seattle, November 2005
David Foster, CERN