Scope
• Asked to provide a high level overview of
the configuration database
• No technical detail is presented here –
please see preceding presentation at
CM24, or CM25 in March
2
Analysis
• Analysing real data requires knowledge of
configuration
Beamline
Settings?
Calibrations?
Cablings?
Also included:
Geometry?
Alarm handler settings
The aim is that much of this will be automated, and that even though MICE will become more
3
complicated (eg more detectors with calibrations), retrieving config parameters won’t need to be
Control Room
• We currently enter a lot of information by
hand (spreadsheet, EPICs magnet control
etc)
I want to tag
these settings
for future use.
Can I just load
beamline
parameters with
one click?
What were my
magnet
settings
yesterday?
I do not see the database replacing the e-Log, but it will replace the run settings
spreadsheet and it will allow us to automatically set the magnet currents rather
than setting them by hand in 25/50 A steps
4
Other Remote Users
• Web interface will be provided for users
who want to view configuration data
without having to use G4MICE, EPICs etc
Run conditions?
Find me all
the runs with
these
constraints….
Show me the
config
for run 01436
Easy and quick to develop for specific use cases not
listed here
5
Overhead
• There is no need for anyone in the
collaboration to know anything about
databases, SQL, etc (except me)
• Much of this functionality will be built into
the applications we already use – the user
may not even be aware they are using the
database, when they ask for the
default calibration for run 01333
• The goal is to make things easier
6
Clients
• The database can provide functionality which
client code must call upon
• No need to know anything about databases –
the database sends and receives xml which is
easy to understand.
• I can help those wishing to develop code to
understand how to easily parse the xml that
comes from the db, and can provide them with
the xml structure to send back
• (not difficult)
7
What’s to do? (non technical)
Requested
Web interface
Beamline settings
Alarm Handler Limits
Tagged beamline settings
Geometry
Calibration
Cabling
Implemented
server side






Partially
Got client
resources for
?

?

Notes:
Question marks indicate reliance on a php webserver (Yagmur to advise) – if we can use
the mice webserver then these are straightforward.
The main thing is G4MICE implementations of geometry, cabling and calibration readers
and/or writers. I need to investigate appropriateness of a secure web solution for writing
8
calibrations
Delivery
• The Database serverside code is at an advanced stage
with much of the server functionality complete (eg
geometry, beamline settings, calibrations)
• Alarm Handler functionality is easy to include
• Intention to present a finished system by CM25. This has
been scuppered by hardware failures on-site at RAL.
• BUT: We are expecting new hardware for the DB end of
February. Haven’t yet been advised when that is going to
be ready for me (understandable if there is a delay), but
when it is ready progress can continue
9
Client Code to be Developed
• The main need is for code in G4MICE to
interface the db response with the data
structures therein
• I am available to help people wanting/allocated
to do this.
• I have to write up, so will become unavailable
• The next collaboration meeting should be seen
as a last opportunity for face to face discussion
• The task is straightforward whilst this help is
available
10