HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
High School Building Project
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Site and Building Issues
•
•
•
•
•
No control point for visitor’s access to the high school.
No control point for students entering or leaving the high school.
No visible front entrance.
Vehicular traffic crosses student traffic between classes.
Existing parking areas are not well defined.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
PROGRAM ANALYSIS
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Main Building:
•
•
•
•
•
Brick work and window replacement needed.
Water infiltration needs to be addressed.
Domestic water piping needs replacement.
Interior finishes, doors and casework needs replacement.
Existing mechanical service does not provide adequate heating and
cooling.
• Existing electrical distribution system does not provide for the technology
needs.
• Science rooms plumbing is inadequate.
• Health life safety items for egress need to be addressed.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Life Expectancy – Masonry & Windows
Masonry on the 95 year old building
is needing tuck-pointing,
replacement of stone caps and sills
and parapet rebuilt.
Windows replacement is
needed.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Life Expectancy – Heating & Plumbing
Mechanical and Plumbing piping
systems are 95 years old and need
replacement.
Most restrooms and science lab do not
meet ADA requirements
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Life Expectancy – Heating
Fin tube heating does
not evenly heat rooms
Exposed heating piping in corridors is within
reach of students.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Life Expectancy – Structure
Water penetration has caused major
damage to interior walls throughout
the building.
Lower level shows signs of moisture
ands water penetration due to the age
of the building.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Codes & Safety
Assembly areas are not ADA compliant.
Guardrails do not meet current code.
Flooding occurs during heavy rains
Doors are not fire rated and hardware is
not ADA compliant
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Codes & Safety
Handrails do not meet current International
Building Code (IBC) requirements.
Exterior fire escape is not covered or
enclosed and creates a hazard in inclement
weather. It does not meet current codes.
Stairs do not comply with fire codes.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Codes & Safety
Corridors do not comply with current fire
codes.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Codes & Safety
Energy Conservation
Wooden floor structural system has
settled on second and third floors as
shown by large gaps at baseboards.
The windows have outlived their useful
life and are not energy efficient.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Energy Conservation
Heating System piping is 95 years
old. Controls are obsolete and
ineffective.
Window air conditioners do not meet current
fresh air requirements. They are inefficient,
and do not adequately cool the rooms.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Instructional Issues
•
•
70% of the classrooms are under sized to handle new technologies and teaching methods.
Science Labs labs are 30% smaller than standard labs.
–
Other Science classes taught in small classrooms, without student lab stations.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Instructional Issues
• Secure Entry Point
- No security vestibule controlling access to HS buildings.
- Administration Office not at entry / cannot control or supervise visitors gaining access to High School.
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Instructional Issues
•
Old Gym:
–
–
–
45% under size for an auxiliary gym
Space is underutilized (used about 10% of the time)
Lack of adequate space causes busing of students to remote facilities
MAIN BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Cafeteria Building:
• Exterior window system needs replacing.
• Existing mechanical service does not provide adequate heating and
cooling.
• Existing electrical distribution system does not provide for the
technology needs.
• Domestic water piping needs replacement.
• Health life safety items need to be addressed.
• Chair lift needs replaced with elevator.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Life Expectancy – Windows
Windows replacement is needed.
CAFETERIA BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Life Expectancy – Mechanical & Structural
Cooling, heating, exhaust & plumbing
issues need to be addressed.
Structural items need to be addressed.
CAFETERIA BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Codes & Safety
Interior and exterior stairs do not
meet current IBC codes for railings.
Asbestos floor tiles need to be replaced.
CAFETERIA BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Codes & Safety
Exhaust under open stairs on exterior
violates codes. This stair violates several
codes.
Exterior cooler/freezers need to be in the
building or covered.
CAFETERIA BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Gymnasium Building:
• The window needs replacement on the 1939 and 1967 portion of the
building.
• Some of the mechanical systems serving the 1939 and 1967 portion of
the building need upgrading.
• Technology labs are inadequately powered and sized, needing
relocated.
• Domestic water piping needs replacement in the 1939 building.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Instructional Issues
• Current Gym is used for P.E., athletic practices, games, Operetta practices, performances, as
well as Band/Choral performances. More space is needed for these activities.
–
Stage and gym is inadequate as a performing arts venue; acoustically inappropriate
• Locker rooms are below grade with poor air circulation and ADA concerns
• Band Room not ADA accessible
GYMNASIUM BUILDING
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3
HILLSBORO, ILLINOIS
Agriculture Building:
• Shop building's unit heaters, water heater, exhaust fans and air
conditioner needs replacing.
• Health life safety items need to be addressed.
• Domestic water piping needs replacing.
AGRICULTURE BUILDING