WMS Reporting Items
QSE Project Managers Working Group
Short Term Cost Effective Design Issues
DSM Working Group
CMWG (CSCs for 04)
Note: WMS has not met since the last meeting
of the CMWG (straw votes only)
Secondary CSC
A significant line that crosses a zonal
boundary where there is not a CSC
Can be used by Operations for CM
Does have TCRs & PCRs
Congestion cost is direct assigned
Does not impact zonal determination
Secondary CSC Concerns
Concern was expressed regarding
operations use of this tool in a manner not
predictable by market participants.
The use of Secondary CSCs requires a
change in the Protocols.
North to Houston CSC
The majority thinks operations needs a CSC
from North to Houston in 04
There is division on whether that should be
a primary or a secondary CSC
Final Straw vote was:
5 no North to Houston CSC
9 add a Primary CSC North to Houston
2 add a Secondary CSC North to Houston
Final determination of 04 CSC
is queued up for August
Action of TAC requested
CMWG (Criteria for Granting Zonal
Boundary Exceptions)
As Approved by WMS
Criteria for granting exemptions to mathematically determined
zonal boundaries:
•Not commercially significant
•For reason to keep a system intact rather than commercial gain
•Electrically near a zonal boundary
•Not opted in
•Not too big
•Not automatic
Proposed Motion
The TAC endorse the following criteria for granting exemptions
to mathematically determined zonal boundaries:
•Not commercially significant
•For reason to keep a system intact rather than commercial gain
•Electrically near a zonal boundary
•Not opted in
•Not too big
•Not automatic
WMS Action Items
PRR404 Energy Procured From ERCOT
Can a retail load chose not to used an
existing IDR meter for settlement
PRR409 Voltage Support Services from
Generating Resources
DAY Ahead Market Design Task Force
Can a premise have an IDR
settlement meter installed but
request that the billing
settlement be based on nonIDR data?
WMS voted to answer the question
NO
WMS Action Items
PRR404 Energy Procured From ERCOT
Can a retail load chose not to used an
existing IDR meter for settlement
PRR409 Voltage Support Services from
Generating Resources
DAY Ahead Market Design Task Force
Items Elsewhere on
the TAC Agenda
Voltage and Reactive Requirements